The document provides information on calculating the ideal number of trucks for various dump truck fleets and excavator fleets based on haul distances of 600m, 800m, 1000m, 1500m, and 2000m. It includes tables with estimated production capacities and truck counts for different excavator and truck types, as well as factors to consider for swell, time efficiency, and loading.

Uploaded by

Baso Jasriadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
8K views50 pages

Rumus Penentuan BCM

The document provides information on calculating the ideal number of trucks for various dump truck fleets and excavator fleets based on haul distances of 600m, 800m, 1000m, 1500m, and 2000m. It includes tables with estimated production capacities and truck counts for different excavator and truck types, as well as factors to consider for swell, time efficiency, and loading.

Uploaded by

Baso Jasriadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 50

Jumlah truck Ideal / Fleet

600 m 800 m 1000 m 1500 m 2000 m


UNIT TRUCK
rite/jam rite/jam rite/jam rite/jam rite/jam
PC 1250 HD 465 3 4 4 5 7
(500 740/A40 4 5 6 8 10
bcm/jam) A35 5 6 7 9 12
PC 800/EC700 HD 466 2 2 3 4 4
(325 740/A41 3 3 4 5 7
bcm/jam) A36 3 4 5 6 8
PC 400 HD 467 1 2 2 2 3
(225 740/A42 2 2 3 4 5
bcm/jam) A37 2 3 3 4 5
PC 300 HD 468 1 1 1 2 2
(150 740/A43 1 2 2 2 3
bcm/jam) A38 2 2 2 3 4
PC 200 HD 469 1 1 1 1 1
(85 740/A44 1 1 1 1 2
bcm/jam) A39 1 1 1 2 2

Jumlah Bucket / Truck


Kapasitas Bucket HD 465 740 A40 A35
Tipe Unit
LCM BCM 34.2 23.1 23.2 20.7
EX-1900 12 9.0 3 2 2 2 0.75 Sweel Factor
PC 1250 6.7 5.0 5 3 3 3
PC 800 4.5 3.4 8 5 5 5
PC 400 3.2 2.4 11 7 7 6
PC 300 2.1 1.6 16 11 11 10
PC 200 1.2 0.9 29 19 19 17

Target Produksi Alat Loading


Bucket CT
Tipe Unit Bcm/jam Bcm/hari Bcm/bulan
(bcm) (dtk)
EX-1900 12 28 810 16,200 356,400 0.7 Faktor Koreksi Operator
PC 1250 6.7 25 507 10,130 222,869 20 Jumlah Jam Kerja / Hari
PC 800 4.5 25 340 6,804 149,688 22 Jumlah Hari Dalam 1 Bulan Kerja
PC 700 4.5 26 327 6,542 143,931
PC 400 3.2 25 242 4,838 106,445
PC 300 2.1 24 165 3,308 72,765
PC 200 1.2 22 103 2,062 45,360
Truck Count (BCM/rite)
Kapasitas Lumpur Lumpur
UNIT vessel OB (bcm) Padat Cair
Heaped Struck (bcm) (bcm)
HD 465 34 25 22 18 14
ADT 740 / A40 23 18 16 13 10
A35 21 16 14 11 9

Target Retasi Dump Truck (rite/jam)


Kecepatan rata-rata (HD = 20 km/jam; ADT = 18 km/jam
600 m 800 m 1000 m 1500 m 2000 m
UNIT
rite/jam rite/jam rite/jam rite/jam rite/jam
HD 465 8 6 6 4 3
ADT 740 / A40 7 6 5 4 3
A35 7 6 5 4 3

Target Retase Dump Truck (rite/jam)


600 m 800 m 1000 m 1500 m 2000 m
UNIT MATERIAL
bcm/jam bcm/jam bcm/jam bcm/jam bcm/jam
OB 165 141 123 92 75
HD 465 Ice Cream 132 113 99 74 60
Mud Cair 105 90 78 59 48
OB 112 96 80 64 48
740/A40 Ice Cream 90 77 64 51 38
Mud Cair 70 60 50 40 30
OB 98 84 70 56 42
A35 Ice Cream 78 67 56 45 34
Mud Cair 63 54 45 36 27
Tabel
Data Swell Factor Material

Berat, lb per yd kubik


No Jenis Material Persen Swell % Swell Factor
Bongkah Lepas
1 Lempung, kering 2700 2000 35 0.74
2 Lempung, basah 3000 2200 35 0.74
3 Tanah, kering 2800 2240 25 0.80
4 Tanah, basah 3200 2580 25 0.80
5 Tanah dan kerikil 3200 2600 20 0.83
6 Kerikil, kering 2800 2490 12 0.89
7 Kerikil, basah 3400 2980 14 0.88
8 Batukapur 4400 2750 60 0.63
9 Batu, diledakkan dan baik 4200 2640 60 0.65
10 Pasir, kering 2600 2260 15 0.87
11 Pasir, basah 2700 2360 15 0.87
12 Batu serpih 3500 2480 40 0.71
Sumber : Perencanaan Peralatan, RL Puerefouy.

Tabel
Swell Factor

No Material Swell Factor Factor Swell % Swell


1 Top Soil 0.80 1.25 25.00%
2 OB 0.75 1.34 34.05%
Sumber : Perencanaan Peralatan, RL Puerefouy.
Effisiensi Waktu

KONDISI KERJA EFFISIENSI


Baik 0.9
Sedang 0.83
Buruk/Jelek 0.75

Effisiensi Kerja

KEADAAN ALAT
KEADAAN MEDAN
Memuaskan Baik Sedang Buruk
Memuaskan 0.85 0.82 0.76 0.7
Baik 0.78 0.75 0.71 0.65
Sedang 0.72 0.69 0.65 0.6
Buruk 0.63 0.61 0.57 0.52

Effisiensi Operator

KETERAMPILAN OPERATOR EFFISIENSI


Baik 0.9
Normal/Sedang 0.83
Buruk 0.75

Factor Pemuatan

KELOMPOK MATERIAL
EFFISIENSI
(Tanah / Batu Asli (Insitu))
- Material Lembab (Clay, Lempung) 1 1.1

- Butiran Lembab < 24 mm 0.95 1

- Butiran : + ukuran < 3 mm 0.95 1


+ ukuran 3 mm - 12 mm 0.9 0.95
+ ukuran 12 mm - 24 mm 0.85 0.9
+ ukuran > 24 mm 0.75 0.85

- Blasting : + Fragmentasi Baik 0.8 0.85


+ Fragmentasi Sedang 0.75 0.8
+ Fragmentasi Buruk 0.6 0.65
PC 1250 PC 400
Kapasitas Bucket LCM 6.70
Swell Factor % 0.75
Kapasitas Bucket BCM 5.00

Waktu Siklus 21.59


- Waktu Gali Detik 9.79
- Waktu Swing Isi Detik 4.88
- Waktu Numpah Detik 3.12
- Waktu Swing kosong Detik 3.80

Faktor Koreksi % 0.57


- Faktor Pengisian % 0.90
- Eff. Operator % 0.90
- Eff. waktu % 0.90
- Eff. kerja % 0.78

Produktivitas BCM/Jam 473.97

HD 465 Volvo FM
Kapasitas Vessel M3 24.00
Jumlah Pass Pass 3.58
Pembulatan Pass 4.00
Kapasitas Vessel BCM 19.99

Waktu Siklus Detik 492.15


- Waktu Loading Detik 86.35
- Waktu Angkut Detik 163.80
- Waktu Kembali Detik 147.60
- Waktu Dumping Detik 24.97
- Waktu Manuver Dump Detik 27.10
- Waktu Manuver Load Detik 31.33
- Waktu delay TP Detik 11.00

Jarak Meter 1,000.00


Kecepatan Angkut Km/Jam 21.98
Kecepatan Kembali Km/Jam 24.39

Faktor Koreksi % 0.68


- Eff. Operator % 0.90
- Eff. kerja % 0.75

Produktivitas BCM/Jam 98.72


Rit/Jam 7.31
Rit/Jam 7.00
PERALATAN PERALATAN
MF
ALAT MUAT ALAT ANGKUT ALAT MUAT

PC 1250 HD 465 PC 400


0.70
1 4 1

40 Long Ton
38 Ton
2.3 ton/m3 Berat jenis
0.87 Faktor pengembangan (swell factor)
16.52 M3 Loose (Loose Cubic Meter/LCM)
14.37 BCM/RIT

50 Long Ton
45 Ton
1.8 ton/m3 Berat jenis
0.74 Faktor pengembangan (swell factor)
25.00 M3 Loose (Loose Cubic Meter/LCM)
18.50 BCM/RIT
PC 400 ZX 450
Kapasitas Bucket LCM 3.00 Kapasitas Bucket
Swell Factor % 0.75 Swell Factor
Kapasitas Bucket BCM 2.24 Kapasitas Bucket

Waktu Siklus 20.59 Waktu Siklus


- Waktu Gali Detik 8.79 - Waktu Gali
- Waktu Swing Isi Detik 4.88 - Waktu Swing Isi
- Waktu Numpah Detik 3.12 - Waktu Numpah
- Waktu Swing kosong Detik 3.80 - Waktu Swing kosong

Faktor Koreksi % 0.57 Faktor Koreksi


- Faktor Pengisian % 0.90 - Faktor Pengisian
- Eff. Operator % 0.90 - Eff. Operator
- Eff. waktu % 0.90 - Eff. waktu
- Eff. kerja % 0.78 - Eff. kerja

Produktivitas BCM/Jam 222.54 Produktivitas

Volvo FM 9 VOLVO FM X
Kapasitas Vessel M3 16.00 Kapasitas Vessel
Jumlah Pass Pass 5.33 Jumlah Pass
Pembulatan Pass 5.00 Pembulatan
Kapasitas Vessel BCM 11.19 Kapasitas Vessel

Waktu Siklus Detik 508.73 Waktu Siklus


- Waktu Loading Detik 102.93 - Waktu Loading
- Waktu Angkut Detik 163.80 - Waktu Angkut
- Waktu Kembali Detik 147.60 - Waktu Kembali
- Waktu Dumping Detik 24.97 - Waktu Dumping
- Waktu Manuver Dump Detik 27.10 - Waktu Manuver Dump
- Waktu Manuver Load Detik 31.33 - Waktu Manuver Load
- Waktu delay TP Detik 11.00 - Waktu Delay TP

Jarak Meter 800.00 Jarak


Kecepatan Angkut Km/Jam 17.58 Kecepatan Angkut
Kecepatan Kembali Km/Jam 19.51 Kecepatan Kembali

Faktor Koreksi % 0.68 Faktor Koreksi


- Eff. Operator % 0.90 - Eff. Operator
- Eff. kerja % 0.75 - Eff. kerja

Produktivitas BCM/Jam 53.45 Produktivitas


Rit/Jam 7.08
Rit/Jam 7.00
PERALATAN PERALATAN
MF
ALAT ANGKUT ALAT MUAT ALAT ANGKUT

Volvo FM 9 ZX 450 VOLVO FM X


1.01
5 1 3
ZX 450 SK 480
LCM 3.00 Kapasitas Bucket LCM 3.00
% 0.80 Swell Factor % 0.74
BCM 2.40 Kapasitas Bucket BCM 2.22

18.33 Waktu Siklus 19.50


Detik 7.30 - Waktu Gali Detik 8.00
Detik 3.86 - Waktu Swing Isi Detik 4.00
Detik 3.37 - Waktu Numpah Detik 3.50
Detik 3.80 - Waktu Swing kosong Detik 4.00

% 0.53 Faktor Koreksi % 0.58


% 0.95 - Faktor Pengisian % 0.95
% 0.90 - Eff. Operator % 0.90
% 0.83 - Eff. waktu % 0.85
% 0.75 - Eff. kerja % 0.80

BCM/Jam 250.83 Produktivitas BCM/Jam 238.28

OLVO FM X VOLVO FM X
M3 22.00 Kapasitas Vessel M3 22.00
Pass 7.33 Jumlah Pass Pass 7.33
Pass 7.00 Pembulatan Pass 7.00
BCM 16.80 Kapasitas Vessel BCM 15.54

Detik 547.27 Waktu Siklus Detik 158.50


Detik 128.33 - Waktu Loading Detik 136.50
Detik 165.80 - Waktu Angkut Detik 0.00
Detik 152.40 - Waktu Kembali Detik 0.00
Detik 20.93 - Waktu Dumping Detik 0.00
Detik 28.77 - Waktu Manuver Dump Detik 0.00
Detik 29.03 - Waktu Manuver Load Detik 0.00
Detik 22.00 - Waktu Delay TP Detik 22.00

Meter 800.00 Jarak Meter 800.00


Km/Jam 17.37 Kecepatan Angkut Km/Jam #DIV/0!
Km/Jam 18.90 Kecepatan Kembali Km/Jam #DIV/0!

% 0.68 Faktor Koreksi % 0.68


% 0.90 - Eff. Operator % 0.90
% 0.75 - Eff. kerja % 0.75

BCM/Jam 74.60 Produktivitas BCM/Jam 238.25


Rit/Jam 6.58 Rit/Jam 22.71
Rit/Jam 7.00 Rit/Jam 23.00
PERALATAN
MF MF
ALAT MUAT ALAT ANGKUT

SK 480 VOLVO FM X
0.70 2.58
1 3
X
MF

2.58
PC 1250 F. Koreksi Excavator

0.80
Kapasitas Bucket LCM 6.40
0.40
Swell Factor % 0.75 0.00
Kapasitas Bucket BCM 4.77 Faktor - Faktor - Eff. - Eff. -E
Koreksi Pengisian Operator waktu
Waktu Siklus 21.59
- Waktu Gali Detik 9.79
F. Koreksi Dump Truck
- Waktu Swing Isi Detik 4.88
- Waktu Numpah Detik 3.12 1.00
- Waktu Swing kosong Detik 3.80 0.80
0.60
Faktor Koreksi % 0.60 Faktor Koreksi - Eff. Operator - Eff. k
- Faktor Pengisian % 0.90

Jumlah HD
- Eff. Operator % 0.90 Kebutuhan HD Persatuan Jarak

- Eff. waktu % 0.90


6
- Eff. kerja % 0.82
4
2
Produktivitas BCM/Jam 475.97 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 0 60 7 0 8 0 90 10 0 1 1 0 12 0 13 0 1 4 0 15 0 16 0 17 0 1 8 0

HD 465
500 600 700
Kapasitas Vessel M3 32.69 24.00 24.00 24.00
Jumlah Pass Pass 5.11 5.11 5.11 5.11
Pembulatan Pass 5.00 5.00 5.00 5.00
Kapasitas Vessel BCM 23.87 23.87 23.87 23.87

Waktu Siklus Detik 547.73 364.33 396.73 429.13


- Waktu Loading Detik 107.93 107.93 107.93 107.93
- Waktu Angkut Detik 198.00 90.00 108.00 126.00
- Waktu Kembali Detik 158.40 72.00 86.40 100.80
- Waktu Dumping Detik 24.97 24.97 24.97 24.97
- Waktu Manuver Dump Detik 27.10 27.10 27.10 27.10
- Waktu Manuver Load Detik 31.33 31.33 31.33 31.33
- Waktu delay TP Detik 0.00 11.00 11.00 11.00

Jarak Meter 1,100.00 500.0 600.0 700.0


Kecepatan Angkut Km/Jam 20.00 20.00 20.00 20.00
Kecepatan Kembali Km/Jam 25.00 25.00 25.00 25.00

Faktor Koreksi % 0.77 0.77 0.77 0.77


- Eff. Operator % 0.90 0.90 0.90 0.90
- Eff. kerja % 0.85 0.85 0.85 0.85
3.97 2.64 2.87 3.11
MF
4.00 3.00 3.00 3.00
Produktivitas BCM/Jam 120.03 180.45 165.71 153.20
Rit/Jam 6.57 9.88 9.07 8.39
Rit/Jam 7.00 10.00 9.00 8.00
PERALATAN
MF
ALAT MUAT ALAT ANGKUT
3 3 3
PC 1250 HD 465
0.79
1 4.00
Koreksi Excavator
Productivity HD Per Satuan Jarak
200.00

Produktivitas
tor - Eff. - Eff. - Eff. kerja 180.00
isian Operator waktu
160.00

oreksi Dump Truck 140.00

120.00

100.00

- Eff. Operator - Eff. kerja 80.00

butuhan HD Persatuan Jarak


60.00

40.00

20.00

0.00
0 0 0 0 0 0 0 0 0 0 0 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 20
0 0 1 1 0 12 0 13 0 1 4 0 15 0 16 0 17 0 1 8 0 19 0 20 0 Jarak

800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00
5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11 5.11
5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
23.87 23.87 23.87 23.87 23.87 23.87 23.87 23.87 23.87 23.87 23.87

461.53 493.93 526.33 558.73 591.13 623.53 655.93 688.33 720.73 753.13 785.53
107.93 107.93 107.93 107.93 107.93 107.93 107.93 107.93 107.93 107.93 107.93
144.00 162.00 180.00 198.00 216.00 234.00 252.00 270.00 288.00 306.00 324.00
115.20 129.60 144.00 158.40 172.80 187.20 201.60 216.00 230.40 244.80 259.20
24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97
27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10
31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33
11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

800.0 900.0 1,000.0 1,100.0 1,200.0 1,300.0 1,400.0 1,500.0 1,600.0 1,700.0 1,800.0
20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00

0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77
0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85 0.85
3.34 3.58 3.81 4.05 4.28 4.51 4.75 4.98 5.22 5.45 5.69
3.00 4.00 4.00 4.00 4.00 5.00 5.00 5.00 5.00 5.00 6.00
142.45 133.10 124.91 117.67 111.22 105.44 100.23 95.51 91.22 87.29 83.69
7.80 7.29 6.84 6.44 6.09 5.77 5.49 5.23 4.99 4.78 4.58
8.00 7.00 7.00 6.00 6.00 6.00 5.00 5.00 5.00 5.00 5.00
3 4 4 4 4 5 5 5 5 5 6
arak

00 1600 1700 1800 1900 2000

1900 2000
24.00 24.00
5.11 5.11
5.00 5.00
23.87 23.87

817.93 850.33
107.93 107.93
342.00 360.00
273.60 288.00
24.97 24.97
27.10 27.10
31.33 31.33
11.00 11.00

1,900.0 2,000.0
20.00 20.00
25.00 25.00

0.77 0.77
0.90 0.90
0.85 0.85
5.92 6.16
6.00 6.00
80.38 77.31
4.40 4.23
4.00 4.00
6 6
PC 400 F. Koreksi Excavator

0.80
Kapasitas Bucket LCM 3.20
0.40
Swell Factor % 0.75 0.00
Kapasitas Bucket BCM 2.39 Faktor - Faktor - Eff. - Eff. -E
Koreksi Pengisian Operator waktu
Waktu Siklus 21.59
- Waktu Gali Detik 9.79
F. Koreksi Dump Truck
- Waktu Swing Isi Detik 4.88
- Waktu Numpah Detik 3.12 1.00
- Waktu Swing kosong Detik 3.80 0.50
0.00
Faktor Koreksi % 0.57 Faktor Koreksi - Eff. Operator - Eff. k
- Faktor Pengisian % 0.90

Jumlah DT
- Eff. Operator % 0.90 Kebutuhan HD Persatuan Jarak

- Eff. waktu % 0.90 6


5
- Eff. kerja % 0.78 4
3
2
Produktivitas BCM/Jam 226.37 1
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 0 60 7 0 8 0 90 10 0 1 1 0 12 0 13 0 1 4 0 15 0 16 0 17 0 1 8 0

A 740
500 600 700
Kapasitas Vessel M3 22.00 22.00 22.00 22.00
Jumlah Pass Pass 6.88 6.88 6.88 6.88
Pembulatan Pass 7.00 7.00 7.00 7.00
Kapasitas Vessel BCM 16.71 16.71 16.71 16.71

Waktu Siklus Detik 731.51 407.51 439.91 472.31


- Waktu Loading Detik 151.11 151.11 151.11 151.11
- Waktu Angkut Detik 270.00 90.00 108.00 126.00
- Waktu Kembali Detik 216.00 72.00 86.40 100.80
- Waktu Dumping Detik 24.97 24.97 24.97 24.97
- Waktu Manuver Dump Detik 27.10 27.10 27.10 27.10
- Waktu Manuver Load Detik 31.33 31.33 31.33 31.33
- Waktu delay TP Detik 11.00 11.00 11.00 11.00

Jarak Meter 1,500.00 500.0 600.0 700.0


Kecepatan Angkut Km/Jam 20.00 20.00 20.00 20.00
Kecepatan Kembali Km/Jam 25.00 25.00 25.00 25.00

Faktor Koreksi % 0.68 0.68 0.68 0.68


- Eff. Operator % 0.90 0.90 0.90 0.90
- Eff. kerja % 0.75 0.75 0.75 0.75
4.08 2.27 2.45 2.63
MF
4.00 2.00 2.00 3.00
Produktivitas BCM/Jam 55.51 99.65 92.31 85.97
Rit/Jam 4.92 8.83 8.18 7.62
Rit/Jam 5.00 9.00 8.00 8.00
PERALATAN
MF
ALAT MUAT ALAT ANGKUT
2 2 3
PC 400 A 740
0.83
1 4.00
Koreksi Excavator
Produktivitas DT Per Satuan Jarak
120.00

Produktivitas
tor - Eff. - Eff. - Eff. kerja
isian Operator waktu 100.00

oreksi Dump Truck 80.00

60.00
- Eff. Operator - Eff. kerja
40.00
butuhan HD Persatuan Jarak

20.00

0.00
0 0 0 0 0 0 0 0 0 0 0 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 20
0 0 1 1 0 12 0 13 0 1 4 0 15 0 16 0 17 0 1 8 0 19 0 20 0 Jarak

800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88
7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
16.71 16.71 16.71 16.71 16.71 16.71 16.71 16.71 16.71 16.71 16.71

504.71 537.11 569.51 601.91 634.31 666.71 699.11 731.51 763.91 796.31 828.71
151.11 151.11 151.11 151.11 151.11 151.11 151.11 151.11 151.11 151.11 151.11
144.00 162.00 180.00 198.00 216.00 234.00 252.00 270.00 288.00 306.00 324.00
115.20 129.60 144.00 158.40 172.80 187.20 201.60 216.00 230.40 244.80 259.20
24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97
27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10
31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33
11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

800.0 900.0 1,000.0 1,100.0 1,200.0 1,300.0 1,400.0 1,500.0 1,600.0 1,700.0 1,800.0
20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00

0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
2.81 2.99 3.17 3.36 3.54 3.72 3.90 4.08 4.26 4.44 4.62
3.00 3.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 5.00
80.46 75.60 71.30 67.46 64.02 60.91 58.08 55.51 53.16 50.99 49.00
7.13 6.70 6.32 5.98 5.68 5.40 5.15 4.92 4.71 4.52 4.34
7.00 7.00 6.00 6.00 6.00 5.00 5.00 5.00 5.00 5.00 4.00
3 3 3 3 4 4 4 4 4 4 5
Jarak

00 1600 1700 1800 1900 2000

1900 2000
22.00 22.00
6.88 6.88
7.00 7.00
16.71 16.71

861.11 893.51
151.11 151.11
342.00 360.00
273.60 288.00
24.97 24.97
27.10 27.10
31.33 31.33
11.00 11.00

1,900.0 2,000.0
20.00 20.00
25.00 25.00

0.68 0.68
0.90 0.90
0.75 0.75
4.80 4.98
5.00 5.00
47.16 45.45
4.18 4.03
4.00 4.00
5 5
Doosan 500 lcv F. Koreksi Excavator

0.80
Kapasitas Bucket LCM 3.60
0.40
Swell Factor % 0.75 0.00
Kapasitas Bucket BCM 2.69 Faktor - Faktor - Eff. - Eff. -E
Koreksi Pengisian Operator waktu
Waktu Siklus 18.85
- Waktu Gali Detik 8.75
F. Koreksi Dump Truck
- Waktu Swing Isi Detik 3.75
- Waktu Numpah Detik 2.81 1.00
- Waktu Swing kosong Detik 3.54 0.50
0.00
Faktor Koreksi % 0.57 Faktor Koreksi - Eff. Operator - Eff. k
- Faktor Pengisian % 0.90

Jumlah DT
- Eff. Operator % 0.90 Kebutuhan HD Persatuan Jarak

- Eff. waktu % 0.90


12
- Eff. kerja % 0.78
8
4
Produktivitas BCM/Jam 291.62 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 0 60 7 0 8 0 90 10 0 1 1 0 12 0 13 0 1 4 0 15 0 16 0 17 0 1 8 0

volvo fm 9
500 600 700
Kapasitas Vessel M3 12.50 12.50 12.50 12.50
Jumlah Pass Pass 3.47 3.47 3.47 3.47
Pembulatan Pass 3.00 3.00 3.00 3.00
Kapasitas Vessel BCM 8.06 8.06 8.06 8.06

Waktu Siklus Detik 348.72 312.95 345.35 377.75


- Waktu Loading Detik 56.55 56.55 56.55 56.55
- Waktu Angkut Detik 115.20 90.00 108.00 126.00
- Waktu Kembali Detik 96.00 72.00 86.40 100.80
- Waktu Dumping Detik 24.97 24.97 24.97 24.97
- Waktu Manuver Dump Detik 20.00 27.10 27.10 27.10
- Waktu Manuver Load Detik 25.00 31.33 31.33 31.33
- Waktu delay TP Detik 11.00 11.00 11.00 11.00

Jarak Meter 800.00 500.0 600.0 700.0


Kecepatan Angkut Km/Jam 25.00 20.00 20.00 20.00
Kecepatan Kembali Km/Jam 30.00 25.00 25.00 25.00

Faktor Koreksi % 0.68 0.68 0.68 0.68


- Eff. Operator % 0.90 0.90 0.90 0.90
- Eff. kerja % 0.75 0.75 0.75 0.75
5.19 4.66 5.14 5.63
MF
5.00 5.00 5.00 6.00
Produktivitas BCM/Jam 56.14 62.56 56.69 51.83
Rit/Jam 10.32 11.50 10.42 9.53
Rit/Jam 10.00 12.00 10.00 10.00
PERALATAN
MF
ALAT MUAT ALAT ANGKUT
5 5 6
Doosan 500 lcv volvo fm 9
0.81
1 5.00
Koreksi Excavator
Poduktivity DT Persatuan Jarak
70.00

Produktivitas
tor - Eff. - Eff. - Eff. kerja
isian Operator waktu 60.00

50.00
oreksi Dump Truck

40.00

30.00
- Eff. Operator - Eff. kerja

butuhan HD Persatuan Jarak 20.00

10.00

0.00
0 0 0 0 0 0 0 0 0 0 0 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2
0 0 1 1 0 12 0 13 0 1 4 0 15 0 16 0 17 0 1 8 0 19 0 20 0 Jarak

800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50 12.50
3.47 3.47 3.47 3.47 3.47 3.47 3.47 3.47 3.47 3.47 3.47
3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00
8.06 8.06 8.06 8.06 8.06 8.06 8.06 8.06 8.06 8.06 8.06

410.15 442.55 474.95 507.35 539.75 572.15 604.55 636.95 669.35 701.75 734.15
56.55 56.55 56.55 56.55 56.55 56.55 56.55 56.55 56.55 56.55 56.55
144.00 162.00 180.00 198.00 216.00 234.00 252.00 270.00 288.00 306.00 324.00
115.20 129.60 144.00 158.40 172.80 187.20 201.60 216.00 230.40 244.80 259.20
24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97
27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10
31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33
11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

800.0 900.0 1,000.0 1,100.0 1,200.0 1,300.0 1,400.0 1,500.0 1,600.0 1,700.0 1,800.0
20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00

0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
6.11 6.59 7.07 7.56 8.04 8.52 9.01 9.49 9.97 10.45 10.94
6.00 7.00 7.00 8.00 8.00 9.00 9.00 9.00 10.00 10.00 11.00
47.73 44.24 41.22 38.59 36.27 34.22 32.38 30.74 29.25 27.90 26.67
8.78 8.13 7.58 7.10 6.67 6.29 5.95 5.65 5.38 5.13 4.90
9.00 8.00 8.00 7.00 7.00 6.00 6.00 6.00 5.00 5.00 5.00
6 7 7 8 8 9 9 9 10 10 11
arak

00 1600 1700 1800 1900 2000

1900 2000
12.50 12.50
3.47 3.47
3.00 3.00
8.06 8.06

766.55 798.95
56.55 56.55
342.00 360.00
273.60 288.00
24.97 24.97
27.10 27.10
31.33 31.33
11.00 11.00

1,900.0 2,000.0
20.00 20.00
25.00 25.00

0.68 0.68
0.90 0.90
0.75 0.75
11.42 11.90
11.00 12.00
25.54 24.50
4.70 4.51
5.00 5.00
11 12
sk 480 F. Koreksi Excavator

0.80
Kapasitas Bucket LCM 3.20
0.40
Swell Factor % 0.75 0.00
Kapasitas Bucket BCM 2.39 Faktor - Faktor - Eff. - Eff. -E
Koreksi Pengisian Operator waktu
Waktu Siklus 21.59
- Waktu Gali Detik 9.79
F. Koreksi Dump Truck
- Waktu Swing Isi Detik 4.88
- Waktu Numpah Detik 3.12 1.00
- Waktu Swing kosong Detik 3.80 0.50
0.00
Faktor Koreksi % 0.57 Faktor Koreksi - Eff. Operator - Eff. k
- Faktor Pengisian % 0.90

Jumlah DT
- Eff. Operator % 0.90 Kebutuhan HD Persatuan Jarak

- Eff. waktu % 0.90 6


5
- Eff. kerja % 0.78 4
3
2
Produktivitas BCM/Jam 226.37 1
0

0 0 0 0 0 0 0 0 0 0 0 0 0 0
5 0 60 7 0 8 0 90 10 0 1 1 0 12 0 13 0 1 4 0 15 0 16 0 17 0 1 8 0

volvo fm 9
500 600 700
Kapasitas Vessel M3 22.00 22.00 22.00 22.00
Jumlah Pass Pass 6.88 6.88 6.88 6.88
Pembulatan Pass 7.00 7.00 7.00 7.00
Kapasitas Vessel BCM 16.71 16.71 16.71 16.71

Waktu Siklus Detik 731.51 407.51 439.91 472.31


- Waktu Loading Detik 151.11 151.11 151.11 151.11
- Waktu Angkut Detik 270.00 90.00 108.00 126.00
- Waktu Kembali Detik 216.00 72.00 86.40 100.80
- Waktu Dumping Detik 24.97 24.97 24.97 24.97
- Waktu Manuver Dump Detik 27.10 27.10 27.10 27.10
- Waktu Manuver Load Detik 31.33 31.33 31.33 31.33
- Waktu delay TP Detik 11.00 11.00 11.00 11.00

Jarak Meter 1,500.00 500.0 600.0 700.0


Kecepatan Angkut Km/Jam 20.00 20.00 20.00 20.00
Kecepatan Kembali Km/Jam 25.00 25.00 25.00 25.00

Faktor Koreksi % 0.68 0.68 0.68 0.68


- Eff. Operator % 0.90 0.90 0.90 0.90
- Eff. kerja % 0.75 0.75 0.75 0.75
4.08 2.27 2.45 2.63
MF
4.00 2.00 2.00 3.00
Produktivitas BCM/Jam 55.51 99.65 92.31 85.97
Rit/Jam 4.92 8.83 8.18 7.62
Rit/Jam 5.00 9.00 8.00 8.00
PERALATAN
MF
ALAT MUAT ALAT ANGKUT
2 2 3
sk 480 volvo fm 9
0.83
1 4.00
Koreksi Excavator
Produktivitas DT Per Satuan Jarak
120.00

Produktivitas
tor - Eff. - Eff. - Eff. kerja
isian Operator waktu 100.00

oreksi Dump Truck 80.00

60.00

- Eff. Operator - Eff. kerja


40.00
butuhan HD Persatuan Jarak

20.00

0.00
0 0 0 0 0 0 0 0 0 0 0 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 20
0 0 1 1 0 12 0 13 0 1 4 0 15 0 16 0 17 0 1 8 0 19 0 20 0 Jarak

800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800
22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00 22.00
6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88 6.88
7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00
16.71 16.71 16.71 16.71 16.71 16.71 16.71 16.71 16.71 16.71 16.71

504.71 537.11 569.51 601.91 634.31 666.71 699.11 731.51 763.91 796.31 828.71
151.11 151.11 151.11 151.11 151.11 151.11 151.11 151.11 151.11 151.11 151.11
144.00 162.00 180.00 198.00 216.00 234.00 252.00 270.00 288.00 306.00 324.00
115.20 129.60 144.00 158.40 172.80 187.20 201.60 216.00 230.40 244.80 259.20
24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97 24.97
27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10 27.10
31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33 31.33
11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00 11.00

800.0 900.0 1,000.0 1,100.0 1,200.0 1,300.0 1,400.0 1,500.0 1,600.0 1,700.0 1,800.0
20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00 20.00
25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00 25.00

0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68 0.68
0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75
2.81 2.99 3.17 3.36 3.54 3.72 3.90 4.08 4.26 4.44 4.62
3.00 3.00 3.00 3.00 4.00 4.00 4.00 4.00 4.00 4.00 5.00
80.46 75.60 71.30 67.46 64.02 60.91 58.08 55.51 53.16 50.99 49.00
7.13 6.70 6.32 5.98 5.68 5.40 5.15 4.92 4.71 4.52 4.34
7.00 7.00 6.00 6.00 6.00 5.00 5.00 5.00 5.00 5.00 4.00
3 3 3 3 4 4 4 4 4 4 5
Jarak

00 1600 1700 1800 1900 2000

1900 2000
22.00 22.00
6.88 6.88
7.00 7.00
16.71 16.71

861.11 893.51
151.11 151.11
342.00 360.00
273.60 288.00
24.97 24.97
27.10 27.10
31.33 31.33
11.00 11.00

1,900.0 2,000.0
20.00 20.00
25.00 25.00

0.68 0.68
0.90 0.90
0.75 0.75
4.80 4.98
5.00 5.00
47.16 45.45
4.18 4.03
4.00 4.00
5 5
RIPPING

D 375 - A
Waktu Siklus Menit 1.03
- Waktu Ripping menit 0.64
- Waktu Mundur menit 0.29
- Waktu ganti transmisi Menit 0.10

Jarak Meter 29.00


Penetrasi Meter 0.90
Spaci Meter 1.00

Faktor Koreksi % 0.56


- Eff. kerja % 0.83 ( jarak x
- Machine Avaibility % 0.81
Pr odt ' y Ripping =
- Operator Skill % 0.83

Waktu siklus Menit 1.03


Produktivitas BCM/Jam 847.02

D 375 - A
Waktu Siklus Menit 1.03
- Waktu Dozing menit 0.64
- Waktu Mundur menit 0.29
- Waktu ganti transmisi Menit 0.10

Capacty Meter 18.50

Faktor Koreksi % 0.56


- Eff. kerja % 0.83
- Machine Avaibility % 0.81
- Operator Skill % 0.83

Waktu siklus Menit 1.03


Produktivitas BCM/Jam 600.38

D 375 - A TD x TR
TP =
TD 847.02 BCM/Jam TD + TR
TP 351.34
TR 600.38 BCM/Jam
NG

CORRECTION FACTOR :

JOB EFFICIENCY : 0.56


MACHINE AVAILABILITY FACTOR : 0.81
TIME EFFICIENCY FACTOR : 0.83
OPERATOR SKILL FACTOR : 0.83

FORWARD SPEED FACTOR : 0.80


REVERSE SPEED FACTOR : 0.85
BLADE CAPACITY : 18.50 m3

( jarak x penetrasi x Spacing ) x 60 x fk


Pr odt ' y Ripping =
CT

q
Pr odt ' y Dozing= x FK
CT

Keterangan :
q = Kapasitas blade (m3)
CT = Cycle Time Dozing
FK = Faktor Koreksi

TD x TR
TP =
TD + TR
TP = Taksiran Produksi
TD = Taksiran produksi dozing
TR = Taksiran produksi ripping
PRODUCTIVITY OF MOTOR GRADER GD705A-4

MACHINE MODEL : GD705A-4


ATTACHMENT : STANDARD BLADE
WORKING TYPE : ROAD MAINTENANCE

LEVELING & GRADING KP = V x (Le - Lo) x 1000 x E

DESCRIPTION SYMBOL UNIT VALUE

KAPASITAS KP m2/hr 12,422.6

WORKING SPEED V km/hr 6.00

PANJANG BLADE L m 4.30

PANJANG EFFECTIVE BLADE (450 ) Le m 3.04

LEBAR OVERLAP Lo m 0.20

JOB EFFICIENCY E - 0.73

JOB EFFICIENCY : 0.73


MACHINE AVAILABILITY FACTOR : 0.90
TIME EFFICIENCY FACTOR : 0.90
OPERATOR SKILL FACTOR : 0.90

Availability
Machine Availability 0.9
Time efficiency 0.9
Operator Skill factor 0.9

C A T E R P IL L A R

778 778

P a rit
C A T E R P IL L A R

778 778

P a rit

1 /2 W t W t 1 /2 W t W t 1 /2 W t

L m in
PRODUCTIVITY ESTIMATION OF MOTOR GRADER GD705A-4

MACHINE MODEL : GD705A-4


ATTACHMENT : STANDARD BLADE
WORKING TYPE : ROAD MAINTENANCE

LEVELING & GRADING KP = V x Ew x 1000 x E


n

DESCRIPTION SYMBOL UNIT VALUE

ESTIMATION PRODUCTION KP m2/hr 4,374.0

WORKING SPEED V km/hr 6.00

BLADE LENGTH L m 4.30

EFFECTIVE BLADE LENGTH (45 deg) Le m 3.04

WIDTH OF OVERLAP Lo m 0.20

EFFECTIVE WIDTH ROAD W m 10.00

PASSES n - 2.00

NUMBER OF TRIP N - 5.00

EFFECTIVE WIDTH PER TRIP Ew m 2.00

JOB EFFICIENCY E - 0.73

JOB EFFICIENCY : 0.73


MACHINE AVAILABILITY FACTOR : 0.90
TIME EFFICIENCY FACTOR : 0.90
OPERATOR SKILL FACTOR : 0.90
OPERATOR SKILL FACTOR : 0.00

778
Tanggul
778
Tanggul

1 /2 W t
CYCLE TIME ALAT MUAT

Material : Top Soil Operator :


Kondisi Front : Baik Cuaca :
Lokasi : Jmlh TP : 3 (VA 05,06,07)
Waktu : 09.00 - 11.00 Sudut Swing : 450 - 600
Unit : Elevasi : ± 40 dpl

No t Digging t Swing Isi t dump t Swing Kosong t Total


1 6.1 4.4 3.3 4 18.8
2 6.2 3.3 3.7 2.8 17
3 5.5 4.2 3.2 3.3 17.2
4 6.9 3.9 2.4 3.5 17.7
5 6.6 3.2 2.6 4.1 17.5
6 5.3 3.9 3 4.7 17.9
7 5.8 3.8 3.2 3.1 16.9
8 7.7 4.1 2.7 3.8 19.3
9 5.8 3.6 3.1 3.2 16.7
10 6.1 3.2 2.6 5.2 18.1
11 5.1 4 3.5 3.9 17.5
12 6.6 4.9 3.4 4.4 20.3
13 7 4.1 3.7 4 19.8
14 6.8 3.7 3.3 3.7 18.5
15 5.9 3.5 3.1 3.4 16.9
16 6.6 3.4 3.5 3.4 17.9
17 6.8 4.3 3.7 4.1 19.9
18 6.4 3.8 4 4.5 19.7
19 5.6 3.6 3.2 3.6 17
20 7 3.6 3.2 3.5 18.3
21 7.5 3.9 3.6 3.7 19.7
22 5.9 4 2.7 3.8 17.4
23 6.6 3.9 5.2 3.6 20.3
24 6.9 4.1 3.7 4 19.7
25 6.6 3.5 3.3 4 18.4
26 5.3 4.2 3.2 4 17.7
27 5.8 4.2 3.2 3.7 17.9
28 6.5 3.9 3.6 3.5 18.5
29 6.4 3.7 5.1 3.5 19.7
30 5.6 4 3.2 4 17.8
Tot 188.90 115.9 101.20 114.00 550.00
Avg 7.30 3.86 3.37 3.80 18.33
CYCLE TIME ALAT MUAT

Material : Clay Operator :


Kondisi Front : Baik Cuaca : Cerah
Lokasi : Jmlh TP : 3 (TR007,010,012)
Waktu : 09.00 - 11.00 Sudut Swing : 450 - 600
Unit : Elevasi : ± 40 dpl

No t Digging t Swing Isi t dump t Swing Kosong t Total


1 6.1 4.4 3.3 4 18.8
2 8.3 4.8 2.8 3.6 20.5
3 7.4 5.3 2.9 4.3 20.9
4 9.2 5.5 2.5 3.6 21.8
5 7.8 4.9 2.4 4 20.1
6 6.9 5.4 2.5 3 18.8
7 6.1 5.4 2.8 4 19.3
8 8.3 4.8 2.5 3.5 20.1
9 6.9 5.7 2.6 4.3 20.5
10 8.3 4.9 2.5 3.9 20.6
11 9.8 5.3 2.2 3.7 22
12 6.8 4.9 3.2 4.1 20
13 7 4.1 3.7 4 19.8
14 9 4.4 3.8 3.1 21.3
15 8.6 5.1 2.7 4.9 22.3
16 9.5 5.6 3.2 3.1 22.4
17 8.7 5 3.6 4.1 22.4
18 9 4.1 3.8 3.3 21.2
19 6.2 5.4 4.2 4.5 21.3
20 7.3 5.5 5 4.2 23
21 6.8 3.9 3.6 3.7 19
22 8.3 4.8 2.8 3.6 20.5
23 6.6 3.9 5.2 3.6 20.3
24 6.9 4.1 3.7 4 19.7
25 7.8 4.9 2.4 4 20.1
26 6.9 5.4 2.5 3 18.8
27 8.3 4.9 2.5 3.9 20.6
28 9.8 5.3 2.2 3.7 22
29 6.8 3.9 3.6 3.7 19
30 8.3 4.8 2.8 3.6 20.5
Tot 233.70 146.4 93.50 114.00 617.60
Avg 8.79 4.88 3.12 3.80 20.59
CYCLE TIME ALAT MUAT

Material : Top Soil Operator :


Kondisi Front : Baik Cuaca :
Lokasi : Jmlh TP : 3 (TR002,05,07)
Waktu : 09.00 - 11.00 Sudut Swing : 450 - 600
Unit : Elevasi : ± 40 dpl

No t Digging t Swing Isi t dump t Swing Kosong t Total


1 6.1 4.4 3.3 4 19.8
2 8.3 4.8 2.8 3.6 21.5
3 7.4 5.3 2.9 4.3 21.9
4 9.2 5.5 2.5 3.6 22.8
5 7.8 4.9 2.4 4 21.1
6 6.9 5.4 2.5 3 19.8
7 6.1 5.4 2.8 4 20.3
8 8.3 4.8 2.5 3.5 21.1
9 6.9 5.7 2.6 4.3 21.5
10 8.3 4.9 2.5 3.9 21.6
11 9.8 5.3 2.2 3.7 23
12 6.8 4.9 3.2 4.1 21
13 7 4.1 3.7 4 20.8
14 9 4.4 3.8 3.1 22.3
15 8.6 5.1 2.7 4.9 23.3
16 9.5 5.6 3.2 3.1 23.4
17 8.7 5 3.6 4.1 23.4
18 9 4.1 3.8 3.3 22.2
19 6.2 5.4 4.2 4.5 22.3
20 7.3 5.5 5 4.2 24
21 6.8 3.9 3.6 3.7 20
22 8.3 4.8 2.8 3.6 21.5
23 6.6 3.9 5.2 3.6 21.3
24 6.9 4.1 3.7 4 20.7
25 7.8 4.9 2.4 4 21.1
26 6.9 5.4 2.5 3 19.8
27 8.3 4.9 2.5 3.9 21.6
28 9.8 5.3 2.2 3.7 23
29 6.8 3.9 3.6 3.7 20
30 8.3 4.8 2.8 3.6 21.5
Tot 233.70 146.4 93.50 114.00 647.60
Avg 9.79 4.88 3.12 3.80 21.59
CYCLE TIME ALAT MUAT

Material : Clay Operator :


Kondisi Front : Baik Cuaca : Cerah
Lokasi loading : Distance : 800 - 900 meter
Waktu : 09.00 - 11.00 Lokasi Disposal : Disposal pit 3
Unit : Elevasi : ± 40 dpl

No t Load t Houling isi t Manuver t Dump t Haulling Ksng t Manuver


1 143 159 18 20 186 30
2 130 160 20 25 197 28
3 141 161 30 25 189 28
4 148 142 25 21 194 33
5 143 187 11 17 198 30
6 125 179 42 24 233 35
7 153 137 12 25 180 38
8 160 145 29 28 183 34
9 140 180 28 18 228 32
10 140 180 33 29 224 31
11 140 185 45 25 219 32
12 135 170 38 30 171 31
13 150 185 40 30 170 29
14 135 179 20 25 182 35
15 144 180 30 28 197 32
16 143 160 23 18 221 32
17 148 142 24 21 188 30
18 146 185 35 30 195 28
19 137 178 32 32 197 30
20 130 160 20 25 197 32
21 143 187 13 17 189 33
22 153 160 16 21 186 31
23 141 162 32 27 191 29
24 152 140 15 28 188 35
25 136 189 27 30 199 32
26 150 179 29 31 201 30
27 144 187 31 30 199 28
28 149 184 28 30 203 33
29 133 187 34 21 213 30
30 151 195 33 18 210 29
Tot 4283.00 5124 813.00 749.00 5928.00 940.00
Avg 112.77 163.80 27.10 24.97 147.60 31.33
t Total
556
560
574
563
586
638
545
579
626
637
646
575
604
576
611
597
553
619
606
564
582
567
582
558
613
620
619
627
618
636
17837.00
594.57
CYCLE TIME ALAT MUAT

Material : Top Soil Operator :


Kondisi Front : Baik Cuaca : Cerah
Lokasi loading : Distance : 900 - 1000 meter
Waktu : 09.00 - 11.00 Lokasi Disposal : Disposal pit 3
Unit : Elevasi : ± 40 dpl

No t Load t Houling isi t Manuver t Dump t Haulling Ksng t Manuver


1 126 160 30 25 188 30
2 130 142 37 17 195 28
3 122 185 37 21 197 28
4 112 178 37 27 197 33
5 140 160 39 17 189 30
6 110 187 37 24 186 35
7 109 160 39 25 191 38
8 126 162 39 28 188 34
9 115 140 36 18 199 32
10 110 189 30 29 201 31
11 112 179 33 25 199 32
12 117 187 34 30 203 31
13 122 184 35 30 213 29
14 126 187 38 25 210 35
15 122 195 39 28 186 32
16 117 159 32 18 197 32
17 110 160 30 21 189 30
18 111 161 32 30 194 28
19 126 142 38 32 198 30
20 115 187 37 25 233 32
21 112 179 37 17 180 33
22 126 137 32 21 183 31
23 119 145 35 27 228 29
24 112 180 36 28 224 35
25 117 180 30 30 219 32
26 110 185 32 31 171 30
27 108 170 35 30 170 28
28 109 185 32 30 182 33
29 115 179 31 21 197 30
30 127 180 34 18 215 29
Tot 3533.00 5124 1043.00 748.00 5922.00 940.00
Avg 115.77 165.80 28.77 20.93 152.40 29.03
t Total
559
549
590
584
575
579
562
577
540
590
580
602
613
621
602
555
540
556
566
629
558
530
583
615
608
559
541
571
573
603
17310.00
577.00

You might also like