Test Procedure
1. Avail LC on concern Transformers.
2. Transformer breaker at HT/LT end has been isolated.
3. Discharging / Earthing has been done at both HV/LV end.
4. LV side PT fuse kept in open condition.
Ratio Measurement :-
1. Connect the kit Terminal leads to LV side terminals of transformer.
2. Enter all parameters of the transformers such as KVA / Tap position / Voltage Ratings of Primary
secondary / Vector Group / Calculated ratio etc.
3. Calculated ratio Formula :- HV / ( LV line voltage).
4. Inject Voltage to all the 3 Phases. Check the Ratio values which has to be similar to our calculated
Value. Excitation current value has to be noted.
5. Phase angle deviation to be noted.
6. Error percentage value must be less than 0.5%.