Std-Ze-Itp-000001-Is00 - C.S. Shell and Tube Heat Exchangers
Std-Ze-Itp-000001-Is00 - C.S. Shell and Tube Heat Exchangers
1-BEFORE FABRICATION
H H H H H H
H H AR AR AR AR
H H AR AR AR AR
MECHANICAL (AND OR THERMAL)
N
CALCULATION REVIEW
H H AR AR AR AR
H H R R R R
Review will be at Contractor's
WELDERS AND WELDING OPERATORS
N Inspector charge in Supplier's
QUALIFICATION workshop
H H R R R R
H H W W R R
Tube-to-Tubesheet weld mock-up
Y
(Laboratory testing)
H H M M M M
H H M M M M
PT or MT on bevels Y
H H M M M M
H H W W SW M
H H R R R R
Plate test coupon for head (if hot formed).
Y
Mechanical test
3-SHELL FABRICATION
H H M M M M
H H M M M M
PT or MT on bevels Y
H H M M M M
Fit-up check for longitudinal and
circumferential welds (including shell to Dished N
heads circumferential welds)
H H M M M M
Welding monitoring (including welding of
Production Weld Test Coupon, where N
applicable)
H H M M M M
100% PT on back-gouging Y
H H R R R R
RT on longitudinal and circumferential welds RT films review to be notified
Y
(% to be specified) to TCM
Contractor Identification Code
4-CHANNEL FABRICATION
H H M M M M
H H M M M M
PT or MT on bevels Y
H H M M M R
Fit-up check for longitudinal and
circumferential welds (including channel to N
Dished heads circumferential welds)
H H M M M M
Welding monitoring (including welding of
Production Weld Test Coupon, where N
applicable)
H H M M M M
100% PT on back-gouging Y
H H R R R R
RT on longitudinal and circumferential welds RT films review to be notified
Y
(% to be specified) to TCM
H H M M M R
5-NOZZLE FABRICATION
H H M M M M
H H M M M M
100% PT or MT on bevels Y
H H M M M M
H H M M M M
Welding monitoring N
H H M M M M
H H M M M M
H H R R R R
H H M M M M
H H M M M M
H H M M M M
H H M M M M
H H M M M M
H H M M M M
H H M M M M
H H M M M M
UT on nozzle to shell / head welds, before
6.7 application of reinforcing pads (% to be Y
specified)
H H W W R R
Tubesheet and baffles VT and dimensional
N
check
H H R R R R
H H R R R R
Stress relieving of bended tubes plus 300mm
Y
on straight parts
H H W W W W
Boroscopic Inspection Y
H H M M M M
H H M M M M
H H M M M M
H H W W M R
H H M M M M
H H W W M R
100% PT on tube to tubesheet welds, after
Y
expansion
H H W W M R
H H W W M R
100% PT or MT on temporary attachments
8.1 Y
removal and arc strikes
H H W W M R
H H W W M R
H H W W M M
9-PWHT
H H M M R R
Application of thermocouple on exchanger and
9.1 N
calibration certificates review
H H W W R R
PWHT, including all Production Weld Test
N
Coupons (PTC)
H H R R R R
H H W W R R
Hardness test on all treated welds including
Y
external attachments
H H R R R R
H H W W R R
H H W W R R
Recordable UT on non-radiographable
Y
welds (% to be specified)
H H W W R R
PT or MT on 100% welds
Y
(internal, external, saddle and stiffeners)
H H H H H H
Internal Visual inspection of shell and channel,
Y
after PWHT
H H H H H H
Visual and dimensional check, after PWHT,
Y
including UT thickness check
H H W W M M
H H W W R R
H H W W R R
Air leak test with soap solution on reinforcing
11.1 Y
PAD
Contractor Identification Code
H H W W R R
12-PAINTING
H H R R R R
Preparation grades of welds, cut edges and
12.1 Y
other areas with surface imperfections
H H R R R R
H H W SW R R
Primer application Y
H H W R R R
H H W SW R R
H H W SW R R
intermediate application Y
H H W R R R
Measure of the wet film thickness for
Y
intermediate
H H W R R R
Measure of the dry film thickness for
Y
intermediate
H H W R R R
Finish application Y
H H W SW R R
H H H H H H
Measure of the dry film thickness for finishing
Y
and visual examination
H H W SW R R
H H W SW R R
H H W W W W
Repairing (if any) excluding touch ups due to
Y
mechanical damage
Contractor Identification Code
H H W W R R
H H W W R R
H H W W R R
Packing check and Packing List check
Packing certificate to be filled
(including commissioning and start up spare Y
and signed
parts)
H H H H W R
Dew point to be measured to
Preservation check (N2 filling, Silica Gel bags or
Y ensure complete drying out of
other agreed methods)
the equipment
H H W W R R
Sealing of threated holes of reinforcing pads Different sealing to be agreed
Y
(by plastic plugs or other suitable method) with Contractor
H H H H H H
H H
H H