2021.01.015 - Submission Report No. 06
2021.01.015 - Submission Report No. 06
21
KEN International
5/F Rm.501, Abu Dhabi University Tower, Muroor Road, Abu Dhabi, United Arab Emirates| P.O. Box 32749, T: +9712 4435655
REF: KEN.BAH.PR01-15.01.21
1.0 INTRODUCTION
1.03 KEN to issue revised communication matrix to YOSH KEN 18.01.21 OPEN
2.0 RISKS
2.01 Refer Risk Register to be updated and shared to YOSH on KEN 20.01.21 OPEN
20.01.21
KEN International
5/F Rm.501, Abu Dhabi University Tower, Muroor Road, Abu Dhabi, United Arab Emirates| P.O. Box 32749, T: +9712 4435655
REF: KEN.BAH.PR01-15.01.21
3.02 KEN requested for the approval for the revised YOSH 11.01.21 OPEN
programme. YOSH noted that SD comments to be
addressed first prior the programme can be considered.
3.04 KEN requested for the final list of contractors for as initial YOSH 11.01.21 OPEN
Prequalification.
3.05 ADI from YOSH commented for KEN to provide which KEN 18.01.21 OPEN
deliverable will be expected on the next stage against
each comment on the SD.
3.06 KEN requested YOSH for the ID comments plotted on the YOSH 18.01.21 OPEN
3D renders for clarity of understanding. YOSH
acknowledge and will forward the same.
6.01 KEN noted that M/s Baynunah is set to commence site KEN 18.01.21
mobilization for the boring works with a total planned
duration of 3 weeks for completion. Developments will be
updated progressively to YOSH.
6.02 YOSH noted that consultancy supervision is not required YOSH Note
for the boring works. KEN acknowledged and noted that
they will conduct visits as per utmost availability.
KEN International
5/F Rm.501, Abu Dhabi University Tower, Muroor Road, Abu Dhabi, United Arab Emirates| P.O. Box 32749, T: +9712 4435655
REF: KEN.BAH.PR01-15.01.21
-END-
KEN International
5/F Rm.501, Abu Dhabi University Tower, Muroor Road, Abu Dhabi, United Arab Emirates| P.O. Box 32749, T: +9712 4435655
SCHEMATIC DESIGN REVIEW
Al Bahya Farm Villa, Abu Dhabi
15 January 2021
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
1|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
Guest Rooms:-
- The floor plan is not matching with the one in the Floor plans on Interior Design
Interior Design annex. 07.01.2021 KEN Annex is just for keyplans for
Furniture.
- In the floor plan, the wardrobe refers to have a Wall finish to be corrected
07.01.2021 KEN
wall finish type W04. on wardrobe.
- Key plan is missing from sheet no. A3.GR-1.01. 07.01.2021 KEN Keyplan will be added
GYM:-
- The floor finish of the GYM indicates Porcelain Agreed, all finishes
Stoneware Anti-slip (F.06), shouldn’t we have specifications to be finalized
different type of material that able to cope with on Detailed Design Phase.
Heavy equipment, Intensive use, Vibration and 07.01.2021 KEN We shall issue Finishes review
noise, etc. to confirm the alternative
choices subject to Client
approval.
- The slab that covers the pool its ceiling finish All finishes specifications to
indicates Gypsum Board Moisture Resistance, be finalized on Detailed
shouldn’t we consider Cement Board instead? Design Phase. We shall issue
07.01.2021 KEN
Alternatively, why don’t we apply the paint on Finishes review to confirm
the slab itself? the alternative choices
subject to Client approval.
2|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
- In the floor plans, symbols are not updated and To be corrected and
others are missing i.e. symbols for section lines, 07.01.2021 KEN included on SD resubmission
and annotation tags.
- The size of the pump room seems too big, have Size of pump room is based
this been considered in the estimated cost? on pool area. This shall be
finalized on detailed design
phase with the final
recommended pump sizes.
07.01.2021 KEN
Reduction on room size is
noted. The cost is
considered and will be
incorporated and reflected
in the cost analysis.
Service Building:-
- There is discrepancy between the Architectural Background plans for
drawings and the one in the Interior Design Interior Design Annex to be
annex. updated based on
07.01.2021 KEN
Schematic Design plans. All
details to be developed on
Detailed Design Phase.
Landscape Presentation
- Sunken island with fire pit is a new addition, Yes on schematic design.
07.01.2021 KEN
right? If yes, does it have any cost impact?
- Item q. in Page 4, Water installations, seems like Water Installations area is
a new building, does it have any implications? required for maintenance of
Wadi. All systems to be
07.01.2021 KEN
confirmed and developed
during Detailed Design
Phase by Specialist & MEP.
- Page 15, the key plan is not matching with the Images provided are for
information presented in the same sheet. presentation purposes and
07.01.2021 KEN reference. All details will be
developed based on actual
requirement of project. Any
3|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
4|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
- Are we going to receive any other renderings for Client to confirm the
other key areas? additional renderings, to be
07.01.2021 KEN confirmed. Additional
renderings not included on
SD resubmission.
MEP Comments:-
General:-
- All the MEP design and drawings are based on Noted and these will be
different and old version of Architectural corrected on Detailed
drawings. (Major concern) Design Package. KEN is
currently doing the
07.01.2021 KEN Schematic Design Review,
correcting the Layouts,
finalizing the MEP design as
per current SD plans. We
shall provide DD
5|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
coordination drawings to
resolve all MEP concerns.
- As per the design, sewerage to be collected Current information from
every three days by truck. We are not sure of authority there is no existing
the operational cost impact due to collection of sewerage connection in the
sewerage. (Major concern) location,
It will be confirmed with the
07.01.2021 KEN
Municipality if they extend
their services when we
submit our respective
drawing.
6|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
- What about dehumidifier for swimming pool? Dehumidifier for the pool
area is not considered in the
design as the pool has big
opening therefore regarded
in the design as outdoor
pool. If the consideration is
an indoor then only a
07.01.2021 KEN
dehumidifier is essential and
subsequently would need
the open area to be closed.
One system can be by a
retractable ceiling structure
which can be designed as
per client’s preference.
- Fan coil units are located at living space; will this FCU location in the
cause disturbance to the client at the time of schematic can be
maintenance? rearranged in any way
07.01.2021 KEN
possible to avoid the access
of machine from the client
private spaces- Redesign
- Some duct sizes yet to be shown in drawings. HVAC design criteria – Duct
size should have 3 meter
acoustic liner from the FCU
mouth. Plenum box to have
acoustic liner.
Selection of the grill to make
07.01.2021 KEN
sure NC level 23 when
recorded 1 meter away
from the grill. Room temp:
21Degree selection, Heating
coil to be considered in
FCU . And FCU must be able
7|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
8|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
Missing Drawings/Information:
- Drawing Set General Information 07.01.2021 KEN
- Cover Sheet 07.01.2021 KEN Will add on SD
- Drawing Index and Symbols 07.01.2021 KEN To be added on DD
- General Requirements Notes 07.01.2021 KEN To be added on DD
- Location and Area Map 07.01.2021 KEN Will add on SD
9|Page
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
10 | P a g e
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
11 | P a g e
2021.01.07_Schematic Design Review_KEN response.docx
SCHEMATIC DESIGN REVIEW
Project | Al Bahya Farm Villa
12 | P a g e
2021.01.07_Schematic Design Review_KEN response.docx