Design of Pipe Encasement For Road Crossing at 8.405Km
Design of Pipe Encasement For Road Crossing at 8.405Km
405KM
Moving loads
Considering class 'A' loading
Total Live load 11.400 t
Load on each wheel = 11.4 / 2 = 5.7 tonnes
Ground Contact Area of each Wheels 250 x 500
Spacing of wheels in Longitudinal direction = 1.2 m
Spacing of wheels in each Axle = 1.8 m
Load Dispersion on Longitudinal direction = 250 + 2 H Tan 45 + 1.2
2.85 m
Load Dispersion on Transverse direction = 500 + 2 H Tan 45 + 1.8
3.7 m
Load Dispersion each wheel = ( 250 + 2 H Tan 45 ) x ( 500 + 2 H Tan 45 )
2.85 x 3.7
= 3.135 m2
Live load on slab = (5.7) / (3.135) = 1.818 t/m2
Live Load on slab due to Over lapping longitudinal direction = 1.818
Live Load on slab due to Over lapping in transverse direction = 1.818 t/m2
Total Live Load on slab = 5.455 t/m2
Load dispersoin
Load / m run due to class ' A' loading including 25% impact and other dynamic
load nature.
1
Intensity of loading including impact 6.818 t/m2
Total load on top slab 9.561 t/m2
2
b Load on bottom slab
Self weight of verticals 6.25
Wt of bottom haunches 0.023
6.2725
Total load on bottom slab 15.833 t/m2
or say 15.833 t/m2
9.561 0.612
A B
C D
15.833 2.385
2.385 t/m
0.612 t/m
3.000
3
Due to triangular loading at A
=1/10 x 0.5 x l2 x 2.00 0.798
Mca 1.257
or 1.257
Moment distribution factors
Joint A and C
Kab = d3 / l 0.042
Kac = d / l
3
0.042
0.084
Distribution Factors
AB 0.500
AC 0.500
Joint B and D
Kba = d3 / l 0.042
Kbd = d / l3
0.042
0.084
4
MOMENT DISTRIBUTION
-3.526 3.526
0.132 D D -0.132
-0.132 C C 0.132
0.263 D D -0.263
-0.263 C C 0.263
0.525 D D -0.525
-0.525 C C 0.525
1.05 D D -1.05
-1.05 C C 1.05
2.1 D D -2.1
-1.545 C C 1.545
3.09 D D -3.09
-7.171 7.171
A B
0.500 0.500
0.1315
-0.991
-3.528
-0.132
-0.263
-0.525
-1.050
-2.655
-3.090
-2.100
-0.525
-0.263
-0.132
3.526
0.991
0.500
0.500
0.132
0.263
0.525
1.050
2.100
3.090
2.655
1.050
0.525
0.263
-1.05
D C D C D C D C D C D
D
C
C
D
D
C
C
D C D C D C D C D C D
-7.121
-1.257
-0.132
-0.263
-0.525
-1.050
-2.100
-5.309
-1.545
-1.050
-0.525
-0.263
-0.132
0.500
1.257
7.122
0.500
0.132
0.263
0.525
1.545
5.309
2.100
1.050
0.525
0.263
0.132
1.05
0.500 0.500
C D
11.875 -11.875
-5.309 D D 5.309
2.655 C C -2.655
-2.1 D D 2.1
1.05 C C -1.05
-1.05 D D 1.05
0.525 C C -0.525
-0.525 D D 0.525
0.263 C C -0.263
-0.263 D D 0.263
0.132 C C -0.132
-0.132 D D 0.132
7.121 -7.121
5+3
Final end moment aft er Moment Distribution
-3.526 A B 3.526
tm tm
x
3.000
Ra 14.341 t Rb 14.341 t
a. Member AB & BC
Ra =Rb=Wl/2 = 14.341 t
W= 9.561 t
Shear correction = 0.000 t
Actual Ra = 14.341 t
Actual Rb = 14.341 t
Maximum +ve B.M occur a distance at a distance of x from 'A'
Mxr = Ra . X - wx2/2 -Mab =
By differentiating with respect to x
x = 1.5 m
Substituting value of in the x
Mmax = 7.23 or say 7.230
2. Bottom Members
15.833182 t/m
7.121 c d -7.121
tm tm
x
3.000
Rf 23.750 t Rg = 23.750 t
6+4
a. Member CD
Rd =Rf=Wl/2 = 23.750 t
W= 15.83318
Shear correction = 0t
Actual Rc = 23.750 t
Actual Rd = 23.750 t
3. End Member
0.612 t
3.526 A Ra= 0.065
tm
H= 2.500
7+4
Ra Rb
14.341 14.341
3.5275
3.526
7.121
7.122
3.681 C 10.691 D
Rc 7.121 7.121 3.681 Rd
23.750 23.750
Rc Rd
8+6
a. Design of slab
Maximum mid span moment = 10.691
Grade concrete mix M20
scb = 70 Kg/cm2
sst = 1500 Kg/cm2
Q = 11.708
j = 0.872
M = Qbd 2
d = 30.22
cms
Provide over all depth = 50
cms
Effective depth = 39
against depth of 30.22
Area of steel required at mid span
Ast = M / (sst j d ) = 20.95 Sqcms
Dia of bars proposed to use = 16
Area of bar = 2.01
spacing = 9.59
Hence provide 16mm dia bars at 9 cms C/C
Actual steel provided = 22.333 Sqcm against 20.95
16 mm dia bar
at 9 cms C/C
100
Ast = 22.333
d d-n
N 50 A
n
dc Acs = 22.333
9+6
Mid span Moment = 10.691 tm
Thrust = 3.681 T
m = 13.33
Cover = 5 cms
Effective depth = 45 cms
Overall depth = 50 cms
permissible stress = 70 kgs/cm2
in concrete
permissible stress = 1500 kgs/cm2
in steel
P = 3.681
To find nuetral axis the N.A.(na) = bn 2/2 +(1.5m - 1) Asc (n - dc) = m Ast (d- n)
10+6
Shear force at 0.15m from inner face of the vertical member G
Shear force = wl /2 + shear correction - w . 0.15
= 21.375
Shear stress = tv = F / b.d
= 4.750
Allowable shear stess for M20
Pt = 100 . Ast / b . d
= 0.496
As per IS code 456 for 0.496 tc 4.781 Kgs/Cm2
Shear resisted by the cranked bars = Ast / 2 . Sin 450 .sst
= 11.8421
Shear resisted by concrete alone = tc . b , d
= 21.5136
Total shear resisted = 33.3560
Hence no reinforcement is necessary
Distribution steel
As per clause 7.H of I.S. 3370 Pt II
The steel required 0.16%. Hence each face will be of 0.08%
4.000 cm2
Spacing = 19.625 Cm
Using 10 mm tor bars at 28 Cm C/C
11+6