Project: Kalinga Hospital at Bhubaneswar: Sankalpa Tech Bangalore

This document is a bill of quantity for HVAC works for the Kalinga Hospital project in Bhubaneswar. It includes two items: 1. Supply, installation, testing and commissioning of a 200 TR air cooled chiller package with fixed speed compressor. The rate should include accessories like insulation, mounts and wiring. 2. Supply and installation of an adiabatic cooling system to reduce condensing temperature for the chiller by spraying mist over a panel for partial water evaporation. This includes a dedicated controller. The total amount for these two items is listed as 0, as rates would need to be provided. Specifications and requirements are also defined for the chiller package.

Uploaded by

johnnysuneeth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views2 pages

Project: Kalinga Hospital at Bhubaneswar: Sankalpa Tech Bangalore

This document is a bill of quantity for HVAC works for the Kalinga Hospital project in Bhubaneswar. It includes two items: 1. Supply, installation, testing and commissioning of a 200 TR air cooled chiller package with fixed speed compressor. The rate should include accessories like insulation, mounts and wiring. 2. Supply and installation of an adiabatic cooling system to reduce condensing temperature for the chiller by spraying mist over a panel for partial water evaporation. This includes a dedicated controller. The total amount for these two items is listed as 0, as rates would need to be provided. Specifications and requirements are also defined for the chiller package.

Uploaded by

johnnysuneeth
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

PROJECT : KALINGA HOSPITAL AT

BHUBANESWAR

TENDER FOR

CHILLERS

SUMMARY

SECTION DESCRIPTION AMOUNT

A EQUIPMENTS -

GRAND TOTAL

Amount In words:

Signature of Tenderer

SANKALPA TECH
BANGALORE
HVAC BOQ

PROJECT : KALINGA HOSPITAL AT


BHUBANESWAR

BILL OF QUANTITY - HVAC WORKS

S.NO. DESCRIPTION UNIT QTY RATE AMOUNT

A. EQUIPMENTS

1
Supply, installation,testing and commissioning of 200 TR nominal capacity
AIR Cooled Package Chiller with Fixed Speed.The chiller shall have semi-
hermitic Screw compressor, shell and tube chiller with necessary thermal
insulation, copper tube and aluminium fin condenser coil with adequate
number of fans for air circulation over the coils. The fans to be with IP 55
protected squirrel cage induction motors and interconnected copper
refrigerant piping with necessary accessories. The package chillers shall
have factory wire controls panel with touch type 12" LED screen, multiple
compressor and independent refrigerant circuit with thermostatic expansion
valve. Chillers shall be with initial charge of refrigerant R-134a or equivalent
and oil.
The price shall include anti-vibration mount,insulation, bellows.The
electrical accessories and components should withstand +/- 10% voltage
variation. Chillers should be selected for following duty conditions. and chiller
make should be AHRI certified
The cost shall also include supply and wiring of contactors, auxiliary
contactors, timers, control switches and providing necessary interlocking
between all high side equipments including all wiring and testing.(1W+1S )

Please note it is the responsibility of the HVAC contractor to provide the


necessary details for giving provision in the electrical panel

CHW In 12.0 deg C


CHW Out 7.0 deg C
Ambient temp 38 deg.C Dry Bulb
The chiller
should have provision for compatibility with BMS system capable of being
compatible with BacNet / Modbus / LON protocol.The chiller shall have soft
starter and spring isolator for vibration isolation.

Kindly refer to the enclosed chiller equipment schedule

Note: The enclosed Chiller data sheet has to be filled in


and submitted along with the tender

Supply Nos 1 0
Installation Nos 1 0

2 Factory fitted Adiabatic Cooling System to reduced Condensing


temperaturein which water should be sprayed in the form of mist over a
dedicated panel (plastic net), thus improving the heat exchange process with
a partial water evaporation.The cost shall also include Dedicated controller
with temperature probe to manage the ON/OFFsolenoid Valve,Nozzle,Plastic
Net etc..,
Supply Nos 1 0
Installation Nos 1 0

TOTAL 0