0% found this document useful (0 votes)
244 views2 pages

Final Exam IT6301

The document is a review of a student's attempt on a final exam for an IT course. The exam included a question matching terms and details to complete statements. The review indicates the student correctly matched 6 of the 11 terms provided. No other information, such as the student's name, scores on other questions, or overall exam grade are included in the summary.

Uploaded by

Ton Lazaro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views2 pages

Final Exam IT6301

The document is a review of a student's attempt on a final exam for an IT course. The exam included a question matching terms and details to complete statements. The review indicates the student correctly matched 6 of the 11 terms provided. No other information, such as the student's name, scores on other questions, or overall exam grade are included in the summary.

Uploaded by

Ton Lazaro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

2/9/2021 Final Exam: Attempt review

Home / My courses / UGRD-IT6301-2023T / WEEK 14 Final Exam / Final Exam

Started on Tuesday, 9 February 2021, 4:54 PM


State Finished
Completed on Tuesday, 9 February 2021, 5:08 PM
Time taken 14 mins 17 secs
Grade 12.00 out of 20.00 (60%)

Question 1
Complete

Mark 12.00 out of 20.00

Match the term/details to complete each statement. 

Test data based on input values that are likely to require special handling by the program.  special test data

 A document reporting on any event that occurs during testing that requires further investigation. See: failure
small scale integration
analysis.

A process or meeting during which a work product or set of work products, is presented to project personnel,
review
managers, users, customers, or other interested parties for comment or approval. 

An automatic device that uses feedback to govern the physical position of an element. test incident report

An Electronic Industries Association (EIA) standard for connecting electronic equipment.  servomechanism

Relative to software changes, this means validating the change itself, assessing the nature of the change to
revalidation
determine potential ripple effects, and performing the necessary regression testing

A review conducted to evaluate preliminary test results for one or more configuration items; to verify that the
test procedures for each configuration item are complete, comply with test plans and descriptions, and satisfy
test readiness review
test requirements; and to verify that a project is prepared to proceed to formal testing of the configuration
items.

A classification of ICs [chips] based on their size as expressed by the number of circuits or logic gates they
RS-232-C
contain. 

An inherent, possibly accidental, trait, quality, or property of software; e.g., functionality, performance,
software characteristic
attributes, design constraints, number of states, lines or branches.

Period of time beginning when a software product is conceived and ending when the product is no longer
software life cycle
available for use.

Your answer is partially correct.

You have correctly selected 6.

◄ Final Quiz 2

Jump to...

https://trimestral.amaesonline.com/2023/mod/quiz/review.php?attempt=433085&cmid=29269 1/2
2/9/2021 Final Exam: Attempt review

https://trimestral.amaesonline.com/2023/mod/quiz/review.php?attempt=433085&cmid=29269 2/2

You might also like