MUHAMMAD FARHAN FAROOQ
PERSONAL DETAILS
Email: [email protected]
Cell : +92-3442001072
Whatsapp: +92-3442001072
OBJECTIVE
Working experience of 16+ years as RF Consultant with 5G-
NR/LTE/UMTS/GSM 900/1800
5G/4G/3G Vendor knowledge of Huawei /Ericsson/ZTE
Responsible for Optimization/Planning of R.F Network for optimum
performance.
PROFESSIONAL EXPERIENCE:
Pre 5G-NR (Concept & Knowledge of 5G-NR System )
NR Use Cases, eMBB, mMTC, uRLLC
Numerology concept wrt Time-domain/Frequency-domain and Space-domain
resources. BWP newly introduced concept
SCS (Subcarrier Spacing) wrt service types, frequency bands & moving speed
5G-NR Frame structure
5G NR Spectrum – Sub-6 GHz and mmWave Bandwidth
Channel Management
Massive MIMO concept, Beamforming concept
5G Uplink & DL Power Control
Reliability (Flow Control/Cell Outage Detection & Base Station Always Online)
5G Scehduling, DL Scheduling/ UL Scheduling
Mobility Management, NSA SgNB
5G Intraband CA
Business to Home (B2H) concept and its configuration
5G KPIs understanding
o Service Integrity:
User UL/DL Throughput
Cell UL/DL Avg Throughput
o Utilization KPIs
UL/DL Resource Block Utilizing Rate
Average CPU Load
o Availability KPIs:
Radio Network Unavailability
o Traffic KPIs:
UL/DL Traffic Volume
Average/Max User Number
NSA Architecture/NSA Evaluation
o SgNodeB Addition Procedure
o SgNodeB Release Procedure
o SgNodeB Modification Procedure
Basic Concept of 5G Link Budget with introduction of Foliage Loss/Body Block Loss
& Rain Attenuation Margin
5G Planning Parameter wrt diff combination of AAUs and RRUs for highly
populated Urban Areas/ Sub Urban Areas and Rural Areas
Scanario-based MM Beam Configuration, Azimuth Planning/Tilt Planning
PCI Planning Concept
PRAH, Root Sequence Planning Concept
[email protected]
Phone: 00-92-3442001072
LTE Team Lead (CMPAK Pakistan Project) (May 2017 – June 2019)
Managing team of 08 RF Engineers and 10 DT Engineers
Responsible for weekly meeting with customer and discuss issues related to the
Network
Execution of multiple Trials in order to improve various KPIs like UL Throughput/DL
Throughput/HHOSR/CDR/CSSR etc
Working on FDD network with 10M /15M/20 & Compact Band 18.6 MHz
Trial for the execution of VOLTE & SRVCC trial in CMPAK Project
VOLTE features trial, other than basic VOLTE, TTI Bundling/Voice Characteristics
Awareness Scheduling/ RObust Header Compression (ROHC)
Trial for CA implementation using 15Mhz (1800) & 5 Mhz (L2100)
MLB for Load Balance on High Congested Sites
Intra-eNodeB UL CoMP Trial to improve CEU Throughput
Feature trials such as ANR, Blind CSFB, Coverage based Redirection to UTRAN
PCImod3 Planning/ PRACH Planning
Power Audits on LTE to ensure Reference Signal transmission at proper power
considering PA & PB.
ANR Parameter tuning wrt deletion of Neighbors on the basis of ERROR
NCELL/REDUNDANCE NCELL/Maximum NCELL
Optimization of GUL Interworking parameters to ensure that selection, re-selection,
handover, redirection, CSFB and other RAT priority strategies are properly optimized
to ensure efficient interworking.
Worst Cells Analysis & Recommendation
Responsible for Benchmarking Project. Optimizing network in order to make it
number one in all agreed KPIs
On job training of team members
Various Traffic Retention and traffic shifting trials to shift traffic from 3G to 4G
Responsible for Bandwidth upgradation/expansion activity from 10M to 15M &
15M to 20M
RF Team Lead (MTN South Africa Project) (Feb 2015 till Feb 2017)
Managing team of 10 RF Engineers, 10 DT team and 2 RF survey team
Responsible for Benchmarking Project
Develop and execute planning & optimization team strategies to meet KPIs and
ensure proper operations of access networks.
Responsible to interact with Customer for Weekly/Monthly meetings
Follow ups with teams specially for the targeted operations like P3 and LTE 10M
implementation
Coordinating the operations of different departments & teams to ensure that they
all pull in the same direction
Attending & communicating management meetings by making suggestions
LTE RF Consultant
Worked on FDD network with 3M/ 5M & 10MHz band
PCImod3 Planning
PRACH Planning
Analysis of Accessibility (RRC Success Rate, ERAB Success Rate, X2 HO Success Rate,
S1 Failure Rate), Retainability (ERAB Drop Rate, ERAB Drops HO Execution, ERAB
Drops HO Preparation), Integrity (PDCP Throughput, Packet Loss Rate), Network
Usage (UL/DL PRB Usage, UL/DL Number of Active UE’s, UL/DL DATA Volume),
Mobility (Inter/Intra Frequency HO Preparation/Execution Success/Fail Rate, RAT
Success/Fail Rate to WCDMA/GSM) on Network level and cell level.
Troubleshooting of worst offender cells to improve overall Network/market level
KPI
[email protected]
Phone: 00-92-3442001072
Daily KPIs Monitoring
Network Capacity Audit and submit proposal for expansions.
Cell Reselection parameter tuning
Neighbor Planning & Optimization for IntraLTE and IRAT
LAC/TAC mapping to ensure faster CSFB Latency by avoiding LAU
Acceptance on behalf of MS team for LTE rollout of commercial network
PCImod3 Clashes identification and rectification
Optimize network in order to win MTN for P3 benchmarking
Parameter audit and alignment with baseline values
Enhanced CFI Adaptation feature trial which enables PDCCH symbol adaptation
based on number of required CCEs
Fast return to LTE feature trial implemented on all sites with collocated 3G
Trail for Adaptation of Periodic CQI Report
Trail for Enhanced UL Frequency Selective Scheduling
Trail for PUSCH DTX Detection
Trail for Intra – eNodeB UL CoMP Feature
Carrier Aggregation deployment to improve throughput
Implementing VoLTE on trial Cluster
To Improve LTE multi-layer traffic management and smooth interworking with
3G/2G
Troubleshooting NW problems using Layer3 analysis and identification of faulty UE
causing KPI degradation
MLB for loadsharing with UTRAN
3G RF Consultant
PSC Planning
New Site Planning for coverage and capacity
CE board planning for New and Congested sites
Power Board planning
Planning for Multi Carrier strategy and design
Trial and implementation of SON ANR & SON Master PSC auto mode
Trail for HSDPA Inter-Cell Power sharing. In order for optimum use of Power
resources
Trail for Flexible Dual Carrier HSDPA to increase the UE data rate and system
capacity
Trail for Dynamic Configuration of HSDPA CQI to improve throughput
Trail for DPCH Maximum Power Restriction to improve HSDPA throughput
Trail for HSDPA Scheduling Based on UE Location
Multiband DRD based on UE pathloss
Multi Carrier strategy implementation (3xU2100; 1xU900)
Trail for CE Efficiency Improvement for HSUPA TTI 2ms
Adaptive RACH trial to improve RTWP
Responsible for tuning of 3rd carrier and 4th carrier strategy in the network.
FACH congestion Rectification on RNC level by enable switch P2D bypassing FACH
in case of high FACH utilization
CS/PS/HSDPA/HSPA+ performance improvement (Accessibility, Retainabilty and
throughput).
Load Sharing and Congestion(CE/Code/Power/IUB) Optimization
2ms/10ms HSUPA optimization
[email protected]
Phone: 00-92-3442001072
3G/4G RF Planning & Optimization ADVISOR (TELENOR PAKISTAN)
(June 2014 till Dec 2014)
Responsible for successful 3G deployment.
Main responsibilities are to manage vendor (ZTE), RAN algorithm development and
smooth execution with 2G algorithm.
RAN KPI formulation.
Feature/Parametric tuning
Responsible to train whole RAN organization on the formulation of optimization
principles
Responsible to provide all integration, configurations, testing, Data fills, and
acceptance plans to be executed by vendor organization on behalf of Telenor
Pakistan
RF Planning & Optimization Team Lead (Omantel Project–Oman)
(January 2013 till June 2014)
Managing team of 8 RF Engineers, 6 DT team, 3 survey engineer.
Coordinating with Project and Marketing team for RF related issues. Regular
customer meeting & taking care of the requirements & queries.
Develop and execute planning & optimization team strategies to meet KPIs and
ensure proper operations of access networks.
Manage team for Initial tuning and survey separately in order to formulize steps
and checklist require for surveys and Initial tuning
RF Consultant LTE
Managing planning Engineers for LTE site planning
LTE rollout of commercial network, including planning (PCI, PRACH, TA),
Single Site verification of LTE Sites.
VIP customer complaint.
LTE Cluster Optimization (Improve RSRP/SINR/Accessibility/Retainability/CSFB).
LTE daily worst Cells Analysis and recommendations.
Daily KPIs Monitoring
Worst Cells Analysis & Recommendation
Implementing CSFB on a Network
Understanding of Load Control/Admission Control/ Congestion Control and Load
Balancing
Cell Reselection parameter tuning
Neighbor Planning & Optimization for IntraLTE and IRAT
Successfully done trial of MIMO 4T4R
RF Consultant UMTS
Preparing Trail strategies for golden cluster and recording results.
Responsible for implementing HSPA+ in the network. Finalizing strategy with
solution team.
Implementing HSUPA
Implementing 2nd Carrier with U2100 in the network
Making & finalizing Multi carrier strategy and parameter finalization to implement
2nd carrier in the network, network planning for 2nd carrier (CE, IUB, WRFU power
calculation for expansion, plan hardware expansion to make network ready for
implementing 2nd carrier).
Troubleshoot and optimize network after F2 implementation
Design and implement strategy for 3rd carrier with U2100 in Muscat Region
Design and implement strategy for 3rd carrier with U900 for Coverage in outside
Muscat Region
DC implementation.
Responsible for Omantel Network Antenna Modernization Project by swapping
[email protected] Phone: 00-92-3442001072
single band to multi band Antenna
Cluster Optimization and submission of reports to customer
Trial of features like RL reestablishment, Enhanced Fast Dormancy
FACH congestion Rectification on RNC level
CS/PS/HSDPA/HSPA+ performance improvement (Accessibility, Retainabilty and
throughput).
Load Sharing and Congestion(CE/Code/Power/IUB) Optimization
Troubleshoot and optimization require for Mobility (SHO/HHO/IRAT)
RF Planning & Optimization Team Lead (Vodacom project–South Africa)
(May 2011 till May 2012)
Scrambling Code Planning
Troubleshooting Multi carrier issues
Parameter Audit & parameter tuning
New site, Cluster and RNC level KPI monitoring
Cluster drive analysis on Actix and Genex Assistant
Cell Reselction paramter tunning
Implementing Random Camping Strategy
CS/PS/HSDPA/HSPA+ performance improvement (Accessibility, Retainabilty and
throughput).
Worked on Huawei RAN10/RAN11 & RAN12. RAN13 was just implemented
CHR/PCHR and Call Fault analysis on KylinPro/UMAT/PCHR analyzer and Genex
Naster
Implementing new feature DC HSDPA to achieve higher throughput
VIP call complaints analysis & recommendations for the improvement
Identifying low throughput issues and the resolution to improve throughput
Worst cell analysis and improvement
Neighbor Planning for Interfreq/Intrafreq and IRAT neighbors
Site Planning by using Atoll Prediction. Arrange and conduct Technical Site Surveys
for different candidates
SPM migration whenever required
WBBP board selection for CEs according to the requirement and BTS type
3G RF Planning & Optimization Engineer (Consultant in Etisalat project -UAE)
(March 2010 till May 2011)
Monitor and analyze KPI Network statistics on daily basis.
Achieve and maintain the radio network performance as per the contracted KPIs.
PS/HSDPA/HSPA+ performance improvement (Accessibility, Retainabilty and
throughput).
3G Performance KPI and capacity monitor. Considering CE/Code/Power/IuB both
CS/PS congestion and adjust their LDR/DCCC/IRAT parameter etc to reduce it.
Knowledge on how IRAT procedures can affects the overall Service Quality both for
PS and CS traffic, between 2G and 3G networks for parameterization and to define
Understands the relationship between Soft/Softer Handovers and Network
Capacity, and how to optimize both.
Perform troubleshoot for problematic cells and perform traces to resolve the issue.
Daily worst cell analysis and recommendation to improve KPIs for cell degrading
overall RNC performance
Neighbor engineering of 3G to 3G and 3G to 2G sites.
Troubleshooting of Drop Calls, Set up Failures, Soft Handover, Inter-System HO,
Cell Reselection
Perform RNP & RNO activities such as: radio optimization, statistical handling and
analysis, radio recording function, RAN parameter adjustment, RAN features
optimization, field measurements
Perform support for the customer complains related to radio network design and
optimization.
Able to make recommendations in parameter changes, feature activations on drive
[email protected]
Phone: 00-92-3442001072
test data to improve the system performance.
Able to collect and analyze drive data and performance statistics, and solve
complex issues in different environments.
Analyze the drop call during the drive test with help of RNC trace+CHR.+Logfiles
Experience in Scrambling Code and Neighbor planning.
Daily usage of PROBE, ASSISTANT, GENEX/NASTAR, M2000 and LMT as well as
other optimization tools.
Senior 3G RF Planning & Optimization Engineer/Team Lead (STC project -
BAHRAIN ) (Dec 2009 till Feb 2010)
Responsible for KPIs maintenance of RNC.
Cluster Optimization to meet all KPIs for Cluster acceptance agreed with the
customer.
Analysis and recommendation for all events including call drop; Call Setup failure;
Access failure and SHO failure using drive test logs.
AMR CS & PS calls analysis.
VIP routes Optimization, recommendations for the improvement of Ec/Io, missing
neighbors,azimuth to provide better coverage on VIP routes using GENEX Assistant
(Huawei’ s post processing tool).
3G sites Neighbor planning using GENEX Nastar Planning tool and its
implementation in Huawei’s Local Maintenance Terminal (LMT) according to
Neighbor Planning strategy agreed with the customer.
Scrambling code planning for the 3G sites
RF Planning & Optimization Consultant (AirCom Zain Ghana - Ericsson)
(April 2008-September 2009)
RF Consultant UMTS (Ericsson)
UMTS Design & Optimization
Coverage analysis and recommendation to improve cluster RSCP and Ec/Io.
Statistical Analysis of Daily, Hourly KPI Stats of Cell Level.
Pilot Pollution rectification and improvement (by RF Optimization including
reorientation & tilting)
Collect Data from Reporting Suite to monitor and analyze Key Performance
Indicators (like CS CSSR, PS CSSR, CS Drops, PS Drops, CS and PS ISHO success rate)
Recommend power settings and parameter changes for R99 and HSDPA
throughput improvements.
Identify cause of Dropped Calls, Access Failure and Low HSDPA Throughput, Pilot
Pollution and Interference
Neighbor list audit and optimization.
Neighbor engineering of 3G to 3G and 3G to 2G sites
Troubleshooting of Drop Calls, Set up Failures, Soft Handover, Cell Reselection
RAN KPI (cell availability, RRC setup success rate, RAB setup success rate, RAB drop
rate, Soft Handover, BLER, ISHO, cell reselection, power control)
Responsible for Cell planning, site surveys, site candidate selections, Scrambling
Code Planning/Cell Data Parameters, Neighbor Relations Optimization, integration
and acceptance of new sites
RF Consultant GSM (Ericsson)
Stats monitoring on daily basis using Optima and command handling.
Optimization of the newly On Air sites.
Worst cells analysis and recommendations
Initial tuning of newly on-air worst sites
Database Audit for new sites / BSC’s to find inconsistencies.
Included in all aspects of Initial Nominal Planning for maximum coverage &
capacity.
[email protected]
Phone: 00-92-3442001072
Responsible for the validation of all the surveys done by the survey engineers after
the survey.
Conducting Technical Site Surveys for new BTS / BSC sites and analyzing on ground
situations to produce the best result.
Generating Prediction Maps using Planet EV 4.2.
Conducting Area profiling of new cities to create the nominal plan
BSC/RNC Dimensioning w.r.t BTS/Node B’s for both 2G & 3G networks
Making Performance Monitoring procedure for the upcoming sites.
Frequency Planning
Using RNO tools like MRR, FAS, FOX, NOX to categorize the problem and then
implementing the desired solution to overcome the issues in network.
Using RNO tools like MRR, FAS, FOX, NOX to categorize the problem and then
implementing the desired solution to overcome the issues.
Missing 3G to 2G HO optimization.
Assistant Manager RF in Telenor Pakistan
(February 2005-April 2008)
Managing team of 18 RF Engineers, including Telenor and LCC Planning Engineers
Coordinating with Project/Implementation and Marketing team for RF related
issues. Regular vendor meeting & taking care of the requirements & queries.
Develop and execute planning & optimization team strategies to meet KPIs and
ensure proper operations of access networks.
Leading task of Site Planning and all necessary co-ordination with vendor and TP
planning team.
Responsible for master plan of new sites.
Leading Cluster Acceptance activity and responsible for all co-Ordination between
vendor and operator.
Leading task of frequency Planning and frequency retuning for the expansion of
900 TRX and for better network quality.
Responsible for planning of phase IV coverage and capacity sites.
Responsible and manage task of Area profiling.
Leading and managing TSS for Phase IV sites including site evaluation for the
candidates provided by the RE/SA before TSS; co-ordination between different
departments and vendor.
Preparing RF Technical Design Proposal for In-building Solutions
Performing RF surveys and then preparing appropriate design and proposal
products such as antenna location and schematic drawings.
Verify Macro, Micro and In-building coverage plans to meet quality specifications.
Leading task for all repeater installation recommendations and its
Commissioning
RF Planning & Technical Site Survey (TSS) of New Sites. (BCCH, TCH, Neighbors of
each cell, Azimuth, hand over, and other Cell Parameters).
Responsible for INITIAL TUNING activities for new upcoming sites.
I was responsible for the smooth launch of remote cities.
RF Optimization (Telenor Pakistan - NSN):
Involved in deep Drive test using TEMS Investigation Tool for new and
existing sites’ Coverage, Handover & interference issues.
Statistical analysis of the network (especially, DCR, HSR, CSSR, SDCCH
& TCH Blocking, Interference, Outer & inner zone Traffic for Concentric
Cells).
SDCCH Time Slots Audit.
Addition/Expansion of TRXs on the basis of RF Utilization.
Suggestion for HR implementation on the basis of traffic utilization on
particular cells.
[email protected]
Phone: 00-92-3442001072
Daily and Weekly analysis of the network on cluster basis and BSC level.
Altering azimuths and tilts to optimize the overshooting & weak signal
issues.
Post Drive test analysis to reach the root cause.
RF Engineer (GSM)
(February 2003 – February 2005)
Wireless Network Solutions(WNS)
WNS is a service-oriented company, which provides Telecommunication
solutions. I worked in that company as a team player and provided solutions
with my team to corporate network.
Key responsibilities included
Involved in all issue based and planned Drive test activities.
Monitoring of Cell, Carrier and Neighbor stats such as Call Setup Success
Rate(CSSR), Drop call Rate(DCR), Handover Success Rate(HSR),TCH congestion
( Inner or Outer Zone), SDCCH congestion, Path balances & Interferences ( IOI).
Give full RF specifications for new sites (Antenna type, azimuth, tilt, feeder’s type).
Conducted Technical Site Surveys of new sites of Cities/Remote.
Planned a drive test route for a single as well as cluster of sites.
TOOLS:
Aircom Asset Enterprise Edition 5
ATOLL
GENEX NASTAR
Genex Assistant
ACTIX
TEMS Disovery
Drive Test Tools: TEMS 5.1.1/Investigation (Ericsson); TEMS 6.1.1/Investigation; GENEX
PROBE;
PLANET EV (ver 4.2) Planning Tool for Cell planning.
GENEX ASSISTANT 1.53 & 2.2 for post processing tool.
Optima for stats monitoring
MFiol/Winfiol for Command handling
Ericsson OSS RNO/CNA
Business Object
Mapping Tool: MapInfo Professional V 7.5,
Statistical Analysis: SPOTS.
Using Google Earth to perceive necessary information about the clutter
MCOM/PIANO and AFP PLANET for Frequency Planning
MCOM/NASTAR tool for Neighbor Planning
EDUCATION
B.E. (Electrical) 2002
N.E.D University of Engineering & Technology
Karachi ,Pakistan
First Division
[email protected]
Phone: 00-92-3442001072