Checklist Pv-Genset: Location
Checklist Pv-Genset: Location
Location
□ Location of the PV-Genset system (Region, Country, specific GPS coordinates, altitude):
□
Are there any local requirements (codes, standards, zero feed in) to fulfil? Yes/ □
No
If yes: Which: ________________________________________________________________________
Genset Data
Is it a □ Single Genset or □ Multi Genset system?
□ Genset manufacturer/model:_______________
Please attach datasheet of the Genset!
□ Genset-Controller:____________
□ Nominal Apparent Power of the Genset(s) in kVA.
Genset A: __________ kVA,
Genset B: __________ kVA,
Genset C: __________ kVA
□ Nominal/Maximum Active Power of the Genset(s) in kW.
Genset A: __________ / ___________ kW,
Genset B: __________ / ___________ kW,
Genset C: __________ / ___________ kW
02/2017 1/3
Load Data
□ Please attach a load profile for one year!
□ Please attach Average/Min/Max consumption (if not obvious from the load profile):
Summer Winter
Night 7-9 9-15 15-17 Night 7-9 9-15 15-17
Max
Min
Average
Economics
□ Diesel price (delivered at site): ______USD or EUR per liter
or
□ Electricity price from the Genset: ______USD or EUR per kWh
Please send the PV-Genset Checklist with attachments (datasheets, load profiles) to [email protected] .
02/2017 2/3
Schematic of the Fronius PV-Genset Solution
02/2017 3/3