Job Safety Analysis Erection Silo

The document provides a job safety analysis for erecting a silo, outlining potential hazards such as falling, being caught by equipment, uncontrolled swinging of the silo, and colliding with other equipment. It recommends safety precautions and procedures to address each hazard, such as using spotters, wearing proper protective equipment like harnesses and gloves, following weight limits, and ensuring only competent personnel perform the tasks. The analysis was conducted by Fadli Zuchri to erect a silo at PT Kaltim Prima Coal's D1 Surya site on September 11, 2009.

Uploaded by

Danang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
421 views3 pages

Job Safety Analysis Erection Silo

The document provides a job safety analysis for erecting a silo, outlining potential hazards such as falling, being caught by equipment, uncontrolled swinging of the silo, and colliding with other equipment. It recommends safety precautions and procedures to address each hazard, such as using spotters, wearing proper protective equipment like harnesses and gloves, following weight limits, and ensuring only competent personnel perform the tasks. The analysis was conducted by Fadli Zuchri to erect a silo at PT Kaltim Prima Coal's D1 Surya site on September 11, 2009.

Uploaded by

Danang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

JOB SAFETY ANALYSIS

Erection Silo

PT Kaltim Prima Coal Job NAMA TUGAS (dan nomor jika ada): TGL: 11 Sep 09
Erection Silo
JOB SAFETY ANALYSIS HAl DARI JSA NO.
INSTRUKSI DI BALIK LEMBAR INI JABATAN ORANG YG MELAKUKAN TUGAS SUPERVISOR: ANALYSIS OLEH: Fadli Zuchri
INI:

PERUSAHAAN: AEL LOKASI/GEDUNG: D1 Surya DEPARTEMEN: DITINJAU OLEH:

PERALATAN PELINDUNG DIRI YG DIHARUSKAN DAN/ATAU DISARANKAN: DISETUJUI OLEH:


Safety harness, helmet, safety shoes, vest, hand gloves
NO BAHAYA TINDAKAN DAN PROSEDUR YG DISARANKAN
1 Lowboy (the unit that bring Silo) to be located  Collate with  Spotter
 Personal in charge at the plant should have
communication with lowboy operator

2 Installing the sling to the silo  Competent person


 Falling down  Safety body harness
 Caught by

514038154.doc 1
JOB SAFETY ANALYSIS
Erection Silo
 Silo fallen down  Comply with SWL
 Uncontrolled swing  Proper sling installation
3 Silo erection  Fall by  Competent person
 Caught by
 Spotter
 KIMPER KPC

4 Moving Lowboy  Collate with  Spotter


 KIMPER KPC

5 Tighten Bolt  Caught by  Competent person


 Manual handling
 Proper tool