FNPDC Project, Yanbu, KSA Daily HSE Preparedness Checklist: Coverage Area: Date: Brief Description of Activities

This document is a daily HSE (health, safety, and environment) preparedness checklist used at the FNPDC Project in Yanbu, KSA. It contains 10 sections to check permit compliance, confined space entry, work at heights, hot work, lifting operations, general safety points, stop work authority, reporting of unsafe acts and conditions, and permits signed. The purpose is to ensure all necessary safety precautions and permits are in place before daily activities through observations and sign-off from an HSE supervisor.

Uploaded by

Ahmad Bilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
332 views2 pages

FNPDC Project, Yanbu, KSA Daily HSE Preparedness Checklist: Coverage Area: Date: Brief Description of Activities

This document is a daily HSE (health, safety, and environment) preparedness checklist used at the FNPDC Project in Yanbu, KSA. It contains 10 sections to check permit compliance, confined space entry, work at heights, hot work, lifting operations, general safety points, stop work authority, reporting of unsafe acts and conditions, and permits signed. The purpose is to ensure all necessary safety precautions and permits are in place before daily activities through observations and sign-off from an HSE supervisor.

Uploaded by

Ahmad Bilal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

FNPDC Project, Yanbu,KSA

Daily HSE Preparedness Checklist

Coverage Area : Date:


Brief Description of activities:

Observation
SI.No. Description Remarks
(Yes/No/NA)
Permit to work
 Correct permit for the task being planned and valid
1.  Quality of JSA -Activity covered in the JSA and controls
put in place good enough based on worksite condition.
 Safety controls as per JSA visible and followed
Any work inside Confined space
 CSE permits obtained.
 Illumination checked and sufficient prior to start
working.
 Ventilation and circulation of air good enough to
2.
maintain safe work.
 Atmospheric test done and records maintained with
Hole watcher/ Permit pack
 Hole watcher trained and available at work location and
having briefed for Emergency responses
Work at height
 WAH checks are completed after physically verifying
the work locations.
 Drop Zone identified and barricaded and sign boards
3. placed
 Floor openings are protected from fall of materials /
personnel
 Tools lanyards are used and secured
 Lifting bags used for shifting materials
Hot work locations
 Trained Fire warden assigned.
 Sufficient Fire extinguishers provided
 Provided fire extinguishers are inspected and good to
use
 Flammable materials are removed /or protected
 Hot work safety awareness training completed by the
4.
personnel engaged with grinding/ welding/ using open
flame etc
 Dead man switch provided in all portable electrical
hand tools
 Cables are protected from damages/ routed to avoid
trip hazards / etc
 Earthing provided
FNPDC Project, Yanbu,KSA
Daily HSE Preparedness Checklist

Lifting operation using crane


 Daily checks are recorded by the operator and copy
maintained.
 Safety devices are operational and equipment is free
from defects
 TPI certificate valid and copy available with equipment
5.
including chain block used
 Equipment completed with P&M inspections and
stickers valid
 Fire extinguisher within the equipment are inspected
and good to use
 Area barricaded and signage provided
General points
 Housekeeping maintained at work locations
 Access and Egress to worksite is good enough for
Emergency rescue
 Mobile Equipment are provided with trained Flagman
6.  UA/UC observed are corrected and recorded in
employee’s passport.
 NMI if any investigated and necessary corrective
actions initiated. Report all NMI.
 Grievance from employees are shared with HSE
Manager / Site Management.
STOP work authority
 Any unsafe work practices having potential to hurt
7. personnel / or damage asset MUST be stopped
immediately and reported to Site management/ HSE
Manager.
UA/UC reported in credibility system
Unsafe act -HP MP LP
8
Unsafe condition - HP MP LP

Number of permits signed


9

Any other points / concern ( Not specified above)