Method Statement Log: Mvac B12

The document contains logs of method statements and shop drawing submittals for an HVAC project at a building referred to as DHQC. The logs list details of the submittals such as submission number, revision number, description, originator, dates, and status. However, most of the entries are blank, indicating the logs are still being populated with submittal information as the project progresses.

Uploaded by

Kumudu Perera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

Method Statement Log: Mvac B12

The document contains logs of method statements and shop drawing submittals for an HVAC project at a building referred to as DHQC. The logs list details of the submittals such as submission number, revision number, description, originator, dates, and status. However, most of the entries are blank, indicating the logs are still being populated with submittal information as the project progresses.

Uploaded by

Kumudu Perera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 72

CENTRAL ENGINEERING CONSULTANCY BUREAU

D H Q C - BUILDING PROJECT
MVAC B12 METHOD STATEMENT LOG Run Date
CECB Responded
MS S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date
Date
MS/MVAC/DHQC/01 MVAC
MS/MVAC/DHQC/02
3/4/2021 6:32

Remarks (concise response)


CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

SH/MVAC/DHQC/01

Page 5 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 6 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 7 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 8 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 9 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 10 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 11 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 12 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 13 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B1 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 14 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

SH/MVAC/DHQC/01

Page 15 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 16 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 17 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 18 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 19 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 20 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 21 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 22 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 23 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B2 Shop Drawing Submittal Log Run Date 3/4/2021 6:32

Actual Submission CECB Commented


SD # Rev.# Contractors Shop Dwg. No. Description Discipline Originator Building Status Remarks
Date Date

Page 24 of 72
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 MATERIAL APPROVAL LOG Run Date 3/4/2021 6:32

Supplier Sub-con Actual Submission Date Consultant


MAR # Rev.# Material Description Manufacturer/ Make Status Remarks File Number
Name Ref. No. Date Commented
MR/MVAC/DHQC/01
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 Technical submittal log Run Date 3/4/2021 6:32

Prepared Date of CECB Responded


MS # Rev.# Description Status Remarks File No.
By submission Date
TEC/MVAC/DHQC/01
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 REQUEST FOR INFORMATION LOG Run Date 3/4/2021 6:32

CECB Responded
RFI S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date Remarks (concise response)
Date
RFI/MVAC/DHQC/001
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 REQUEST FOR INFORMATION LOG Run Date
CECB Responded
RFI S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date
Date
RFI/MVAC/DHQC/B12/PM001
3/4/2021 6:32

Remarks (concise response)


CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 REQUEST FOR INFORMATION LOG Run Date
CECB Responded
RFI S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date
Date
RFI/MVAC/DHQC/001
3/4/2021 6:32

Remarks (concise response)


CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 REQUEST FOR INFORMATION LOG Run Date
CECB Responded
RFI S/No. Rev. Description (Concise Content of RFI) Discipline Block Originator Submittal Date
Date
RFI/MVAC/DHQC/IR-001
3/4/2021 6:32

Remarks (concise response)


CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 CONTRACTOR'S LETTER LOG Run Date 3/4/2021 6:32

CECB Responded
Ref No. Description Originator Submittal Date Remarks (concise response)
Date
DHQC/AC-12/GEN 001
3/4/2021 6:32

Ref File
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 CONTRACTOR'S LETTER LOG Run Date
CECB Responded
Ref No. Description Originator Responded to Remarks (concise response)
Date
CB/DHQC/MEPI/MVAC/B8 (001)
3/4/2021 6:32

Ref File
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 CONTRACTOR'S RESOURCES PLAN Run Date
CECB Responded
Ref No. Description Originator Responded to Remarks (concise response)
Date
RP/MVAC/DHQC/001
3/4/2021 6:32

Ref File
1. Revised Architectural drawings to be considered as instructed in
the meetings.
2. AHU capacities are not finalized yet. Duct sizes to be adjusted
after finalizing the capacities of AHUs.
3. Drawing to be revised to eliminate the coordination issues
mentioned by you at the progress meeting held on 10.07.2019
4. Incorporate typical equipment/installation details shown in the
following drawings.
a)(002)DHQC-CECB-MB-TI-ME-AC-ML-08-002
b)(003)DHQC-CECB-MB-TI-ME-AC-ML-08-003
c)(004)DHQC-CECB-MB-TI-ME-AC-ML-08-004
d)(005)DHQC-CECB-MB-TI-ME-AC-ML-08-005

1. Revised Architectural drawings to be considered as instructed in


the meetings.
2. AHU capacities are not finalized yet. Duct sizes to be adjusted
after finalizing the capacities of AHUs.
3. Drawing to be revised to eliminate the coordination issues
mentioned by you at the progress meeting held on 10.07.2019
4. Incorporate typical equipment/installation details shown in the
following drawings.
a)(002)DHQC-CECB-MB-TI-ME-AC-ML-08-002
b)(003)DHQC-CECB-MB-TI-ME-AC-ML-08-003
c)(004)DHQC-CECB-MB-TI-ME-AC-ML-08-004
d)(005)DHQC-CECB-MB-TI-ME-AC-ML-08-005

1. Revised Architectural drawings to be considered as instructed in


the meetings.
2. AHU capacities are not finalized yet. Duct sizes to be adjusted
after finalizing the capacities of AHUs.
3. Drawing to be revised to eliminate the coordination issues
mentioned by you at the progress meeting held on 10.07.2019
4. Incorporate typical equipment/installation details shown in the
following drawings.
a)(002)DHQC-CECB-MB-TI-ME-AC-ML-08-002
b)(003)DHQC-CECB-MB-TI-ME-AC-ML-08-003
c)(004)DHQC-CECB-MB-TI-ME-AC-ML-08-004
d)(005)DHQC-CECB-MB-TI-ME-AC-ML-08-005
426.5 1499.9 247 6.07 0.01 0.060725
319.9 1125.0 143 7.87 0.42 3.304267
213.2 749.8 78.75 9.52 0.45 4.284467
106.6 374.9 46.21 8.11 0.12 0.973532
8.62
CENTRAL ENGINEERING CONSULTANCY BUREAU
D H Q C - BUILDING PROJECT
MVAC B12 INTERNAL MEMOS LOG Run Date
CECB Responded
Ref No. Description Originator Responded to
Date
CECB/DHQC/STR/GEN/556
3/4/2021 6:32

Remarks (concise response) Ref File


Check the available space (beam etc) before fabricating and
installing the duct.
Acoustic insulations are required refer the ER clause 3.6.12.
Check the panel location, drain location etc.
Installation shall be as per the ER.

Check the available space (beam etc) before fabricating and


installing the duct.
Acoustic insulations are required refer the ER clause 3.6.12.
Check the panel location, drain location etc.
Installation shall be as per the ER.

Check the available space (beam etc) before fabricating and


installing the duct.
Acoustic insulations are required refer the ER clause 3.6.12.
Check the panel location, drain location etc.
Installation shall be as per the ER.

Check the available space (beam etc) before fabricating and


installing the duct.
Acoustic insulations are required refer the ER clause 3.6.12.
Check the panel location, drain location etc.
Installation shall be as per the ER.

Check the available space (beam etc) before fabricating and


installing the duct.
Acoustic insulations are required refer the ER clause 3.6.12.
Check the panel location, drain location etc.
Installation shall be as per the ER.

Check the available space (beam etc) before fabricating and


installing the duct.
Acoustic insulations are required refer the ER clause 3.6.12.
Check the panel location, drain location etc.
Installation shall be as per the ER.

Check the available space (beam etc) before fabricating and


installing the duct.
Acoustic insulations are required refer the ER clause 3.6.12.
Check the panel location, drain location etc.
Installation shall be as per the ER.

Check the available space (beam etc) before fabricating and


installing the duct.
Acoustic insulations are required refer the ER clause 3.6.12.
Check the panel location, drain location etc.
Installation shall be as per the ER.