PROJECT NAME
G-102-01 ( 790DBBC)
PROJECT LOCATION
AL-SHAHANIYA
NORTH
01 02 03 04 05 06 07 08 09
E E
D D
DN DN UP DN
DN DN
DN DN
STAIR 03
C DN UP
C
+4.70
F.F.L
B B
OFFICE D OFFICE D REV.01 MARCH 2020 MAW AN M.I.
FR-08 FR-25
REV.00 JAN. 2020 MAW AN M.I.
ISSUE DESCRIPTION DATE DRAWN CHECKED QA/QC
A A
OWNER
QATAR ARMED FORCES
QATAR EMIRI CORPS OF ENGINEERS
MAIN CONTRACTOR
PM/CM
01 02 03 04 05 06 07 08 09
LEAD CONSULTANT
PROJECT DESCRIPTION
DRAWING TITLE
FIRST FLOOR PLAN
DRAINAGE SYSTEM
DRAWING. NO: PART:
DR-AD-102-00 00
DRAWN BY: CHECKED BY: STAGE: REVISION:
MAW HF DD
VERIFIED BY: APPROVED BY: PLOT DATE: 01
ME AN
SCALE: PROJECT. NO:
1:150 @ A1
FIRST FLOOR PLAN - DRAINAGE SYSTEM
01 SCALE 1:150
FILE NAME: 357
DR-AD-102-00