Charles Hanskat, P.E., FACI, FASCE Managing Principal Concrete Engineering Group, LLC
Charles Hanskat, P.E., FACI, FASCE Managing Principal Concrete Engineering Group, LLC
, FACI, FASCE
Managing Principal
Concrete Engineering Group, LLC
ACI 350-06 Code Requirements for
Environmental Engineering Concrete
Structures
Intended for who?
Designers
Not appropriate for Contractors
ACI 350.5 Specification for
Environmental Engineering Concrete
Structures
Is specifically and entirely intended
for the Contractor
ACI 301 is intended for
Structural concrete for buildings
Parallels ACI 318
ACI 350.5 is intended for
Structural concrete for liquid-
containing structures
Parallels ACI 350
Liquid-Containing Structures (LCS) are not
the same as building
Higher loads
Dynamic loads
Constant exposures to aggressive
environments
Liquids
Chemicals
Extremely sensitive to cracking that
affects serviceability
Through section cracks 5 mils wide will
leak
High fluid pressure
Special Structures or Processes not
Covered by ACI 301
Membrane floors
Thin, highly reinforced concrete slabs
on soil.
Circular wrapped prestressed tanks
Shotcrete
Similar Layout and Organization
Greater Cover Requirements
Enhanced Material Requirements for Exposures
Shotcrete
Higher Prestressed Reinforcement Protection
Additional Section on Wrapped Prestressed
Reinforcement
Includes “Membrane Floors”, Doesn’t Include
“Industrial Floors”
“ACI Specification 350.5 cannot and
does not address responsibilities for
any project participant other than
Contractor.”
Guidance to the specifier
Mandatory
Optional
Are not part of the ACI 350.5 Specification
Serve as Flags
Items Specifier evaluates in developing the
specific Project Specification
Mandatory Checklist Items
“indicates work requirements regarding
specific qualities, procedures, materials,
and performance criteria that are not
defined in ACI Specification 350.5.”
Mandatory Checklist Items
“The Specifier must include these
requirements in the Project Specification.”
Optional Checklist Items
“identifies Specifier choices and
alternatives. The checklist identifies the
Sections, Parts, and Articles of the ACI
Reference Specification 350.5 and the
action required or available to the Specifier.
”
Optional Checklist Items
“Specifier should review each of the items in
the Checklist and make adjustments to the
needs of a particular project by including
those selected alternatives as mandatory
requirements in the Project Specification.”
ACI 350.5 Completed
Committee Balloting
TAC Review
Public Review
Response to Public Comments Complete
Next is Approval of Standards Board
Publication Formatting
Committee Review of Proofs
Publication – Maybe End of 2012, Early 2013
Font, size, and color for text have been formatted
for you in the Slide Master
Use the color palette shown below
See next slide for additional guidelines
Hyperlink color: www.microsoft.com
3 Series 1
Series 2
2 Series 3
0
Category 1 Category 2 Category 3 Category 4
Chart Title
9%
10% 1st Qtr
2nd Qtr
23% 58% 3rd Qtr
4th Qtr
6
4 Series 1
3 Series 2
Series 3
2
Series 4
1
0
Category 1 Category 2 Category 3 Category 4
14
12
10
8 Series 3
6 Series 2
Series 1
4
0
Category 1 Category 2 Category 3 Category 4
Name
Title
Group
Name
Title
Company
Name
Title
Company