READY RECKONER FOR SCHWING CONCRETE PUMP MAINTENANCE - BP 350
2
Initial Maintenance
After 50 working hours
14
4
After 150 working hours
8 5.0 Maintenance Of Concrete Pump
After 250 working hours
14
5 1-
Clean the filter cartridge when the warning lamp lights up.
After 500 working hours
2-
Change oil in agitator gear box (spur gear fig. 16)
2 4-
Change oil in compressor
After 1000 working hours
5-
Change Hydraulic oil
6 11 6-
Check oil and water level (hydraulic tank, Flushing container
Daily
10 and water box) and replenish, if necessary.
7 9 7 - Check oil level in agitator gear box and compressor, replenish
Normal Maintenance
Weekly
if nacessary.
8 12 8 - Clean suction filter of compressor
Monthly
9 - Check system pressure (System- 240bar, Agitator - 90bar
8 Compressor - 140bar)
All 250 working hours
14 10 - Greasing of agitator shaft bushing. Drain condensed water
4 from hydraulic tank
All 1000 working hours
11 - Clean the concrete pump
2 5 12 - Check fixing bolts of components mounted on chassis frame
All 2000 working hours
13 for tightness.
13 - Change suction filter.
14 Change Engine oil, oil filter and diesel filter.
** Change the FORM LACE RINGs(80002541) : 1st after 700 cum, thereafter every 2000 cum of concrete.
** Engine oil (20W40) 18 liters, Fuel and oil filter : 1st after 50 hours, thereafter every 250 hours of operation.
RPM @ 2100
** Replace the RAMs(10007943) when sand starts coming into water box
** Replace the SEALING CONEs(10004928) when cement slury starts coming out from either sides of agitator
mounting.
** Replace the SEALING SET FOR PLUNGER(10011127) when hydraulic oil starts coming out from flushing
container.
** Replace the SEALING SET FOR ROD(10013369) when both the rings become too loose in the gate valve shaft.
** Hydraulic oil grade: SHELL TELLUS 2HF 68SS, Hudraulic Filter - 10002989