100% found this document useful (2 votes)
941 views2 pages

Key Personnel Bio-Data: Standard Form Number: SF-INFR-47 Revised On: August 11, 2004

This document contains a standard form for submitting key personnel bio-data as part of a bid for a construction project. The form requests information such as name, date of birth, nationality, education, specialty, length of service, years of experience, and details of relevant work experience for the past 10 years. It certifies that the listed personnel can be assigned to the project if the contract is awarded and is signed by an authorized representative. The purpose is to provide qualification and experience details of contractor key personnel, including their commitment to work on the project, as required for the technical proposal.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
941 views2 pages

Key Personnel Bio-Data: Standard Form Number: SF-INFR-47 Revised On: August 11, 2004

This document contains a standard form for submitting key personnel bio-data as part of a bid for a construction project. The form requests information such as name, date of birth, nationality, education, specialty, length of service, years of experience, and details of relevant work experience for the past 10 years. It certifies that the listed personnel can be assigned to the project if the contract is awarded and is signed by an authorized representative. The purpose is to provide qualification and experience details of contractor key personnel, including their commitment to work on the project, as required for the technical proposal.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Standard Form Number: SF-INFR-47

Revised on: August 11, 2004

KEY PERSONNEL BIO-DATA

1. Name :

2. Date of Birth :

3. Nationality : Filipino

4. Education and Degree/s :

5. Specialty : Construction Safety

6. Registration :

7. Length of Service with the Firm : ___ years


From ___________
To _________
8. Years of Experience : ___ Years
9. If Item 7 is less than ten (10) years, give name and length of service with previous
employers for a ten (10)-year period (attached additional sheet/s), if necessary:

Name and Address of Employer Length of Service

________________________ __________________________

10. Experience:
This should cover the past ten (10) years of experience. (Attached as many pages as
necessary to show involvement of personnel in projects using the format below).

1. Name : 3 Storey w/ Roofdeck Commercial/Residential


Project

2. Name and address of owner : RAV Prime Property, Inc


Alta Vista Subd., Antipolo City

3. Name and Address of the Owner’s : Archt. Rhodel P. Laranan


Engineer Alta Vista Subd., Antipolo City

4. Indicate the Features of Project : Building Construction


(Particulars of the project components
and any other particular interest
connected with the project)

5. Contract Amount Expressed in


Philippine Currency : P 40,300,000.00

One of the requirements from the bidder to be included in its Technical Envelope is a list of contractor’s key
personnel (viz., Project Manager, Project Engineers, Materials Engineers, and Foremen), to be assigned to the
contract to be bid, with their complete qualification and experience data (including the key personnel’s signed
written commitment to work for the project once awarded the contract).
Standard Form Number: SF-INFR-47
Revised on: August 11, 2004

6. Position : Safety Officer

7. Structures for which the employee


was responsible : Entire Building

8. Assignment Period : From December 10, 2014


To November 29, 2016

Renato D. Laforteza
Safety Officer

It is hereby certified that the above personnel can be assigned to this project, if the contract is
awarded to our company.

Dagupan City, Pangasinan – June 1, 2020 Carlito A. Dion, C. E.


Place and Date Authorized Representative

One of the requirements from the bidder to be included in its Technical Envelope is a list of contractor’s key
personnel (viz., Project Manager, Project Engineers, Materials Engineers, and Foremen), to be assigned to the
contract to be bid, with their complete qualification and experience data (including the key personnel’s signed
written commitment to work for the project once awarded the contract).

You might also like