0% found this document useful (0 votes)
42 views

DG Integrity Test Notice

TEST DG

Uploaded by

Jegadeshwaran R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
42 views

DG Integrity Test Notice

TEST DG

Uploaded by

Jegadeshwaran R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1
Bywiake at Msi ne le Doha Clinic Hospital pbk ip dient ads nares OPERATION IMPORTANT NOTICE SUBJECT Diesel Generator Load & Integrity Testing DATE f Friday 25 December, 2020 TIME: : 05:30 am —07:00 am ATTENTION : All Staff DEPARTMENT Facility BUILDING B 8 Dear All In align with building maintenance plan, please be advised that on the date and time indicated above, we will perform emergency standby generator onload and integrity testing. During testing, there will be few seconds power supply fluctuation due to power transfer from Kahramaa to DG system and Vice Versa and building alarms may activate, do not panic if there is any otherwise, we will advise immediately what to do. This testing is necessary require to validate the true operational performance and ensures the standby generator can be depend on during emergency power outage. Please plan your work and backup your computer accordingly. For enquiries contract Facility: 6624 5134, Maintenance: 6615 4414 Dr. Moustafa Tawfeek Dr. Mohamed A. Atwé Dr. Moustafa Tawfeek M Medical Director / V.GM pin 44955099

You might also like