0% found this document useful (0 votes)
59 views

Bar Bending Schedule For Columns On Basement Slab/Ground Floor Column

This document provides a bar bending schedule and quantities for columns on a basement slab and ground floor. It lists the bar sizes, numbers, cut lengths, and quantities for different elements including columns F1-F5, stairs, and column C2. It then calculates the total quantities of steel grades 60 and 40 required. Tables also provide the dimensions and quantities for forming the columns and other elements. Lastly, it lists the cement, sand, and crush quantities required for a 1:4:8 and 1:2:4 concrete mix.

Uploaded by

Soban Shahid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views

Bar Bending Schedule For Columns On Basement Slab/Ground Floor Column

This document provides a bar bending schedule and quantities for columns on a basement slab and ground floor. It lists the bar sizes, numbers, cut lengths, and quantities for different elements including columns F1-F5, stairs, and column C2. It then calculates the total quantities of steel grades 60 and 40 required. Tables also provide the dimensions and quantities for forming the columns and other elements. Lastly, it lists the cement, sand, and crush quantities required for a 1:4:8 and 1:2:4 concrete mix.

Uploaded by

Soban Shahid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

BAR BENDING SCHEDULE FOR COLUMNS ON BASEMENT SLAB/GROUND FLOOR COLUMN 1

NO. OF
SN DESCRIPTION BAR SIZE NO.S CUT LENGTH #3* #3 #4 #6 #8
UNITS

1 F1 #4 1 14 7.00 96

8*6 #4 1 10 9.00 93

2 F2 #4 1 8 5.50 44

4.5*4.5 #4 1 8 5.50 44

3 F3 #4 2 8 5.50 88

3.5*3.5 #4 2 8 5.50 88

4 F4 #4 1 9 5.00 45

4*5 #4 1 8 6.00 48

5 F5 #4 1 7 4.00 28

3*4 #4 1 6 5.00 30

6 C2 #6 11 5 10.00 550

#6 11 5 16.00 880

#3* 11 31 4.00 1362

7 STAIR #4 1 8 40 320

#3 1 40 4 160

FEET TOTAL= 1362 160 320 1430

KG TOTAL= 233 27 97 975

TOTAL STEEL 60 GRADE REQUIRED= 1099

TOTAL STEEL 40 GRADE REQUIRED= 233

QUANTITY REQUIRED

DESCRIPTION NO.S L B D QTY

1:4:8

1 F1 1.00 8.0 6.0 0.50 24

KOMAL ASSOCIATES
BAR BENDING SCHEDULE FOR COLUMNS ON BASEMENT SLAB/GROUND FLOOR COLUMN 2

2 F2 1.00 4.5 4.5 0.50 10

3 F3 2.00 3.5 3.5 0.50 12

4 F4 1.00 4.0 5.0 0.50 10

5 F5 1.00 3.0 4.0 0.50 6

3 STAIRS 1.00 4.0 4.0 0.50 8

70

QUANTITY REQUIRED

1:2:4

1 F1 1.00 8.0 6.0 1.50 72

2 F2 1.00 4.5 4.5 1.50 30

3 F3 2.00 3.5 3.5 1.50 37

4 F4 1.00 4.0 5.0 1.50 30

5 F5 1.00 3.0 4.0 1.50 18

6 STAIRS 1.00 30 5 0.75 113

7 C2 11.00 1.0 1.00 18.00 198

8 PLINTH BEAM 1.00 110 1.125 0.75 93

590

DESCRIPTION 1:04:08 1:02:04 TOTAL

CEMENT BAGS 7.04 103.92 111

SAND 34.48 259.79 294

CRUSH 68.97 519.59 589