0% found this document useful (0 votes)
597 views2 pages

33kV CT Test Report

This document is a test report for current transformers (CTs) installed at the Shantahar 33/11kV substation in Bangladesh. It provides key details of the CTs such as the manufacturer, ratings, and test results. The CTs were tested for accuracy with primary currents injected at 450A and secondary currents measured. Core allocation and winding resistance were also tested and found to be correct. All test results indicated the CTs met specifications and are suitable for metering and protection purposes at this substation.

Uploaded by

zahidul Islam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
597 views2 pages

33kV CT Test Report

This document is a test report for current transformers (CTs) installed at the Shantahar 33/11kV substation in Bangladesh. It provides key details of the CTs such as the manufacturer, ratings, and test results. The CTs were tested for accuracy with primary currents injected at 450A and secondary currents measured. Core allocation and winding resistance were also tested and found to be correct. All test results indicated the CTs met specifications and are suitable for metering and protection purposes at this substation.

Uploaded by

zahidul Islam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

33kV CT Test Report Page 1 of 2

Customer Bangladesh Power Development Board (BPDB)


Project DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
33/11KV NEW 2X10/13.33MVA AT SANTAHAR AT BOGRA AIS SUB
STATION, RAJSHAHI ZONE. (PACKAGE NO-AIS-3)
Contract Contract No-10349,DTD-28.12 2017
Substation Shantahar 33/11kV Substation
Location/Feeder 33kV Grid Incoming Feeder (L1)

Equipment Data

Manufacturer Mehru Electrical & Mechanical


Serials
Engineers (P) Ltd., India
Type Live Tank R OC-8879/11/1/19
Standard IEC 61869 Y OC-8879/5/2/19
Rated Current 600-300/5-5A B OC-8879/11/5/19
Insulation Level 70/170kV
Short Time Current 25kA 3s

Core 1 Core 2
Ratio 600-300/5A 600-300/5A
Burden VA 30 30
Output Class 0.2 5P20

Primary injection Test


1S1 – 1S3 = 600/5A
2S1 – 2S3 = 600/5A

Primary Current Secondary Actual


Core CT Ratio Error
Phase Current Current Current
R 450 A 3.61 3.75 0.14
1S1 – 1S3 Y 450 A 3.62 3.75 0.13
B 450 A 3.59 3.75 0.16
120
R 450 A 3.57 3.75 0.18
2S1 – 2S3 Y 450 A 3.60 3.75 0.15
B 450 A 3.58 3.75 0.17

Core Allocation Test

Core Allocation Setting core Star point


Core
Phase Status
R OK 1S1-1S3 1S1
1S1 – 1S3 Y OK For
B OK METERING
R OK 2S1-2S3 2S1
2S1 – 2S3 Y OK For CT winding resistance
B OK Protection
For SEA/AKES For SWPL For BPDB/NESCO Date:
30/12/2020
33kV CT Test Report Page 2 of 2

Customer Bangladesh Power Development Board (BPDB)


Project DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF
33/11KV NEW 2X10/13.33MVA AT SANTAHAR AT BOGRA AIS SUB
STATION, RAJSHAHI ZONE. (PACKAGE NO-AIS-3)
Contract Contract No-10349,DTD-28.12 2017
Substation Shantahar 33/11kV Substation
Location/Feeder 33kV Grid Incoming Feeder (L1)

test

Core Ratio Phase Resistance(Ω)


R .24
1S1 – 1S2 300 Y .25
B .26
R .5
1S1 – 1S3 600 Y .5
B .5
R .26
2S1 – 2S2 300 Y .25
B .24
R .70
2S1 – 2S3 600 Y .70
B .70

For SEA/AKES For SWPL For BPDB/NESCO Date:


30/12/2020