Cost Estimation Project Hydropower
Cost Estimation Project Hydropower
&
COST ESTIMATION
Upah Pekerja
Harga
No Item Unit Harga / Satuan
KETERANGAN
Peralatan
0.05 0.03
0.05 0.03
0.05 0.03
Biaya angkut / btg / Km = Rp. 12.50 0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03
Biaya angkut / Kg / Km = Rp. 1.12 0.05 0.03
0.05 0.03
3.00 1.50
3.00 1.50
3.00 1.50
3.00 1.50
2,900,000.00
2,900.00
Hal = 02 / 03
HARGA SAMPAI LOKASI BIAYA TOTAL HARGA
JARAK ANGKUT ( KM ) BIAYA RETRI- SAMPAI LOKASI
QUARRY - TOTAL ANGKUT BUSI
PROYEK JARAK (Rp) (Rp) (Rp)
Hal = 03 / 03
HARGA SAMPAI LOKASI BIAYA TOTAL HARGA
JARAK ANGKUT ( KM ) BIAYA RETRI- SAMPAI LOKASI
QUARRY - TOTAL ANGKUT, BUSI
AMP JARAK DLL (Rp) (Rp) (Rp)
Grand Total = Rp -
ASUMSI
Dilaksanakan untuk galian di tanah yang biasa
Lokasi pekerjaan = Powerhouse, penstock, headpond,waterway,bendung
Kondisi Jalan = sedang - baik
Jam kerja efektif per-hari Tk 10.00 Jam
Faktor pengembangan bahan Fk 1.00 -
Hasil galian dibuang , dengan jarak rata-rata L 0.50 Km
METHODE PELAKSANAAN
1 Tanah digali sesuai rencana yang telah ditetapkan menggunakan Excavator
2 Hasil galian dibuang di disposal pada lokasi yang aman dan tidak mengganggu dan sebagian dibuang ke lokasi lain dengan menggunakan Dump Truck.
3 Sekelompok pekerja merapikan hasil galian , sehingga didapatkan permukaan hasil galian sesuai rencana.
DUMP TRUCK
Kapasitas bak V 4.00 m3
Faktor Efisiensi alat Fa 0.78 -
Kecepatan rata-rata bermuatan v1 30.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
- Muat T1 9.16 menit
- Waktu tempuh isi T2 1.00 menit
- Waktu tempuh kosong T3 0.60 menit
- Lain-lain (tunggu , putar , dll) T4 1.00 menit
11.76 menit
ALAT BANTU
Diperlukan alat-alat Cangkul , pungki , belincong , dll 1 LS
b TENAGA KERJA
Produksi yang menentukan =EXCAVATOR
Produksi / jam Q1 26.21 m3/jam
Produksi / hari = Tk x Q4 Qt 101.97 m3
Upah Pekerja
0.0763 jam Pekerja @Rp 0 =Rp 0
0.0076 jam Mandor @Rp 0 =Rp 0
Sub total Upah =Rp 0
Alat2
0.038 jam Excavator @Rp 325,000 =Rp 12,401
0.063 jam Dump Truck @Rp 75,000 =Rp 4,711
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat 19,111
ASUMSI
Dilaksanakan untuk galian di tanah yang banyak batunya
Lokasi pekerjaan
Kondisi Jalan = sedang - baik
Jam kerja efektif per-hari Tk 10.00 Jam
Faktor pengembangan bahan Fk 1.22 -
Hasil galian dibuang , dengan jarak rata-rata L 0.50 Km
METHODE PELAKSANAAN
Tanah digali sesuai rencana yang telah ditetapkan menggunakan Excavator
Hasil galian dibuang di disposal pada lokasi yang aman dan tidak mengganggu dan sebagian dibuang ke lokasi lain dengan menggunakan Dump Truck.
Sekelompok pekerja merapikan hasil galian , sehingga didapatkan permukaan hasil galian sesuai rencana.
DUMP TRUCK
Kapasitas bak V 4.00 m3
Faktor Efisiensi alat Fa 0.78 -
Kecepatan rata-rata bermuatan v1 40.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
- Muat T1 19.37 menit
- Waktu tempuh isi T2 0.75 menit
- Waktu tempuh kosong T3 0.60 menit
- Lain-lain (tunggu , putar , dll) T4 1.00 menit
21.72 menit
ALAT BANTU
Diperlukan alat-alat Cangkul , pungki , belincong , dll 1 LS
TENAGA KERJA
Produksi yang menentukan =EXCAVATOR
Produksi / jam Q1 12.39 m3/jam
Produksi / hari = Tk x Q4 Qt 123.93 m3
Upah Pekerja
0.1614 jam Pekerja @Rp 0 =Rp 0
0.0161 jam Mandor @Rp 0 =Rp 0
Sub total Upah =Rp 0
Alat2
0.081 jam Excavator @Rp 325,000 =Rp 26,224
0.142 jam Dump Truck @Rp 75,000 =Rp 10,614
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat 38,837
ASUMSI
Dilaksanakan untuk galian di tanah endapan sungai
Lokasi pekerjaan = bendung, diversi
Kondisi Jalan = sedang - baik
Jam kerja efektif per-hari Tk 10.00 Jam
Faktor pengembangan bahan Fk 0.70 -
Hasil galian dibuang , dengan jarak rata-rata L 0.50 Km
METHODE PELAKSANAAN
1 Tanah digali sesuai rencana yang telah ditetapkan menggunakan Excavator
2 Hasil galian dibuang di disposal pada lokasi yang aman dan tidak mengganggu dan sebagian dibuang ke lokasi lain dengan menggunakan Dump Truck.
3 Sekelompok pekerja merapikan hasil galian , sehingga didapatkan permukaan hasil galian sesuai rencana.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
a. ALAT
EXCAVATOR
Kapasitas bucket V 0.7 m3
Faktor bucket Fb 0.8 -
Faktor Efisiensi alat Fa 0.78 -
Waktu Siklus
- Menggali T1 0.25 menit
- Mengisi / membuang T2 0.25 menit
- Lain-lain (manuver, dll) T2 0.5 menit
Ts1 1 menit
DUMP TRUCK
Kapasitas bak V 4.00 m3
Faktor Efisiensi alat Fa 0.78 -
Kecepatan rata-rata bermuatan v1 30.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
- Muat T1 6.41 menit
- Waktu tempuh isi T2 1.00 menit
- Waktu tempuh kosong T3 0.60 menit
- Lain-lain (tunggu , putar , dll) T4 1.00 menit
9.01 menit
ALAT BANTU
Diperlukan alat-alat Cangkul , pungki , belincong , dll 1 LS
b TENAGA KERJA
Produksi yang menentukan =EXCAVATOR
Produksi / jam Q1 37.44 m3/jam
Produksi / hari = Tk x Q4 Qt 374.40 m3
Upah Pekerja
0.5342 jam Pekerja @Rp 0 =Rp 0
0.0534 jam Mandor @Rp 0 =Rp 0
Sub total Upah =Rp 0
Alat2
0.027 jam Excavator @Rp 325,000 =Rp 8,681
0.034 jam Dump Truck @Rp 75,000 =Rp 2,527
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat 13,207
ASUMSI
Dilaksanakan untuk timbunan dengan tanah yang biasa
Lokasi pekerjaan = Powerhouse, penstock, headpond,waterway,bendung
Kondisi Jalan = sedang - baik
Jam kerja efektif per-hari Tk 10.00 Jam
Faktor pengembangan bahan Fk 1.00 -
Timbunan diambil dari disposal, dengan jarak rata-rata L 0.50 Km
METHODE PELAKSANAAN
1 Tanah diambil dari disposal dengan menggunakan Excavator
2 Tanah timbunan dibawa ke lokasi dengan menggunakan Dump Truck.
3 Sekelompok pekerja merapikan hasil timbunan , sehingga didapatkan permukaan hasil yang sesuai rencana.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
a ALAT
EXCAVATOR
Kapasitas bucket V 0.7 m3
Faktor bucket Fb 1 -
Faktor Efisiensi alat Fa 0.78 -
Waktu Siklus
- Menggali T1 0.15 menit
- Mengisi / membuang T2 0.2 menit
- Lain-lain (manuver, dll) T2 0.5 menit
Ts1 0.85 menit
DUMP TRUCK
Kapasitas bak V 4.00 m3
Faktor Efisiensi alat Fa 0.78 -
Kecepatan rata-rata bermuatan v1 30.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
- Muat T1 6.23 menit
- Waktu tempuh isi T2 1.00 menit
- Waktu tempuh kosong T3 0.60 menit
- Lain-lain (tunggu , putar , dll) T4 1.00 menit
8.83 menit
ALAT BANTU
Diperlukan alat-alat Cangkul , pungki , belincong , dll 1 LS
b TENAGA KERJA
Produksi yang menentukan =EXCAVATOR
Produksi / jam Q1 38.54 m3/jam
Produksi / hari = Tk x Q4 Qt 385.41 m3 / hari
Upah Pekerja
0.0519 jam Pekerja @Rp 0 =Rp 0
0.0052 jam Mandor @Rp 0 =Rp 0
Sub total Upah =Rp 0
Alat2
0.026 jam Excavator @Rp 325,000 =Rp 8,433
0.047 jam Dump Truck @Rp 75,000 =Rp 3,537
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat 13,969
Bahan-bahan
1.2 m3 Tanah Urug @Rp 75,000 =Rp 90,000
Sub total Bahan =Rp 90,000
Alat-Alat
0.02125 jam Alat bantu @Rp 1,000,000 =Rp 21,250
Sub total Alat =Rp 21,250
PEKERJAAN BETON
2 Beton (K125) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
5.200 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061
3 Beton (K175) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
6.400 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061
5 Beton (K250) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
7.500 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061
6 Beton (K300) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
8.000 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061
Bahan-bahan :
8.500 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Vibrator Roller @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061
Bahan-bahan :
1.125 kg Besi Beton Polos @Rp 9,450 =Rp 10,631
0.020 kg Kawat Ikat Beton diameter 3 mm @Rp 15,000 =Rp 306
Sub total Bahan =Rp 10,937
Bahan-bahan :
1.125 kg Besi Beton Polos @Rp 9,700 =Rp 10,913
0.020 kg Kawat Ikat Beton diameter 3 mm @Rp 15,000 =Rp 306
Sub total Bahan =Rp 11,219
Bahan-bahan :
0.500 kg Ijuk @Rp 20,000 =Rp 10,000
1.000 m Pipa SGP 4" @Rp 50,000 =Rp 50,000
Sub total Bahan =Rp 60,000
Bahan-bahan :
0.500 kg Ijuk @Rp 20,000 =Rp 10,000
1.000 m Pipa SGP 6" @Rp 55,000 =Rp 55,000
Sub total Bahan =Rp 65,000
PEKERJAAN LOGAM
Bahan-bahan :
0.012 zak Kapur Pasang @Rp 16,821 =Rp 202
0.010 m3 Pasir Pasang @Rp 60,000 =Rp 600
0.073 zak Semen PC @Rp #REF! =Rp #REF!
1.000 m2 Tegel Trotoar @Rp 16,500 =Rp 16,500
Sub total Bahan =Rp #REF!
Upah Pekerja :
0.094 hari Pekerja @Rp - =Rp -
0.009 hari Mandor @Rp - =Rp -
Sub total Upah =Rp -
Alat2
0.003 jam Motor Grader @Rp 500,000 =Rp 1,350
0.003 jam Vibrator Roller @Rp 200,000 =Rp 600
1.000 jam Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat =Rp 3,950
Upah Pekerja :
1.015 hari Pekerja @Rp - =Rp -
0.101 hari Mandor @Rp - =Rp -
Sub total Upah =Rp -
Bahan-Bahan
1.325 m3 Material Pilihan @Rp 30000 =Rp 39,750
Sub total Bahan =Rp 39,750
Alat Alat
0.029 jam Motor Grader @Rp 500,000 =Rp 14,500
0.014 jam Vibrator Roller @Rp 200,000 =Rp 2,735
1.000 jam Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat =Rp 19,235
AGREGAT KASAR
- Sirtu 0.65 @Rp 125,000 =Rp 81,250
AGREGAT HALUS
- Pasir 0.6 @Rp 44,943 =Rp 26,966
- Urugan pilihan 0.24 @Rp 30,000 =Rp 7,200
Upah Pekerja :
1.015 hari Pekerja @Rp - =Rp -
0.187 hari Mandor @Rp - =Rp -
Sub total Upah =Rp -
Bahan-Bahan
0.453 m3 Agregat Kasar @Rp 81250 =Rp 36,806
0.747 m3 Agregat Halus @Rp 34165.8 =Rp 25,522
Sub total Bahan =Rp 62,328
Alat2
0.053 jam Excavator @Rp 325,000 =Rp 17,361
0.201 jam Dump Truck @Rp 75,000 =Rp 15,058
0.015 jam Vibrator Roller @Rp 200,000 =Rp 3,017
1.000 LS Alat Bantu @Rp 2000 =Rp 2,000
Sub total Alat =Rp 37,436
AGREGAT HALUS
- Debu batu 0.66 @Rp 125,000 =Rp 82,500
- Pasir 0.34 @Rp 44,943 =Rp 15,281
FILLER
- Debu batu 0.15 @Rp =Rp 0
- Pasir 0.15 @Rp =Rp 0
- Semen 0.7 @Rp #REF! =Rp #REF!
Upah Pekerja :
2.900 hari Pekerja @Rp - =Rp -
0.290 hari Mandor @Rp - =Rp -
Sub total Upah =Rp -
Bahan-Bahan
0.473 m3 Agregat kasar @Rp 140,850 =Rp 66,622
0.577 m3 Agregat halus @Rp 97,781 =Rp 56,419
93.571 kg Filler @Rp #REF! =Rp #REF!
160.180 kg Aspal Buton @Rp 562 =Rp 90,021
Sub total Bahan =Rp #REF!
Alat2
0.053 jam Excavator @Rp 325,000 =Rp 17,361
0.201 jam Dump Truck @Rp 75,000 =Rp 15,058
0.015 jam Vibrator Roller @Rp 200,000 =Rp 3,017
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat =Rp 37,436
I EQUIPMENT
- Backhoe, type PC 200 long Boom
- Bucket capacity qb 0.70 m3
II UNIT PRODUCTIVITY
- Bucket factor k 0.90
- Productivity, q = qb x k q 0.63 m3/cycle
IV CORRECTION FACTOR
- Work efficiency a 0.80
- Work condition b 0.80
- Swing factor and depth digging factor c 0.90
- Loading factor d 0.82
V PRODUCTIVITY
Q = { (3600/T) x q x a x b x c x d Qe 38.26 m3/hour
I EQUIPMENT
- Dump truck, type class 10 ton
- Dump capacity qd 4.00 m3
- Backhoe, type PC 200 long Boom
- Backhoe productivity Qe 38.26 m3/hour
II CYCLE TIME
- Distance to spoil bank l 1.00 km
- Average velocity in fully loaded vl 19.00 km/h
- Average velocity un empty ve 25.00 km/h
- Loading time, t1 = qd/Qe x 60 t1 6.27 min
- Loaded travelling time, t2 = ( l/vl ) x 60 t2 3.16 min
- Dumping truck manuvre t3 2.00 min
- Empty travelling time, t4 = ( l/ve ) x 60/1000 t4 2.40 min
- Total cycle time, T = t1 + t2 + t3 + t4 T 13.83 sec
IV CORRECTION FACTOR
- Work efficiency a 0.85
V PRODUCTIVITY
Q = { (60/T) x qd x a } Qd 14.75 m3/hour
CALCULATION FOR PRODUCTION CAPACITY
I EQUIPMENT
- Backhoe, type PC 200 long Boom
- Bucket capacity qb 0.70 m3
II UNIT PRODUCTIVITY
- Bucket factor k 0.60
- Productivity, q = qb x k q 0.42 m3/cycle
IV CORRECTION FACTOR
- Work efficiency a 0.85
- Work condition b 0.85
- Swing factor and depth digging factor c 0.90
- Loading factor d 0.60
V PRODUCTIVITY
Q = { (3600/T) x q x a x b x c x d Qe 21.07 m3/hour
I EQUIPMENT
- Dump truck, type class 6 m3
- Dump capacity qd 4.00 m3
- Backhoe, type PC 200 long Boom
- Backhoe productivity Qe 21.07 m3/hour
II CYCLE TIME
- Distance to spoil bank l 1.00 km
- Average velocity in fully loaded vl 19.00 km/h
- Average velocity un empty ve 25.00 km/h
- Loading time, t1 = qd/Qe x 60 t1 11.39 min
- Loaded travelling time, t2 = ( l/vl ) x 60 t2 3.16 min
- Dunping truck manuvre t3 2.00 min
- Empty travelling time, t4 = ( l/ve ) x 60/1000 t4 2.40 min
- Total cycle time, T = t1 + t2 + t3 + t4 T 18.95 sec
IV CORRECTION FACTOR
- Correction factor a 0.80
V PRODUCTIVITY
Q = { (60/T) x qd x a } Qd 10.13 m3/hour
CALCULATION FOR PRODUCTION CAPACITY
I EQUIPMENT
- Backhoe, type PC 200 long Boom
- Bucket capacity qb 0.70 m3
II UNIT PRODUCTIVITY
- Bucket factor k 0.55
- Productivity, q = qb x k q 0.39 m3/cycle
IV CORRECTION FACTOR
- Work efficiency a 0.80
- Work condition b 0.80
- Swing factor and depth digging factor c 0.90
- Loading factor d 0.60
V PRODUCTIVITY
Q = { (3600/T) x q x a x b x c x d Qe 15.21 m3/hour
I EQUIPMENT
- Dump truck, type class 10 ton
- Dump capacity qd 4.00 m3
- Backhoe, type PC 200 long Boom
- Backhoe productivity Qe 15.21 m3/hour
II CYCLE TIME
- Distance to spoil bank l 1.00 km/h
- Average velocity in fully loaded vl 19.00 km/h
- Average velocity un empty ve 25.00 km/h
- Loading time, t1 = qd/Qe x 60 t1 15.78 min
- Loaded travelling time, t2 = ( l/vl ) x 60 t2 3.16 min
- Dumping and truck manuvre t3 2.00 min
- Empty travelling time, t4 = ( l/ve ) x 60 t4 2.40 min
- Total cycle time, T = t1 + t2 + t3 + t4 T 23.34 sec
IV CORRECTION FACTOR
- Correction efficiency a 0.80
V PRODUCTIVITY
Q = { (60/T) x qd x a } Qd 8.23 m3/hour
WORK DIVISION : Earthworks
SECTION : Hauling to spoil bank for hard rock disposal
I EQUIPMENT
- Dump truck, type class 10 ton
- Dump capacity qd 4.00 m3
- Backhoe, type PC 200 long Boom
- Backhoe productivity Qe 8.23 m3/hour
- Boldozer, type D7 Caterpillar
II CYCLE TIME
- Distance to spoil bank l 1.00 km/h
- Average velocity in fully loaded vl 17.00 km/h
- Average velocity un empty ve 22.00 km/h
- Loading time, t1 = qd/Qe x 60 t1 29.18 min
- Loaded travelling time, t2 = ( l/vl ) x 60 t2 3.53 min
- Dumping and truck manuvre t3 2.00 min
- Empty travelling time, t4 = ( l/ve ) x 60 t4 2.73 min
- Total cycle time, T = t1 + t2 + t3 + t4 T 37.43 sec
IV CORRECTION FACTOR
- Correction efficiency a 0.80
V PRODUCTIVITY
Q = { (60/T) x qd x a } Qd 5.13 m3/hour
ok
mon material, clearing, stripping
REMARKS
0.36-1.17
ok
for common material, clearing,
REMARKS
ok
ered rock disposal
REMARKS
good condition
90o swing angle, 60% optimum depth
weathered rock
ok
for weathered rock disposal
REMARKS
ok
REMARKS
REMARKS
for hard rock disposal
REMARKS
Tabel : Daftar Item Pekerjaan
Proyek Pembangkit Listrik Tenaga Air Tamboli
I PEKERJAAN PERSIAPAN
1.01 Pembuatan BowPlank 78,400.00 7,840.00 15,680.00 101,920.00 m2
1.02 Pembuatan Direksi Kit dan Barak Pekerja 375,000.00 37,500.00 75,000.00 487,500.00 m2
1.03 Pembuatan Papan Nama Proyek 344,684.00 34,468.40 68,936.80 448,089.20 m2
1.04 Pekerjaan Pagar Pengaman BCR tinggi 90 cm 101,500.00 10,150.00 20,300.00 131,950.00 m2
I PEKERJAAN SUNGAI
1 Pembuatan Cofferdam 100,000.00 10,000.00 20,000.00 130,000.00 m3
2 Pembongkaran Cofferdam 10,000.00 1,000.00 2,000.00 13,000.00 m3
3 Pengeringan Sungai - - 50,000,000.00 LS
4 Pasangan batu bronjong kawat (1m x 3m x 0.5m)
5 - Menggunakan Kawat ø6mm 556,245.00 55,624.50 5,562.45 617,431.95 buah
6 - Menggunakan Kawat ø8mm 759,585.00 75,958.50 7,595.85 843,139.35 buah
7 - Menggunakan Kawat ø10mm 897,585.00 89,758.50 8,975.85 996,319.35 buah
II PEKERJAAN TANAH
Manual
1 Tebas tebang berupa memotong dan membersihkan lokasi dari tanaman 0.00 - - - m2
2 Cabut tunggul tanaman keras min.diam.15 cm dgn membuang sisa kayu & akar 0.00 - - - m2
Mekanis
1 Pembersihan dan pengupasan 7,449.44 744.94 1,489.89 9,684.27 m3
2 Galian terbuka pada tanah batuan keras 38,837.49 3,883.75 7,767.50 50,488.73 m3
3 Galian terbuka pada tanah batuan lapuk 19,111.33 1,911.13 3,822.27 24,844.73 m3
4 Galian terbuka pada tanah biasa dan endapan sungai 13,207.47 1,320.75 2,641.49 17,169.71 m3
5 Pekerjaan Timbunan Sembarang 13,969.04 1,396.90 2,793.81 18,159.75 m3
6 Pekerjaan Pengurugan Sirtu dan pemadatan 170,857.60 17,085.76 34,171.52 222,114.88 m3
6 Pekerjaan Pengurugan Tanah dengan pemadatan 111,250.00 11,125.00 22,250.00 144,625.00 m3
8 Pekerjaan Pengurugan Pasir (Padat) 196,138.00 19,613.80 39,227.60 254,979.40 m3
9 Pekerjaan Urugan Clay Soil 74,500.00 7,450.00 14,900.00 96,850.00 m3
VI PEKERJAAN LOGAM
6.01 Pekerjaan Struktur Baja SS 400 20,685.71 2,068.57 4,137.14 26,891.43 kg
6.02 Pekerjaan Pembuatan Steel welded Penstock (material SM 50) 25,695.24 2,569.52 5,139.05 33,403.81 kg
6.03 Pekerjaan Struktur Baja SS 400 ditambah proses machining 22,685.71 2,268.57 4,537.14 29,491.43 kg
Pekerjaan Lantai
Pekerjaan Plesteran Halus 1 Pc : 2 Ps , tebal 1.5 cm 18752 1,875.20 3,750.40 26,440.32 m2
Pekerjaan Plesteran Halus 1 Pc : 3 Ps , tebal 1 cm 16674 1,667.40 3,334.80 23,510.34 m2
Pekerjaan Plesteran Halus 1 Pc : 3 Ps , tebal 1.5 cm 28512 2,851.20 5,702.40 40,201.92 m2
Pekerjaan lantai keramik 30x30 81411.05 8,141.11 16,282.21 114,789.58 m2
Pekerjaan lantai keramik 20x20 81981.2 8,198.12 16,396.24 115,593.49 m2
Pekerjaan Dinding
Pasangan bata merah tebal 1/2 bata adukan 1PC : 2PP #REF! #REF! #REF! #REF! m2
Pasangan bata merah tebal 1/2 bata adukan 1PC : 4PP #REF! #REF! #REF! #REF! m2
Pekerjaan Plesteran Dinding 1 : 3 #REF! #REF! #REF! #REF! m2
Pekerjaan Key Panel 115,000.00 11,500.00 23,000.00 149,500.00 m2
Pembuatan Dinding Penahan Tanah dari Batu Kali #REF! #REF! #REF! #REF! m3
Waterstop dengan material PVC - - 100,000.00 m
Sambungan kontraksi dengan bitumen atau pengisi samb. Elastometrik - - 50,000.00 m
Pekerjaan Pasangan
1 Pekerjaan Pasangan batu kali Mortar Type M (1 PC : 2 PP) #REF! #REF! #REF! #REF! m3
2 Pekerjaan Pasangan batu kali Mortar Type S (1 PC : 3 PP) #REF! #REF! #REF! #REF! m3
3 Pekerjaan Pasangan batu kali Mortar Type N (1 PC : 4 PP) #REF! #REF! #REF! #REF! m3
4 Pekerjaan Pasangan batu kali Mortar Type O (1 PC : 4 PP) #REF! #REF! #REF! #REF! m3
5 Pekerjaan Pasangan batu kosong 156,000.00 15,600.00 31,200.00 202,800.00 m3
6 Pembuatan Dinding Penahan Tanah dari Batu kali #REF! #REF! #REF! #REF! m3
Pekerjaan Pengecatan
Pekerjaan Pengecatan Dinding Exterior 25,530.00 2,553.00 5,106.00 33,189.00 m2
Pekerjaan Pengecatan Interior 21,780.00 2,178.00 4,356.00 28,314.00 m2
Pekerjaan Pengecatan Kayu 18,089.00 1,808.90 3,617.80 23,515.70 m2
Pekerjaan Pengecatan Besi 18,167.50 1,816.75 3,633.50 23,617.75 m2
Pekerjaan Plumbing
Sistim suplai air Bersih - - - 50,000.00 m
Sistim Air Kotor - - - 150,000.00 m
Pompa Air dan kontrol 5,000,000.00 500,000.00 1,000,000.00 6,500,000.00 Unit Set
Pekerjaan Pemagaran
Pagar dan Gerbang 380,000.00 38,000.00 76,000.00 494,000.00 m2
IX PEKERJAAN ELEKTRIKAL
Generator Set untuk suplai listrik waktu pengerjaan proyek 7,500,000.00 unit
Jalur Distribusi 70 kV
Gardu Induk
Switchgear Tegangan Rendah
Sistim Lampu dan Elektrikal Auxilary Service
Sistim Alarm Kebakaran Otomatis
Sistim Pentanahan
Pekerjaan Perpipaan
1 Pemasangan Pipa SGP 4" Sebagai Encasement Pipe 60000 6,000.00 12,000.00 78,000.00 m
2 Pemasangan Pipa SGP 6" Sebagai Drain Pipe 65000 6,500.00 13,000.00 84,500.00 m
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita ok
Item Pekerjaan : Persiapan dan mobilisasi
1 Pembuatan BowPlank
Total Luasan Bowplank 750.00 m2
Biaya /m2 90,160.00 Rp/m2
Total Biaya Rp 67,620,000.00
5 Pembersihan Daerah
Area of project quarter 590.00 m2
Biaya /m2 6,041.89 Rp
Total Biaya Rp 3,564,712.88
6 Pekerjaan pemagaran
Luas daerah yang harus diamankan 150.00 m'
Biaya /m 116,725.00 Rp
Total Biaya Rp 17,508,750.00
TOTAL Rp 243,969,828.88
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Acces Road
1 Pekerjaan Tanah
a Pengupasan dan pembersihan Area Jalan PH
Perkiraan total luasan yang dibuat jalan 300 m2
Biaya /m2 Rp 9,684.27 Rp/m2
Total Biaya Rp 2,905,280.79
c Pagar pengaman di pinggir jalan = 30% dari total panjang 342.6 m'
Biaya / m Rp 260,000.00 Rp/m'
Total Biaya Rp 89,076,000
TOTAL #REF!
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Saluran Diversi dan Cofferdam Alternative 2
1 Pekerjaan Tanah
1.1 Pengupasan dan pembersihan Area
Perkiraan luas 3000 m2
Biaya /m2 Rp 9,684.27 Rp/m2
Total Biaya Rp 29,052,807.89
JUMLAH Rp 248,082,153.13
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Bendung
1 Pekerjaan Tanah
1.1 Pengupasan dan pembersihan Area
Perkiraan luas 483.52 m2
Biaya /m2 Rp 9,684.27 Rp/m2
Total Biaya Rp 4,682,537.89
JUMLAH #REF!
BILL OF QUANTITY
1 Pekerjaan Tanah
1.1 Pekerjaan Galian untk Konstruksi
Perkiraan volume galian 3374 m3
Biaya / m3 Rp 24,844.73
Total Biaya Rp 83,817,438.32
Rp 83,817,438.32
JUMLAH #REF!
BILL OF QUANTITY
Nama Proyek PLTMH Sakita
Item Pekerjaan Waterway
1 Pekerjaan Tanah
a Pengupasan dan pembersihan Area
Perkiraan Total Luas 6900 m2
Biaya /m2 9,684.27 Rp/m2
Total Biaya Rp 66,821,458.15
c Timbunan Sembarang
Volume Timbunan di sekitar desand 200 m3
Volume Timbunan di sekitar canal 1500 m3
Volume timbunan total 1700
Biaya / m3 18,159.75 Rp/m3
Total Biaya Rp 1,256,652,694.08 Rp 30,871,579.67
3 Pekerjaan Drainase
a Pekerjaan beton bertulang Kontruksi saluran
Pekerjaan beton massa struktural (K-125)
Panjang Total 738 m
Luas 0.1425 m2
Jumlah saluran 2
Total Volume Lean concrete 231.363 m3
Biaya /m3 Rp 737,772.68 Rp/m3
Total Biaya Rp 170,693,300.33
TOTAL #REF!
BILL OF QUANTITY
Nama Proyek PLTMH Sakita
Item Pekerjaan Head Pond
1 Pekerjaan Tanah
a Pengupasan dan pembersihan Area
Luas Area Headpond 454.60 m2
Biaya /m2 9,684.27 Rp/m2
Total Biaya Rp 4,402,468.82
TOTAL #REF!
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Penstock line
1 Pekerjaan Tanah
a Pembersihan dan pengupasan
Total luas yang harus dibersihkan 1,406.49
Biaya /m2 9,684.27
Total Biaya Rp 13,620,827.92
c Timbunan Sembarang
Volume Timbunan 1000
Biaya /m3 18,159.75
Total Biaya Rp 18,159,752.75
m2
Rp/m2
m3
Rp/m3
m3
Rp/m3
m
m2
m3
Rp/m3
72,117,195.43
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Power House
1 Pekerjaan Tanah
a Pembersihan dan pengupasan
Luas wilayah 350.00 m2
Biaya /m2 9,684.27 Rp/m2
Total Biaya Rp 3,389,494.25
c Timbunan Sembarang
Volume Timbunan 500.00 m3
Biaya /m3 18,159.75 Rp/m3
Total Biaya Rp 9,079,876.37
Alternative 2
a Pekerjaan Balok Baja
Berat Total Balok Baja 10,188.00 kg
Biaya / kg 26,891.43 Rp/kg
Total Biaya Rp 273,969,874.29
Alternative 3
a Pekerjaan Kolom Beton
Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 42.77 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!
6 Pekerjaan Lantai
Pekerjaan Beton Massa Struktural (K 175)
Volume beton m3
Biaya / m3 #REF! Rp/m3
Total Biaya #REF!
Pekerjaan Plesteran
Luas Area m2
Tebal m
Biaya / m2 23,510.34 Rp/m2
Total Biaya Rp -
Pekerjaan Keramik 30 x 30 cm
Luas Area m2
Biaya / m2 114,789.58 Rp/m2
Total Biaya Rp -
Pekerjaan Jendela
Jumlah Jendela
Biaya / m2
Total Biaya
Pekerjaan Kusen
Jumlah Kusen
Biaya / unit
Total Biaya
Architectural work
Estimated quantity
Biaya / unit
Total Biaya
TOTAL #REF!
BILL OF QUANTITY
Nama Proyek : Tamboli MHPP
Item Pekerjaan : Hydraulic Equipment
1 Trashrack
a Trashrack for intake structure (Coarse Screen)
Lebar 4.50
Tinggi 3.00
Total weight 1,589.63
Unit cost/m2 = 26,891.43
Total Cost Rp 42,747,287.14
2 Stoplog
a Stoplog in Intake
Lebar 1.20
Tinggi 1.20
Total weight 1,695.60
Number of Unit 2.00
Unit cost/ton 26,891.43
Total Cost Rp 91,194,212.57
b Stoplog in Sandtrap
Total weight of a stoplog 1,000.00
Number of Unit 1.00
Unit cost/ton 26,891.43
Total Cost Rp 30,925,142.86
3 Gate
a Sliding Gate in Intake
Total weight of a Gate 2250
Number of Unit 3.00
Unit cost/ton 29,491.43
Total Cost Rp 199,067,142.86
TOTAL Rp 751,532,584.06
unt
m
m
kg
Rp/kg
m
m
Rp/kg
pcs
Rp/kg
kg
pcs
Rp/kg
kg
pcs
Rp/kg
kg
pcs
Rp/kg
kg
pcs
1,532,584.06
PROJECT COST ESTIMATED
HYDRO ELECTRIC POWER PROJECT TAMBOLI
I DIRECT COST
1.1 CIVIL WORK
1.1.1 Persiapan dan mobilisasi 243,969,829 #REF!
1.1.2 Acces Road #REF! #REF!
1.1.3 River Diversion 248,082,153 #REF!
1.1.4 Weir #REF! #REF!
1.1.5 Intake and Sandtrap #REF! #REF!
1.1.6 Waterway #REF! #REF!
1.1.7 Headpond #REF! #REF!
1.1.8 Penstock 572,117,195 #REF!
1.1.9 Power House #REF! #REF!
SUB TOTAL 1.1 #REF! #REF!
II INDIRECT CONT
2.1 Land Acquisition 0 #REF!
2.2 Study & Desain #REF! #REF!
2.3 Engineering Service (10%) #REF! #REF!
2.4 Tax (10%) #REF! #REF!
2.5 Contingency #REF!
- Civil & Mechanical Work (10%) #REF! #REF!
- Generating Equipment (5%) 110,000,000 #REF!
Progess Summary: