POM Notes
POM Notes
Productivity- factors influencing productivity- concept of standard time, method study, time
and motion study, charts and diagrams, work measurements.
Assignments:
1. What is automation and explain its merits. (pg 2.2, 2.8-2.10)
2. Explain the factors influencing plant location decisions. (pg 3.12-3.20)
3. Give the meaning of material handling. Discuss the principles of material handling.
(pg 8.1, 8.6- 8.10)
4. Bring out the factors influencing productivity. (pg 13.2, 13.6- 13.8)
5. What is equipment reliability? What are the modern scientific maintenance methods?
(pg15.8, refer notes for modern scientific maintenance methods pg 71 & 72)
Text book:
Production and operations management by C.N Sontakki, Neeti Gupta and Anuj Gupta.
(Kalyani publishers)
Production is the process by which raw materials and other inputs are converted into
finished products with the help of machines, men, tools and so on.
Types of production
Job production
Advantages
2. Operators will become more skilled and competent, as each job gives them learning
opportunities.
Limitations
2. Higher level of inventory at all levels and hence higher inventory cost.
Batch production
Under batch system the work is divided into operations and one operation is done at a
time. After completing the work on one operation it is passed on the next operation
and so on till the product is complete.
Advantages
Limitations
The product completed at one operation is automatically passed on to the next till it is
complete.
Advantages
Limitations
2. Line layout needs major change with the changes in the product design.
Production management
ULTIMATE OBJECTIVES
INTERMEDIATE OBJECTIVES
Materials
Methods
ii. Ancillary function- planning & control, maintenance , purchasing, store-keeping &
materials handling
iii. Advisory function- work study, method study, operational research, inspection &
quality control.
Product
Plant
People
Process
Programme
Planning helps in supply of goods at proper time & execute the order
Operation management
It is the process whereby resources or inputs are converted into more useful products
or intangible services.
Customer Service: It is the prime objective to provide the customer with a specific
product that satisfies in terms of cost and timing. In other words, it may be defined as,
providing the customer with the 'right thing at a right price at the right time'. To
achieve this objective, it also involves the functions such as manufacturing,
transportation, supply chain, and service. In general, any organization would always
put its best efforts to achieve the standards as mentioned above.
It is the management of the conversion process which converts land, labour, capital
and management inputs into desired outputs of goods & services
Helps to understand & appreciate the role played by people in producing goods &
services
Responsibilities of POM
Production planning
Production control
Plant layout
Materials handling
Maintenance policy
Work measurement
Quality control
Motivating workers
Automation
High safety
Fast work
Process of automation
Forms of automation
Automatic management
O
p
t
u
Page |9
Robots
Others
All activities are integrated. The material continuously moves from one process to
another from machine to machine.
Transfer devices care for loading, unloading, transferring, positioning and even
discard materials.
Automatic control devices feel, sense, inspect and rectify the processing carried on by
other machines.
They are built in alarms which check & correct any devices in the standardised
procedures.
Automatic management
It resorts to computer technology. Electronic computers are man made brains, which
have decision making capacity when rightly programmed.
In factories they control the entire manufacturing process which is called Computer
Aided Manufacturing (CAM).
In offices they take over accounting, tabulating & other statistical function that will
help even in programming which can be called as Computer Aided Designing (CAD)
Robots
They are human like machines that perform jobs that are too boring, difficult or
dangerous to people
Others
Once a machine has finished one batch, the computer signals the next quantity
or component & the machine automatically repositions & retools accordingly
They are digital computers which provide shared database for 4 primary
manufacturing functions:
Engineering design
Manufacturing engineering
Factory production
Information management
Scope of automation
Manufacturing
Banking
Transportation
Construction
Advantages of automation
Fewer accidents
Reduced unsafe environments (dust, high pressure pipes, toxic spray paints, boilers
etc)
Disadvantages of automation
UNIT II
Plant Location
• Plant location refers to the area or a place where the plant will operate to produce
goods & services. Goods can be produced at a location away from the market.
Services, however are produced and consumed simultaneously, in the presence of the
consumers.
• “The function of determining where the plant should be located for maximum
operating economy & effectiveness”.
Prof. R.C.Davis
• Doing away with undesirable location (change in rules and regulation, restrictions
etc.)
• Changes in resources
• Changes in technology
•
demand etc.)
Choice of community with low cultural & educational standards, so they key
administrative & technical personnel eventually accept employment elsewhere
Theories of Location
•
Cost depends on factors such as :
Primary factors such as transport and labour cost decided the regional distribution of
industry
• Transport cost:
• If the raw material is more expensive to carry towards the factory as compared
to carry the finished products to the market plant will be located near the
centre of supply of raw materials.
• Raw materials:
• Localised- materials such as coal, iron ore, manganese, lead, sandalwood have
influence on location
• If the index is
• Labour cost:
• In case of cheap labour, the labour intensive industrial units move to the places
of cheaper & abundant supply of such labour
Factors to be considered while selecting a suitable site for a plant/ steps in plant
location/ New Theory of Industrial Location
• According to Bethel, Atwater and Smith, the vital managerial decision on location
involves the major steps namely:
• Selection of a region
• Selection of a community
• Political stability
• Transport facilities
• Suitability of climate
• Government policy
• Licensing policy
• Investment subsidies
Selection of community
• Availability of labour
• Personal factors
• Transport facilities
• Banking facilities
• Disposal of waste
• The site should be well connected by road, rail & if possible, water transport
Village site
• Advantages
• Disadvantages
City site
• Advantages
• Transport facility
• Municipal services for water, sewage disposal, public health & education are
available
• Disadvantages
• House taxes, water taxes, sanitation taxes & other similar taxes & rates are
fairly high
Plant Layout
• A plant layout refers to the arrangement of machinery, equipment & other industrial
facilities- such as receiving & shipping departments, tool rooms, maintenance rooms,
employee amenities etc,. For the purpose of achieving the quickest & smoothest
production at the least cost.
- Morris E.Hurley
• Improve productivity
• Cost associated with the movement of raw material from one place to another.
• Cost of labour
• Cost of space
• Policies of the management- with regard to size of plant, scope of future expansion,
volume of production, the quality of products etc
• Principle of flow/ orderliness – free & sequential flow of materials from the stage of
raw materials to the stage of finished goods
Types of layout
•
•
•
Straight line type
Straight line
• As the title suggest the machines are arranged in a straight line sequence of
P a g e | 19
It has 4 types:
operations. These machines are installed as near as possible because the output of one
machine becomes the input for the next machine
• It brings about economy in floor space and allows closer supervision span than
straight line
If the production is carried on outside the circle the inner portion can be used for
storage of raw materials and finished goods
• It is “odd” in the sense that there is no fixed pattern for arranging the machines but is
designed to suit the available space.
• Advantages
• Eliminates bottlenecks
• Economy in inspection
• Disadvantages
• Inflexibility
• Difficult to expand
• This refers to an arrangement whereby similar machines are placed in one department
for one distinct operation. It leads to specification.
• This type of layout is suitable for job- order involving non- repetitive process
• Advantages
• Flexibility
• specialization
• Disadvantages
• Under this type of plant layout, some of the machines may be grouped in accordance
with process layout, to be integrated into the line later on.
• In this type of layout, needed machines, tools, man-power & supporting appliances &
services are bought to a particular point at which production work progresses.
• This type of layout is very common in case of products like ship building, air- crafts,
heavy machines & installation.
• Advantages
• Quality work, as there is close supervision, strict quality control & inspection
• Disadvantages
• It is time consuming
I. Plant Building
A ideal plant building is the one which is built to house the most efficient layout that can be
provided for the process involved, and artificially attractive and of such standard shape and
design which is flexible its use and expansive units construction
1. Single-storey buildings,
2. Multi-storey buildings
SINGLE-STOREY BUILDINGS
• Most of the industrial buildings manufacturing which are now designed and
constructed are single storeyed, particularly where lands are available at reasonable
rates.
• A single-storey construction is preferable when materials handling is difficult
because the product is big or heavy, natural lighting is desired, heavy floor loads are
required and frequent changes in layout are anticipated.
Advantages of single-storey building are:
5. All the equipment is on the same level, making for an easier and more effective layout
supervision and control.
6. The danger of fire hazards is reduced because of the lateral spread of the building.
Limitations
3. High cost of transportation for moving men and materials to the factory which is generally
located far from the city
MULTI-STOREY BUILDINGS
Schools, colleges, shopping complexes, and residences, and for service industries like
Software, BPO etc. multi-storey structures are generally popular, particularly in cities. Multi-
storey buildings are useful in manufacture of light products, when the acquisition of land
becomes difficult and expensive and when the floor load is less.
Advantages
1. Maximum operating floor space (per sq. ft. of land). This is best suited in areas where land
is very costly.
3. Reduced cost of materials handling because the advantage of the use of gravity for the flow
of materials
Limitations
1. Materials handling becomes very complicated. A lot of time is wasted in moving them
between floors.
3. Floor load-bearing capacity is limited, unless special construction is used, which is very
expensive.
4. Natural lighting is poor in the centres of the shop, particularly when the width of the
building is somewhat great.
II. Lighting
• A good illumination or lighting has its own standard quality in terms of elusion of
color direction, diffusion, brightness, steadiness and absence of glare and quality.
Features of good lighting
• Clear vision
• Reduced eye stress and strain
Natural
Artificial
Natural light
• Light which is obtained from the sun through factory roofs, doors, window- openings.
• Advantages
• Available in plentiful in the tropical regions
• Free of cost
• No maintenance
• No effects of load- shedding and power failure
• Disadvantages
• Light variability during different seasons
• Intensity cannot be changed or controlled
• Uniformity, brightness depend on the position of windows and roof
openings
Artificial lighting
• Artificial lighting is the illumination through artificial or man made means such as use
of bulbs, and tubes.
• Advantages
• Uniformity
• Controlled intensity
• Guarantees shift and overtime work
• Supports natural light
• Reduces the number of windows
• Disadvantages
• High cost
Difference
Natural lighting
• Inexpensive
• Not dependable
• Less maintenance cost
• No harm to eyes
• Special effort to ensure uniformity
• Intensity cannot be controlled
Artificial lighting
• Expensive
• Dependable in all weather
• High maintenance cost
• Heat produced by bulbs is harmful to the eyes
• Even distribution
III. Ventilation
• “Ventilation is concerned largely with engineering techniques for controlling air
currents within the plant and for introducing outdoor air in a pattern and on a scale
that is just adequate to maintain satisfactory air purity”
Aspects of ventilation
Natural
Artificial
Natural ventilation
• Cross ventilation
• Slack effect – warm air rises and passes out the ventilations provided on the upper
part of the factory building.
Methods of artificial ventilation
• Exhaust system
Hot air
• Supply system- fan
• Balanced system – fan + exhaust
• Air conditioning
Cool air
Air conditioning
Air conditioning is the simultaneous control of the temperature, humidity, motion and purity
of the atmosphere in a confined space.- Jordon and Priester
Difference
Ventilation
• Circulation of air
• It is from natural sources like windows, ducts and grills
• Low cost
• Not always dependable
• Cannot be controlled or regulated
Air- conditioning
Elements of sanitation
• Control at source
• Control through enclosures
• Control by absorption
• Control through ear protection
• Control by isolating noise producing equipments
V. Industrial safety
Safety is freedom from occurrence or risk of injury or loss. Industrial safety refers to
protection of the workers from the dangers of industrial accidents.
Principles of safety
• Installation of machinery
• Hoists and lifts
• Lifting machines, chain ropes
• Pressure plants
• Floor, stairs and means of access
• Pits, sumps, opening in floor
• Excessive weights
• Protection of eyes
• Precautions against dangerous fumes
• Explosive or inflammable dust gas
• Precaution against fire.
Industrial safety
Safety is freedom from occurrence or risk of injury or loss. Industrial safety refers to
protection of the workers from the dangers of industrial accidents.
Principles of safety
Materials Management
UNIT III
Material
• It refers to all commodities that are consumed in the process of manufacture.
• It can be
• direct material (raw materials, components etc.)
• indirect material (consumable stores- soap, oil;
maintenance materials- spare parts; tools)
Material Management
• Material management is the integrated functioning of various sections of an
organization dealing with the supply of materials and allied activities in order to
achieve maximum co-ordination.
- N.K. Nair
Importance of material management
• Total cost is kept at a reasonable rate
• Indirect materials is kept under check
• Equipment's are properly utilized as there no delay in supply of materials
• Loss of direct labour is avoided
• Wastage of material is kept under control
• Supply of material is prompt and late delivery instances are very less
• Investment on material is kept under control and overstocking is avoided
• Congestion in the stores and at different stages of manufacturing is avoided
Scope of materials management
• Purchasing
• Store keeping
• Inventory control
• Issue of materials – delay, damage
• Material handling
• Disposal of scrap and surplus
OBJECTIVES
PRIMARY
1. Low purchase price
• Right place
Selection of supplier
• Financial soundness of the supplier
• Flexibility
• Size of the supplier
• Past association
Material handling
• Material handling is the art of involving movement, packaging and storing of
materials in any form by means of gravity, manual effort or power actuated
machinery.
- American Materials Handling Society
Activities of material handling
• Material handling management- production planning and control, buying storage
and distribution
• Material handling technology and engineering - technical and mechanical means
of handling and movement of the commodity be it in solid, liquid or gaseous form.
Features of material handling
• It is both arts and science
• Handling of inputs
• Use of mechanical and mechanical devices
• Coverage of establishment
• Nature of movement of materials- horizontal, vertical
• Nature of products handled- solid, liquid
Objectives of a good material handling system
• Minimization of processing time- M1-M2-M3
• Minimization of material handling cost
• Preventing damages to goods and materials
• Preventing accidents
• Improved productivity
• Elevated plant efficiency- optimum utilization
• Greater utilization of material handling equipment
• Better house- keeping (clean, well lit, non- slippery)
• Efficient store keeping
it is the study of man in relation to his working environment with special relation to
his physical posture
Objectives
• To enhance the efficiency and effectiveness with which the activities (work) is
carried out so as to increase the convenience of use, reduced errors and increase in
productivity
• To enhance certain desirable human values including safety reduced stress and
fatigue and improved quality of life
Areas covered by Ergonomics
• Work place – layout of equipment, the display of information controls
• General environment- heat, light, noise
• Other related factors- mental & physical stress, fatigue, vigilance & inspection
Relationship between plant layout & material handling
• A good layout minimises handling
• A good layout ensures minimum travel for workman thus enhancing the production
time and eliminating the hunting time and travelling time
• Plant layout integrates all the movements of men, material through a well designed
layout with material handling system
• It helps to keep material handling shorter, faster and economical
Supply Chain Management
“A supply chain consists of all stages involved, directly or indirectly, in fulfilling a customer
request. The supply chain not only includes the manufacturer and suppliers, but also
transporters, warehouses, retailers, and customers themselves.”
Decision making in supply chain management
• Product
• Inventory
• Location
• Transportation
• Information
UNIT IV
Production planning
The planning of industrial operations involves for consideration, namely, what work
shall be done, how the work shall be done & lastly, when the work shall be done
-Kimball & Kimball Jr.
To ensure that various inputs like men, machines, materials etc are available in the
required quantity & quality
making efforts to adhere to the production schedule
To ensure goods are produced according to the prescribed standards & quality
To introduced a proper system of quality control
Factors determining production control procedure
Nature of business
Scale of operations
Degree of mechanization
Type of manufacturing
Types of controls
Production planning & control
5W1H
Efficiency of production
Integrated factors of production
No over-work or under- work
Regulation of production
Objectives of production planning & control
Increasing production
Coordinating plant activity- based on sales forecast
Cost control
Rationalization of production activities- regulate flow of inputs, quality standard
consumers
Limitation of production planning & control
Based on assumption
Rigidity in the behaviour of employees
Difficult for small firms
Costly
Dependence on external factors like natural calamities, change in technology, change
in fashion etc
Techniques & Control of production planning & control
Routing Procedure
Cost involved
Purchase policy
Technical consideration
Availability of equipment & personnel
Determining materials required
Routing may be defined as the selection of paths or a route over which each piece is
to travel as it is being transformed from raw material to finished goods
P a g e | 49
Technical experience
Layout of machines
Determining of Lot sizes
Possible scrap
Normal scrap value is 5% at every stage of production
Analysis of the cost of the product
Direct material
Direct labour
Direct & indirect expenses
Preparation of production control forms
Making a report
Job cards- It contains the name of the product, quantity, scheduling and any
additional instruction. It is usually used to authorize production people in a certain
production plant.
Inspection cards
Labour cards
Tool tickets
Route sheet
Master Schedule
Utility of charts –bar chart (fixed quantity scale), Gantt chart (time scale), machine
record chart, order charts, man charts etc.,
Difference
Routing
Centralized
Decentralized
Expediting (progressing)
Capacity planning is the process of estimating the requirements of machines & men
to meet the targets of production
Capacity planning matches resources to demand
Concepts of capacity
Demand forecast
Labour efficiency against standard output
Plant efficiency
Multiplicity of the shift
Sub- contracting
Policies of the management
Quality control includes techniques and systems for the achievement of the required
quality in the articles produced & for the elimination of sub-standard goods.
Objects of quality control
Set standard
Quality control must be responsibility of a competent personnel
Measuring quality standards at every step
Unanimity among workers to maintain quality
Maintaining records of quality
Steps to exercise effective quality control
- standard deviation
- probability
Cost of production
Requirements of customers
Equipment's & tools used
Utility of products
Attitude of workers
Scale of operations
Functions of quality control
Consumer satisfaction
Quality consciousness
Better utilization of resources
Increased sales
Uniform products
Methods of quality control
Inspection
P a g e | 54
Objectives of inspection
- W. R. Spriegel
A sample is taken from the manufactured products and quality of these products is
inspected.
If the quality of the sample conforms to the pre-determined standards then it is
presumed that the quality of the whole lot is good.
Limiting levels of quality
Elements of TQM
Commitment to quality
Customer satisfaction
Measurement of quality
Prevention rather than detection
Proper training
Continuous improvement
benchmarking
Fundamentals of TQM
Focuses on customer
Management by fact
Focus on prevention
Principle of PDCA cycle – plan-do-check-act
Employee involvement
Deming’s 14 point management principles
1. Create constancy for the purpose for improvement of products & services
2. Adopt the new philosophy
3. Cease dependence on mass inspection
4. End the practice of awarding business on price tag alone
5. Constantly and forever improve the systems of production & service
6. Institute modern methods of training on the job
7. Institute modern methods of supervision & leadership
8. Drive out fear
9. Break down barriers between departments
Existing quality procedures are evaluated against ISO 9001 to ISO 9003
Corrective actions to conform to ISO 9000 requirements
Certifiable quality management system is prepared
New procedure is defined, documented & implemented
Quality manual is prepared
Pre- assessment meeting with registrar to analyse quality manual
Actual assessment of system is held
System is certified and registration is done
Benefits of ISO 9000
• Productivity means the balance between all the factors of production that will give the
greatest output for the smallest efforts
- Peter F Drucker
• P= o/I
• P= productivity
• O= output
• I= input
Measurement of productivity
Input Factors
• Labour
• Material
• Power
• Plant & machinery
• Shop expenses
Units of measurement
• Man hours, man days, man shifts, wages, idle time etc.
• Physical units of quantity, weight, volume, cost of material
• Kilowatt hours
• Capacity, usage, money value
• Machine hours, labour hours, money value
Factors influencing productivity
1. Wastage of resources
2. Poor planning of plant layout
3. Unscientific selection and training of workers.
4. Poor working conditions
5. Low motivation of workers
6. Absence of mutual co-operation between employers and employees
Work study embraces the technique of method study and work measurement study
which are employed to ensure the best possible use of human & material resources in
carrying out a specified activity
- International Labour Organization
“Method study is the systematic recording and critical examination of existing and
proposed ways of doing work, as a means of developing and applying easier and
more effective methods and reducing costs.”
• Analyze present method of doing job and develop new & better methods
• Measure the work content of a job
• Increase productivity
• Improve operational efficiency
•
•
•
•
•
•
•
•
•
•
•
Provides better job satisfaction
Time study
•
P a g e | 62
Time study is the analysis and determination of the time necessary to perform a given
task
Motion study
• Motion study is part of method study where analysis of the motion of an operator or
work will be studied by following the prescribed methods.
• Principles of Motion study
• (a) Use of the human body.
• (b) Arrangement of workplace.
• (c) Design of tools and equipment
Analytical estimation
• Technique of work measurement when the timing of the new job cannot be
synthesized as previous data is not available
• It is suitable for long & non repetitive operation
• Economical
• Single observer can conduct several work sampling
• Requires less time
• Less tedious
METHOD STUDY
• Method study is the systematic recording and critical examination or existing and
proposed ways or doing work as a means of developing and applying easier & more
effective methods & reducing cost
-British Standard Institution(BS3138)
•
•
•
•
•
Operation -
Inspection-
Transport-
Storage-
Delay- D
• Flow diagram is a drawing indicating the paths of men, material & machine in a
factory
• R.M – machines- inspection – delay – machines – inspection- packaging- dispatch
• This chart is used to record the time relationships between 2 or more workers,
machines or material
• It helps to study idle time
• Determines number of machines handled by 1 operator
• Determines number of operators required to perform a task
3.Motion Charts
• It is the model of particular machine, tools, tanks, storage etc., are laid on the floor
plan to give a clear cut picture of the layout plan
6. String diagrams
• The string diagram is a scale layout drawing on which, length of a string is used to
record the extent as well as the pattern of movement of a worker working within a
limited area during a certain period of time
• Helps to identify better layout
• Convenient work station
• Standard time is the time required by an average skilled operator, working at a normal
pace, to perform a specified task using a prescribed method
• Staffing
• Line balancing
• Material requirement planning
• Wage payment
• Cost accounting
• Employee evaluation
• Time study
• PMTS
• Standard data system
• Work sampling
Unit V
•
•
•
•
•
•
•
•
•
•
•
condition.
Maintenance management
Tangible cost
•
•
Down-time cost- machine break down
Idle wages
Loss of materials
Cost of repairs
Opportunity cost
Impact on other machines- repairs, break down
Expediting costs- not anticipated cost
Customer satisfaction
Maximize the useful- life of the equipment
k
B
o
v
d
r
P
t
n
i
a
m
e
c
/
w •
•
•
•
•
•
•
•
•
•
•
•
•
•
Accident cost
Added set-up cost
Tool breakage
Premium paid on spare parts – urgency/ demand
Intangible cost
• Increased accidents
• Inefficient use of staff resources.
Preventive Maintenance
• Scheduling is the function of coordinating all of the logistical issue around the issues
regarding the execution phase of the work. Scheduled of maintenance jobs basically
deals with answering two questions—‘Who’ and ‘When’ of job, i.e., “who would do
the job” and “when the job would be started and done”.
Maintenance schedule techniques
• Weekly general schedule is made to provide weeks worth of work for each employee
in an area.
• Daily schedule is developed to provide a day’s work for each maintenance employee
of the area.
• Gantt charts are used to represent the timings of tasks required to complete a project.
•
•
•
•
•
•
PERT(program evaluation & review technique)/CPM are used to find the time
required for completion of the job and helps in the allocation of resources.
Total productive maintenance(TPM)
• Preventive maintenance
Predictive maintenance
Zero defectives
zero breakdowns
zero accidents
Modern Scientific Maintenance Methods
•
P a g e | 71
Bar charts used for technical analysis which represents the relative magnitude of the
values.
Component reliability
System reliability
Six Sigma Maintenance
• Sigma is the Greek symbol used by statisticians to refer to the six standard deviations
• Six sigma is a maintenance process that focuses on reducing the variation in business
production processes. By reducing variation, a business can achieve tighter control
over its operational systems, increasing their cost effectiveness and encouraging
productivity breakthrough.
Enterprise Asset Management (EAM)
• It is the organized and systematic tracking of an organization’s physical assets i.e., its
plant, equipment and facilities. EAM aims at best utilization of its physical assets.
• It ensures generation of quality data and timely flow of required data throughout the
organization.
Lean Maintenance
• Lean system recognizes seven forms of waste in maintenance. They are over
production, waiting, transportation, process waste, inventory, waste motion and
defects. In lean maintenance, these wastes are identified and efforts are made for the
continuous improvement in process by eliminating the wastes. Thus, lean
maintenance leads to maximize yield, productivity and profitability.
Computer Aided Maintenance
• For optimal maintenance scheduling, large volume of data pertaining to men, money
and equipment is required to be handled. This is a difficult task to be performed
manually.
• Here programs are prepared to have an available inputs processed by the computer.
Waste management
Waste
• Abnormal loss- any loss occurred due to theft, fire, careless handling etc., it can be
controlled.
• Value of abnormal waste
normal cost
normal output
scrap
• Spoiled products cannot be economically rectified and are sold for a disposal value
• Spoilage arises due to poor workmanship, poor quality of material etc.
• Types of spoilage- normal, abnormal
Control of wastage, scrap, defectives & spoilage
• Timely preparation of reports relating to the wastage, scrap, defectives & spoilage
• Proper quality control
• Assigning trained employees
• Periodic review of production process
• Use of latest technology
Steps in waste management
• Obsolete materials are those which are no longer required for production due to
change in technology, design, fashion etc.