R.K Construction: Job Hazard Analysis

1. The document provides a job hazard analysis for dosing common salt at a power system site in West Bokaro, India. 2. It identifies potential hazards for shifting salt bags manually such as heavy lifting, slips/trips, sharp edges, and dust inhalation. Controls include using lifting techniques, housekeeping, PPE, and taking breaks. 3. Charging salt bags into a dosing station presents hazards like cuts, falls into grids, and musculoskeletal issues. Controls involve careful cutting, attentive movement, sweeping spilled salt, and ergonomic breaks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
415 views2 pages

R.K Construction: Job Hazard Analysis

1. The document provides a job hazard analysis for dosing common salt at a power system site in West Bokaro, India. 2. It identifies potential hazards for shifting salt bags manually such as heavy lifting, slips/trips, sharp edges, and dust inhalation. Controls include using lifting techniques, housekeeping, PPE, and taking breaks. 3. Charging salt bags into a dosing station presents hazards like cuts, falls into grids, and musculoskeletal issues. Controls involve careful cutting, attentive movement, sweeping spilled salt, and ergonomic breaks.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

R.

K CONSTRUCTION
JOB HAZARD ANALYSIS
Dept./Section Power System, West Bokaro JHA No.:03

Location of Job Date:23.01.2021


Job Description Dosing Of Common Salt
Team Who has done JHA Safety Supervisor 00
Basic job description Potential Hazards Safe Guards / Controls to be put in place Responsibility

1.Shifting of bags manually Safety: 1. Take work permit before start of Safety Supervisor
from store to dosing point. 1) Slip from hand due work.
to Heavy load Two person to lift the salt bag at
2) Obstruction on the
both ends firmly.
way of movement.
Slippery / uneven 2. Good housekeeping is to be
surface. maintained along the movement
3) Proximity with area.
structures. 3. Maintain safe distance from the
4) Handling of common structures installed nearby.
salt with bare hand. 4. Safety gloves to be worn while
5) Sharp edge of hook
handling of salt.
5. Careful handling along with
Environment:
adequate PPEs with full sleeve
Salt dust particles
Quality: clothes.
NA 6. Usage of nose mask, safety goggles
Ergonomic: compulsory while shifting.
1.Improper lifting If dust gets into the eye
posture. mistakenly , eye fountain to be
2.Continuation Of work. used immediately present nearby.
Seasonal:
7. Proper supervision for wrong
1.High Temperature
Occupational Health procedural working.
Hazard: 8. Small intervals to be provided
1.Musculoskeletal between work.
disorder 9. Drinking water facility & ORS.
10. Periodic medical check up
11. Adequate PPEs usage.

Required PPE Required Required Skill/Training Experienced site in-


Tools/Equipment charge/supervisor
Safety shoe,Safety Hook Training For material handling Available
jacket,Safety helmet,Safety
goggles,nose mask.Hand
gloves, Ear Plug

Signature of JHA Team Members


R.K CONSTRUCTION
JOB HAZARD ANALYSIS

Dept./Section JHA No.:

Location of Job Date:


Job Description
Team Who has done JHA Safety Supervisor
Basic job description Potential Hazards Safe Guards / Controls to be put in place Responsibility

2. Charging of Salt bags in Safety: 1. Safety gloves to be worn and cutting of Safety Supervisor
SST. 1.Cutting of bags with bags to be executed carefully.
knife. 2. Take steps along the dosing point
2. Get struck or stumble attentively, strict supervision needed.
down to the grids 3. Full sleeve clothes to be worn along with
present in the opening safety gloves.
of dosing point. 4. Designated bin to be used to dispose the
3. Contact with empty salt bags simultaneously to the end
common salt for a long of dosing process.
time. 4. Use nose mask and safety goggles to
4. Haphazard disposal collect sprinkled salt by sweeping of the
of empty salt backs floor and make small heaps and dispose it
after dosing. in designated bin.
Environment: 5. Plastered floor is all along the shifting to
1.Dusty area dosing point.
2. Soil contamination 6. Proper supervision during work.
Quality: 7. Small Break to be provided within work.
Ergonomic: 8. Drinking water facility on work site.
1.Improper working 9. Periodic medical check up.
posture.
2.Continuation Of work.
Seasonal:
1..Humidity
Occupational Health
Hazard:
1.Musculoskeletal
disorder

Required PPE Required Required Skill/Training Experienced site in-


Tools/Equipment charge
Safety shoe, Safety jacket, Knife, Broom Training before start of job Available
Safety helmet, Safety Training about the following SOP
goggles, nose mask. Hand
gloves, Ear Plug

Signature of JHA Team Members