Cost Estimation Project Hydropower

Analisa harga PLTA

Uploaded by

Wildan Hamdi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 68

BILL OF QUANTITY

&
COST ESTIMATION

PLTA ……. ( … X …MW)


HARGA-HARGA KOMPONEN DAN MATERIAL

Upah Pekerja

No Jabatan Unit Upah

1 Mandor /hari Rp.


2 Kepala Tukang /hari Rp.
3 Tukang Batu /hari Rp.
4 Tukang Kayu /hari Rp.
5 Tukang Besi /hari Rp.
6 Tukang Cat /hari Rp.
7 Tukang Las /hari Rp.
8 Tukang Listrik /hari Rp.
9 Tukang Pipa /hari Rp.
10 Pekerja /hari Rp.
11 Operator /hari Rp.

Harga Bahan Bangunan

Harga
No Item Unit Harga / Satuan
KETERANGAN

1 Semen (40 Kg) /zak Rp. Harga Kolaka agustus 2007


3 Pasir Pasang /m3 Rp. 60,000 Harga Kolaka agustus 2007
4 Pasir Urug /m3 Rp. 44,943 Harga Kolaka agustus 2007
5 Pasir Mundu /m3 Rp. 225,000 Harga Jakarta Mei 2008
6 Pasir Beton /m3 Rp. 100,000 Harga Jakarta Mei 2008
7 Pasir Kadipaten /m3 Rp. 180,000 Harga Jakarta Mei 2008
8 Tanah Urug /m3 Rp. 75,000 Harga Kolaka agustus 2007
9 Kapur Pasang zak Rp. 16,821 Harga Kolaka agustus 2007
10 Sirtu /m3 Rp. 125,000 Harga Kolaka agustus 2007
11 Split 1/2 /m3 Rp. 170,000
12 Split 2/3 /m3 Rp. 150,000
13 Split 6/8 /m3 Rp. 150,000
14 Split 5/7 /m3 Rp. 135,000
15 Batu Bronjol (untuk Bronjong) /m3 Rp. 125,000
16 Batu kali /m3 Rp. 130,000 Harga Kolaka agustus 2007
17 Batu bata /bh Rp. 950 Harga Kolaka agustus 2007
18 Paving Stone Block Abu2 /pcs Rp. 1,572 Harga Kolaka agustus 2007
19 Kayu Reng Untuk Tiang /m3 Rp. 400,000 Harga Kolaka agustus 2007
20 Papan /m3 Rp. 600,000 Harga Kolaka agustus 2007
21 Kerikil /m3 Rp. 90,000 Harga Kolaka agustus 2007
22 Rock bolt /kg Rp. 4,000 Harga Kolaka agustus 2007
23 Wire mesh /kg Rp. 4,300 Harga Kolaka agustus 2007
24 Solar Industri lt Rp. 7,500 Harga Sakita Agustus 2008
25 Kawat Beton ø3mm kg Rp. 15,000 Harga Kolaka agustus 2007
26 Kawat Bronjong Ø= 6 mm kg Rp. 21,000 Harga Kolaka agustus 2007
27 Kawat Bronjong Ø= 8 mm kg Rp. 25,000 Harga Kolaka agustus 2007
28 Kawat Bronjong Ø= 10 mm kg Rp. 30,000 Harga Kolaka agustus 2007
29 Papan btg Rp. 692,400 Harga Kolaka agustus 2007
30 Besi Beton Polos Ø= 8 mm kg Rp. 9,450 Harga Jakarta Mei 2008
31 Besi Beton Polos Ø=10 mm kg Rp. 9,450 Harga Jakarta Mei 2008
32 Besi Beton Polos Ø=12 mm kg Rp. 9,450 Harga Jakarta Mei 2008
33 Besi Beton Polos Ø=16 mm kg Rp. 9,700 Harga Jakarta Mei 2008
34 Besi Beton Polos Ø=32 mm kg Rp. 9,700 Harga Jakarta Mei 2008

Peralatan

No Item Unit Biaya

1 Concrete Mixer /jam Rp. 11,900


2 Concrete Vibrator /jam Rp. 25,000
3 Water Pump /jam Rp. 25,000
4 Ponton /hari Rp. 1,000,000
5 Tug Boat /hari Rp. 5,000,000
6 Roller /hari Rp. 1,000,000
7 Dump truck 4 ton /jam Rp. 75,000
8 Bulldozer DBea BBM /jam Rp. 310,000
9 Excavator LB PC 200 /jam Rp. 325,000 Harga agustus 2008 plus BBM
10 Crane on track /jam Rp. 132,000
11 Motor Grader /jam Rp. 500,000 Harga agustus 2008 plus BBM
12 Pneumatic Tire Roller /jam Rp. 54,800
13 Truk Tangki Air /jam Rp. 40,700
14 Vibrated roller (30 ton) /jam Rp. 200,000 Harga agustus 2008 plus BBM
HARGA DASAR
HARGA
JENIS BAHAN
PER VOLUME PER RIT HARGA PER RIT
SATUAN

1 Tanah urugan biasa 3.80 M3 -


2 Tanah urugan pilihan 3.80 M3 -
3 Pasir Beton 3.80 M3 -
4 Pasir Urug 3.80 M3 -
5 Batu Muda M3 -
6 Batu ukuran 10,0 - 15,0 cm 3.00 M3 -
7 Batu ukuran 5,0 - 7,0 cm 3.00 M3 -
8 Batu ukuran 3,0 - 5,0 cm 3.00 M3 -
9 Batu ukuran 2,0 - 3,0 cm 3.00 M3 -
10 Batu ukuran 1,0 - 2,0 cm 3.00 M3 -
11 Batu ukuran 0,5 - 1,0 cm 3.00 M3 -
12 Debu Batu 3.50 M3 -
13 S i r t u 3.50 M3 -

Semen 100.00 Zk 38,250.0


5,000 Kg

Kerosen / Minyak Tanah 2,040.0


Solar 8000 8,160.0
Bensin 6500 6,630.0
Pelumas 17000 17,340.0

Aspal Drum 25.00 Drm 630,000.0


3,750 Kg -
4,200.0
Aspal curah Ton 2,487,500.0

JENIS BAHAN VOLUME PER HARGA PER


RIT SATUAN

Papan Kayu belian M3 2,679,600.0


Balok Kayu belian M3 2,142,000.0
Kayu klas II M3 922,800.0
Kayu cerucuk dia 10/15-400 cm 500.00 Btg 9,000.0
Kayu cerucuk dia 15/20-400 cm 500.00 Btg 13,200.0
Kayu bakar M3 33,000.0
Beugel 2,000 BH 20,000.0
B o u t 2,000 BH 4,260.0
Paku ( segala ukuran ) 5,000 KG 10,320.0
Pipa Galvanis dia. 1 " M' 30,240.0
Pipa Galvanis dia. 2 "
Pipa Galvanis dia. 4 "
Besi siku ukuran 80.80.8
Besi Beton 5,600.00 Kg 9,060.0
Bindrat 5,000.00 Kg 12,060.0
Kawat Bronjong 5,000.00 Kg 9,660.0
Cat tembok 5,000.00 Kg 8,640.0
Cat kilat 5,000.00 Kg 24,240.0
Cat dasar 5,000.00 Kg 18,240.0
Cat Marka Jalan
Tinner Ltr 6,500.0

JENIS BAHAN VOLUME PER HARGA PER


RIT SATUAN

Agregat untuk hot-mix :


Pasir Beton 3.80 M3 #REF!
Batu ukuran 3,0 - 5,0 cm 3.50 M3 #REF!
Batu ukuran 2,0 - 3,0 cm 3.50 M3 #REF!
Batu ukuran 1,0 - 2,0 cm 3.50 M3 #REF!
Batu ukuran 0,5 - 1,0 cm 3.50 M3 #REF!
Debu Batu 3.50 M3 #REF!
Semen 100.00 Zak #REF!

Aspal 25.00 Drm 630,000.0


3,750 Kg
HARGA SAMPAI LOKASI
JARAK ANGKUT ( KM )
ANGKUTAN / RIT PANJ
JARAK
PENA-
RATA2
NGANAN

ASUMSI : 10.00 5.00


Sebagai dasar biaya angkutan material digunakan 3.00 1.50
biaya angkutan dari quarry - lokasi ( 20 Km ) : 0.05 0.03
3.00 1.50
- Total biaya / rit = Rp. 125,000.0
3.00 1.50
- Vol / rit ( M3 ) = 3.50 16.00 8.00
( Kg ) = 5,600.00 16.00 8.00
16.00 8.00
- Jarak angkut (Km) ( Km ) = 20.00 16.00 8.00
16.00 8.00
- Biaya / M3 / Km = Rp. 1,785.71 16.00 8.00
- Biaya / Kg / Km = Rp. 1.12 3.00 1.50
PERHITUNGAN BIAYA ANGKUT / ZAK / KM
( dari toko ke lokasi proyek )
- Biaya angkut / Kg / Km = 1.12 0.05 0.03
- Biaya angkut / Zak / Km = Rp. 56.00
- Biaya bongkar / Zak = Rp. 250.00
3.00 1.50
Biaya angkut / Km / Ltr = Rp. 1.10 3.00 1.50
3.00 1.50
3.00 1.50
PERHITUNGAN BIAYA ANGKUT / DRUM / KM
( dari toko ke lokasi proyek )
- Biaya angkut / Kg / Km = 1.12
Biaya angkut / drum / km = Rp. 100.00 3.00 1.50
- Biaya bongkar / drum = Rp. 500.00

HARGA SAMPAI LOKASI


JARAK ANGKUT ( KM )
ANGKUTAN / RIT PANJ
JARAK
PENA-
RATA2
NGANAN

0.05 0.03
0.05 0.03
0.05 0.03
Biaya angkut / btg / Km = Rp. 12.50 0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03
0.05 0.03

0.05 0.03
Biaya angkut / Kg / Km = Rp. 1.12 0.05 0.03
0.05 0.03
3.00 1.50
3.00 1.50
3.00 1.50

3.00 1.50

HARGA SAMPAI LOKASI


JARAK ANGKUT ( KM )
ANGKUTAN / RIT PANJ
JARAK
PENA-
RATA2
NGANAN

Sebagai dasar biaya angkutan material digunakan - -


biaya angkutan dari Peniraman - Pontianak : - -
- Total biaya / rit = Rp. 125,000.0 - -
- Vol / rit ( M3 ) = 3.50 - -
- Jarak angkut (Km) ( Km ) = 43.00 - -
- Biaya / M3 / Km = Rp. 830.60
Biaya angkut / Zak / Km = Rp. 56.00 - -
Biaya bongkar / Zak = Rp. 250.00

Biaya angkut / drum / Km = Rp. 100.00 1.50 0.75


Biaya bongkar / Drum = Rp. 500.00
HARGA SAMPAI LOKASI BIAYA TOTAL HARGA
JARAK ANGKUT ( KM ) BIAYA
RETRI- SAMPAI LOKASI
ANGKUT,
QUARRY - TOTAL BUSI
DLL
PROYEK JARAK (Rp) (Rp)
(Rp)

3.00 8.00 - 1,000 1,000.00


17.00 18.50 - 1,000 1,000.00
15.00 15.03 - 2,000 2,000.00
28.00 29.50 - 2,000 2,000.00

34.00 35.50 - 2,500 2,500.00


34.00 42.00 - 2,500 2,500.00
34.00 42.00 - 2,500 2,500.00
34.00 42.00 - 2,500 2,500.00
34.00 42.00 - 2,500 2,500.00
34.00 42.00 - 2,500 2,500.00
34.00 42.00 - 2,500 2,500.00
20.00 21.50 - 2,500 2,500.00

97.00 97.03 5,434.00 - 43,900.00


878.00

97.00 98.50 - - 2,000.00


97.00 98.50 - - 8,200.00
97.00 98.50 - - 6,600.00
97.00 98.50 - - 17,300.00

28.00 29.50 3,450.00 - 633,500.00


4,220.00

2,900,000.00
2,900.00

Hal = 02 / 03
HARGA SAMPAI LOKASI BIAYA TOTAL HARGA
JARAK ANGKUT ( KM ) BIAYA RETRI- SAMPAI LOKASI
QUARRY - TOTAL ANGKUT BUSI
PROYEK JARAK (Rp) (Rp) (Rp)

97.00 97.03 - - 2,679,600.00


97.00 97.03 - - 2,142,000.00
97.00 97.03 - - 922,800.00
97.00 97.03 - - 9,000.00
97.00 97.03 - - 13,200.00
97.00 97.03 - - 33,000.00
97.00 97.03 - - 20,000.00
97.00 97.03 - - 4,300.00
97.00 97.03 ### - 58,800.00
97.00 97.03 - - 30,200.00

28.00 28.03 - - 9,100.00


28.00 28.03 - - 12,100.00
28.00 28.03 - - 9,700.00
28.00 29.50 - - 8,600.00
28.00 29.50 - - 24,200.00
28.00 29.50 - - 18,200.00
50,000.00
28.00 29.50 - - 6,500.00

Hal = 03 / 03
HARGA SAMPAI LOKASI BIAYA TOTAL HARGA
JARAK ANGKUT ( KM ) BIAYA RETRI- SAMPAI LOKASI
QUARRY - TOTAL ANGKUT, BUSI
AMP JARAK DLL (Rp) (Rp) (Rp)

50.50 50.50 ### 2,000.00 #REF!


13.50 13.50 3,375.00 2,500.00 #REF!
13.50 13.50 3,375.00 2,500.00 #REF!
13.50 13.50 3,375.00 2,500.00 #REF!
13.50 13.50 3,375.00 2,500.00 #REF!
13.50 13.50 3,375.00 2,500.00 #REF!
40.22 40.22 2,502.00 - #REF!
#REF!

22.00 22.00 2,700.00 - 632,700.00


4,218.00
URAIAN ANALISA HARGA SATUAN PEKERJAAN SUNGAI

1 Pekerjaan Membuat Cofferdam m3


Upah Pekerja :
0.1400 hari Mandor @Rp - =Rp -
1.0160 hari Pekerja @Rp - =Rp -
0.4000 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
1.2000 m3 Batu Kali @Rp 130,000 =Rp 156,000
0.1000 m3 Kayu @Rp 500,000 =Rp 50,000
Sub total Bahan =Rp 206,000

Grand Total = Rp 206,000

2 Pekerjaan Bongkar cofferdam m3


Upah Pekerja :
0.0250 hari Mandor @Rp - =Rp -
0.5000 hari Pekerja @Rp - =Rp -
Sub total Upah =Rp -

Grand Total = Rp -

3 Pekerjaan Pengeringan Sungai LS

Grand Total = Rp 50,000,000

URAIAN ANALISA HARGA SATUAN PEKERJAAN TANAH

1 Pembersihan dan pengupasan m2

Biaya yang utama : Biaya pemakaian alat berat


Peralatan berat yang dipakai adalah back hoe PC 200 long boom dan dumptrucks
Back hoe PC 200 long boom
- Kapasitas Bucket : 0.70 m3
- Productivity of undisturbed soil : 38.26 m3/hour
- Soil swelling factor : 1.50
- Produktivitas dari swelled soil : 57.39 m3/hour
- Jumlah back hoe 2.00 unit

Dump truck class 10 ton


- Kapasitas Bak Truk : 4.00 m3
- Produktivitas : 14.75 m3/hour
- Jumlah truck : 3.89
Dipakai : 4 units of truck

Biaya Operasional Peralatan


- Biaya operasional back hoe : 325,000 Rp/hour
- Biaya Operasional dump truck : 75,000 Rp/hour
- Biaya Operasional team work : 950,000 Rp/hour
- Equipment operation cost : 24,831 Rp/m3
equivalent to : 7,449 Rp/ (max. stripping thicknes =
0.3 m

Grand Total =Rp 7,449

2 Galian terbuka pada tanah biasa m3

ASUMSI
Dilaksanakan untuk galian di tanah yang biasa
Lokasi pekerjaan = Powerhouse, penstock, headpond,waterway,bendung
Kondisi Jalan = sedang - baik
Jam kerja efektif per-hari Tk 10.00 Jam
Faktor pengembangan bahan Fk 1.00 -
Hasil galian dibuang , dengan jarak rata-rata L 0.50 Km

METHODE PELAKSANAAN
1 Tanah digali sesuai rencana yang telah ditetapkan menggunakan Excavator
2 Hasil galian dibuang di disposal pada lokasi yang aman dan tidak mengganggu dan sebagian dibuang ke lokasi lain dengan menggunakan Dump Truck.
3 Sekelompok pekerja merapikan hasil galian , sehingga didapatkan permukaan hasil galian sesuai rencana.

PEMAKAIAN BAHAN, ALAT DAN TENAGA


a ALAT
EXCAVATOR
Kapasitas bucket V 0.7 m3
Faktor bucket Fb 0.8 -
Faktor Efisiensi alat Fa 0.78 -
Waktu Siklus
- Menggali T1 0.25 menit
- Mengisi / membuang T2 0.25 menit
- Lain-lain (manuver, dll) T2 0.5 menit
Ts1 1 menit

Kap. Produksi / jam ( V x Fb x Fa x 60 ) : ( Fk x Ts1 ) Q1 26.21 M3


Koefisien Alat / M3 1 : Q1 0.0382 Jam

DUMP TRUCK
Kapasitas bak V 4.00 m3
Faktor Efisiensi alat Fa 0.78 -
Kecepatan rata-rata bermuatan v1 30.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
- Muat T1 9.16 menit
- Waktu tempuh isi T2 1.00 menit
- Waktu tempuh kosong T3 0.60 menit
- Lain-lain (tunggu , putar , dll) T4 1.00 menit
11.76 menit

Kap. Produksi / jam ( V x Fa x 60 ) : ( Fk x Ts2 ) Q2 15.92 m3


Koefisien Alat / M3 1 : Q2 0.0628 jam

ALAT BANTU
Diperlukan alat-alat Cangkul , pungki , belincong , dll 1 LS

b TENAGA KERJA
Produksi yang menentukan =EXCAVATOR
Produksi / jam Q1 26.21 m3/jam
Produksi / hari = Tk x Q4 Qt 101.97 m3

Kebutuhan tenaga - Pekerja P 2.00 orang


- Mandor M 0.20 orang

Koef tenaga / M3 - Pekerja = (Tk x P ) : Qt - 0.0763 Jam


- Mandor = ( Tk x M ) : Qt - 0.0076 Jam

ANALISA HARGA SATUAN PEKERJAAN

Upah Pekerja
0.0763 jam Pekerja @Rp 0 =Rp 0
0.0076 jam Mandor @Rp 0 =Rp 0
Sub total Upah =Rp 0
Alat2
0.038 jam Excavator @Rp 325,000 =Rp 12,401
0.063 jam Dump Truck @Rp 75,000 =Rp 4,711
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat 19,111

Grand Total =Rp 19,111.33

3 Galian terbuka pada tanah keras m3

ASUMSI
Dilaksanakan untuk galian di tanah yang banyak batunya
Lokasi pekerjaan
Kondisi Jalan = sedang - baik
Jam kerja efektif per-hari Tk 10.00 Jam
Faktor pengembangan bahan Fk 1.22 -
Hasil galian dibuang , dengan jarak rata-rata L 0.50 Km

METHODE PELAKSANAAN
Tanah digali sesuai rencana yang telah ditetapkan menggunakan Excavator
Hasil galian dibuang di disposal pada lokasi yang aman dan tidak mengganggu dan sebagian dibuang ke lokasi lain dengan menggunakan Dump Truck.
Sekelompok pekerja merapikan hasil galian , sehingga didapatkan permukaan hasil galian sesuai rencana.

PEMAKAIAN BAHAN, ALAT DAN TENAGA


ALAT
EXCAVATOR
Kapasitas bucket V 0.7 m3
Faktor bucket Fb 0.6 -
Faktor Efisiensi alat Fa 0.78 -
Waktu Siklus
- Menggali T1 0.45 menit
- Mengisi / membuang T2 0.35 menit
- Lain-lain (manuver, dll) T2 0.5 menit
Ts1 1.3 menit

Kap. Produksi / jam ( V x Fb x Fa x 60 ) : ( Fk x Ts1 ) Q1 12.39 M3


Koefisien Alat / M3 1 : Q1 0.0807 Jam

DUMP TRUCK
Kapasitas bak V 4.00 m3
Faktor Efisiensi alat Fa 0.78 -
Kecepatan rata-rata bermuatan v1 40.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
- Muat T1 19.37 menit
- Waktu tempuh isi T2 0.75 menit
- Waktu tempuh kosong T3 0.60 menit
- Lain-lain (tunggu , putar , dll) T4 1.00 menit
21.72 menit

b Kap. Produksi / jam ( V x Fa x 60 ) : ( Fk x Ts2 ) Q2 7.07 m3


Koefisien Alat / M3 1 : Q2 0.1415 jam

ALAT BANTU
Diperlukan alat-alat Cangkul , pungki , belincong , dll 1 LS

TENAGA KERJA
Produksi yang menentukan =EXCAVATOR
Produksi / jam Q1 12.39 m3/jam
Produksi / hari = Tk x Q4 Qt 123.93 m3

Kebutuhan tenaga - Pekerja P 2.00 orang


- Mandor M 0.20 orang

Koef tenaga / M3 - Pekerja = (Tk x P ) : Qt - 0.1614 Jam


- Mandor = ( Tk x M ) : Qt - 0.0161 Jam

ANALISA HARGA SATUAN PEKERJAAN

Upah Pekerja
0.1614 jam Pekerja @Rp 0 =Rp 0
0.0161 jam Mandor @Rp 0 =Rp 0
Sub total Upah =Rp 0
Alat2
0.081 jam Excavator @Rp 325,000 =Rp 26,224
0.142 jam Dump Truck @Rp 75,000 =Rp 10,614
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat 38,837

Grand Total =Rp 38,837.49

4 Galian terbuka pada tanah endapan sungai m3

ASUMSI
Dilaksanakan untuk galian di tanah endapan sungai
Lokasi pekerjaan = bendung, diversi
Kondisi Jalan = sedang - baik
Jam kerja efektif per-hari Tk 10.00 Jam
Faktor pengembangan bahan Fk 0.70 -
Hasil galian dibuang , dengan jarak rata-rata L 0.50 Km

METHODE PELAKSANAAN
1 Tanah digali sesuai rencana yang telah ditetapkan menggunakan Excavator
2 Hasil galian dibuang di disposal pada lokasi yang aman dan tidak mengganggu dan sebagian dibuang ke lokasi lain dengan menggunakan Dump Truck.
3 Sekelompok pekerja merapikan hasil galian , sehingga didapatkan permukaan hasil galian sesuai rencana.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
a. ALAT
EXCAVATOR
Kapasitas bucket V 0.7 m3
Faktor bucket Fb 0.8 -
Faktor Efisiensi alat Fa 0.78 -
Waktu Siklus
- Menggali T1 0.25 menit
- Mengisi / membuang T2 0.25 menit
- Lain-lain (manuver, dll) T2 0.5 menit
Ts1 1 menit

Kap. Produksi / jam ( V x Fb x Fa x 60 ) : ( Fk x Ts1 ) Q1 37.44 m3 / jam


Kap Produksi / hari 374.40 m3 / hari
Koefisien Alat / M3 1 : Q1 0.0267 Jam

DUMP TRUCK
Kapasitas bak V 4.00 m3
Faktor Efisiensi alat Fa 0.78 -
Kecepatan rata-rata bermuatan v1 30.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
- Muat T1 6.41 menit
- Waktu tempuh isi T2 1.00 menit
- Waktu tempuh kosong T3 0.60 menit
- Lain-lain (tunggu , putar , dll) T4 1.00 menit
9.01 menit

Kap. Produksi / jam ( V x Fa x 60 ) : ( Fk x Ts2 ) Q2 29.68 m3


Koefisien Alat / M3 1 : Q2 0.0337 jam

ALAT BANTU
Diperlukan alat-alat Cangkul , pungki , belincong , dll 1 LS

b TENAGA KERJA
Produksi yang menentukan =EXCAVATOR
Produksi / jam Q1 37.44 m3/jam
Produksi / hari = Tk x Q4 Qt 374.40 m3

Kebutuhan tenaga - Pekerja P 2.00 orang


- Mandor M 0.20 orang

Koef tenaga / M3 - Pekerja = (Tk x P ) : Qt - 0.5342 Jam


- Mandor = ( Tk x M ) : Qt - 0.0534 Jam

ANALISA HARGA SATUAN PEKERJAAN

Upah Pekerja
0.5342 jam Pekerja @Rp 0 =Rp 0
0.0534 jam Mandor @Rp 0 =Rp 0
Sub total Upah =Rp 0
Alat2
0.027 jam Excavator @Rp 325,000 =Rp 8,681
0.034 jam Dump Truck @Rp 75,000 =Rp 2,527
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat 13,207

Grand Total =Rp 13,207.47

5 Pekerjaan Timbunan Sembarang m3

ASUMSI
Dilaksanakan untuk timbunan dengan tanah yang biasa
Lokasi pekerjaan = Powerhouse, penstock, headpond,waterway,bendung
Kondisi Jalan = sedang - baik
Jam kerja efektif per-hari Tk 10.00 Jam
Faktor pengembangan bahan Fk 1.00 -
Timbunan diambil dari disposal, dengan jarak rata-rata L 0.50 Km

METHODE PELAKSANAAN
1 Tanah diambil dari disposal dengan menggunakan Excavator
2 Tanah timbunan dibawa ke lokasi dengan menggunakan Dump Truck.
3 Sekelompok pekerja merapikan hasil timbunan , sehingga didapatkan permukaan hasil yang sesuai rencana.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
a ALAT
EXCAVATOR
Kapasitas bucket V 0.7 m3
Faktor bucket Fb 1 -
Faktor Efisiensi alat Fa 0.78 -
Waktu Siklus
- Menggali T1 0.15 menit
- Mengisi / membuang T2 0.2 menit
- Lain-lain (manuver, dll) T2 0.5 menit
Ts1 0.85 menit

Kap. Produksi / jam ( V x Fb x Fa x 60 ) : ( Fk x Ts1 ) Q1 38.54 M3


Koefisien Alat / M3 1 : Q1 0.0259 Jam

DUMP TRUCK
Kapasitas bak V 4.00 m3
Faktor Efisiensi alat Fa 0.78 -
Kecepatan rata-rata bermuatan v1 30.00 KM/jam
Kecepatan rata-rata kosong v2 50.00 KM/jam
- Muat T1 6.23 menit
- Waktu tempuh isi T2 1.00 menit
- Waktu tempuh kosong T3 0.60 menit
- Lain-lain (tunggu , putar , dll) T4 1.00 menit
8.83 menit

Kap. Produksi / jam ( V x Fa x 60 ) : ( Fk x Ts2 ) Q2 21.21 m3


Koefisien Alat / M3 1 : Q2 0.0472 jam

ALAT BANTU
Diperlukan alat-alat Cangkul , pungki , belincong , dll 1 LS

b TENAGA KERJA
Produksi yang menentukan =EXCAVATOR
Produksi / jam Q1 38.54 m3/jam
Produksi / hari = Tk x Q4 Qt 385.41 m3 / hari

Kebutuhan tenaga - Pekerja P 2.00 orang


- Mandor M 0.20 orang

Koef tenaga / M3 - Pekerja = (Tk x P ) : Qt - 0.0519 Jam


- Mandor = ( Tk x M ) : Qt - 0.0052 Jam

ANALISA HARGA SATUAN PEKERJAAN

Upah Pekerja
0.0519 jam Pekerja @Rp 0 =Rp 0
0.0052 jam Mandor @Rp 0 =Rp 0
Sub total Upah =Rp 0
Alat2
0.026 jam Excavator @Rp 325,000 =Rp 8,433
0.047 jam Dump Truck @Rp 75,000 =Rp 3,537
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat 13,969

Grand Total =Rp 13,969.04

6 Pekerjaan Pengurugan Tanah dengan pemadatan m3


Upah Pekerja
0.05 hari Mandor @Rp 0 =Rp 0
0.25 hari Pekerja @Rp 0 =Rp 0
Sub total Upah =Rp 0

Bahan-bahan
1.2 m3 Tanah Urug @Rp 75,000 =Rp 90,000
Sub total Bahan =Rp 90,000
Alat-Alat
0.02125 jam Alat bantu @Rp 1,000,000 =Rp 21,250
Sub total Alat =Rp 21,250

Grand Total = Rp 111,250


7 Pekerjaan Urugan Clay Soil m3
Upah Pekerja :
1.000 ls Urug/meratakan @Rp 10,000 = Rp 10,000
1.000 ls Memadatkan @Rp 15,000 = Rp 15,000
Sub total Pekerja = Rp 25,000
Bahan-bahan
1.200 m3 Pasir Urug @Rp 40,000 = Rp 48,000
Sub total Bahan = Rp 48,000
Alat-alat
1.000 ls Alat bantu @Rp 1,500 = Rp 1,500
Sub total Alat = Rp 1,500

Grand Total = Rp 74,500


URAIAN ANALISA HARGA SATUAN PEKERJAAN SIPIL

PEKERJAAN BETON

1 Pekerjaan Pembuatan Rabatan Beton (Lean Concrete ) m3


Upah Pekerja :
0.020 hari Mandor @Rp - =Rp -
0.400 hari Pekerja @Rp - =Rp -
0.020 hari Kepala tukang @Rp - =Rp -
0.200 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
0.200 zak Semen PC Bosowa @Rp #REF! =Rp #REF!
0.055 m3 Pasir pasang @Rp 60,000 =Rp 3,300
Sub total Bahan =Rp #REF!
Alat :
0.500 jam Concrete Mixer @Rp 11,900 =Rp 5,950
0.499 jam Concrete Vibrator @Rp 25,000 =Rp 12,475
0.200 jam Water Pump @Rp 25,000 =Rp 5,000
1.000 ls Alat Bantu (sekop, Gerobak) @Rp 5,000 =Rp 5,000
Sub Total Alat =Rp 28,425

Grand Total = Rp #REF!

2 Beton (K125) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
5.200 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061

Grand Total = Rp #REF!

3 Beton (K175) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
6.400 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061

Grand Total = Rp #REF!


4 Beton (K225) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
7.008 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061

Grand Total = Rp #REF!

5 Beton (K250) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
7.500 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061

Grand Total = Rp #REF!

6 Beton (K300) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
8.000 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Concrete Vibrator @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061

Grand Total = Rp #REF!


7 Beton (K350) (1Pc : 1.5Ps : 2.5 Kr) m3
Upah Pekerja :
1.090 hari Mandor @Rp - =Rp -
7.547 hari Pekerja @Rp - =Rp -
1.500 hari Tukang batu @Rp - =Rp -
Sub total Upah =Rp -

Bahan-bahan :
8.500 zak Semen PC @Rp #REF! =Rp #REF!
0.330 m3 Pasir pasang @Rp 60,000 =Rp 19,800
0.770 m3 Kerikil @Rp 90,000 =Rp 69,300
Sub total Bahan =Rp #REF!
Alat :
0.943 jam Concrete Mixer @Rp 11,900 =Rp 11,226
0.943 jam Vibrator Roller @Rp 25,000 =Rp 23,585
0.250 jam Water Pump @Rp 25,000 =Rp 6,250
1.000 jam Alat Bantu @Rp 3,000 =Rp 3,000
Sub Total Alat =Rp 44,061

Grand Total =Rp #REF!

8 Pembongkaran Cetakan dan Penyiraman Beton m3


Upah Pekerja :
3.000 hari Pekerja @Rp - =Rp -

Grand Total =Rp -

9 Pekerjaan Bekisting Kolom Sederhana


0.250 m3 Acuan Untuk Beton Struktur @Rp 293,122 =Rp 73,280

Grand Total =Rp 73,280

10 Pekerjaan Pembesian Pemakaian Besi 12 mm kg


Upah Pekerja :
0.049 hari Pekerja @Rp - =Rp -
0.049 hari Tukang Besi @Rp - =Rp -
0.016 hari Kepala Tukang @Rp - =Rp -
Sub total Upah =Rp -

Bahan-bahan :
1.125 kg Besi Beton Polos @Rp 9,450 =Rp 10,631
0.020 kg Kawat Ikat Beton diameter 3 mm @Rp 15,000 =Rp 306
Sub total Bahan =Rp 10,937

Grand Total =Rp 10,937

11 Pekerjaan Pembesian Pemakaian Besi 20 mm kg


Upah Pekerja :
0.049 hari Pekerja @Rp - =Rp -
0.049 hari Tukang Besi @Rp - =Rp -
0.016 hari Kepala Tukang @Rp - =Rp -
Sub total Upah =Rp -

Bahan-bahan :
1.125 kg Besi Beton Polos @Rp 9,700 =Rp 10,913
0.020 kg Kawat Ikat Beton diameter 3 mm @Rp 15,000 =Rp 306
Sub total Bahan =Rp 11,219

Grand Total =Rp 11,219

12 Pekerjaan Pembesian Pemakaian Wire Mesh kg


Upah Pekerja :
0.049 hari Pekerja @Rp - =Rp -
0.049 hari Tukang Besi @Rp - =Rp -
0.016 hari Kepala Tukang @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
1.000 kg Kawat Ikat Beton diameter 3 mm @Rp 15,000 =Rp 15,000
Sub total Bahan =Rp 15,000

Grand Total =Rp 15,000


PEKERJAAN PASANGAN
1 Pekerjaan Pasangan batu kali Mortar Type M (1 PC : 2 PP) m3
Upah Pekerja :
0.015 hari Mandor @Rp - =Rp -
1.500 hari Pekerja @Rp - =Rp -
0.600 hari Tukang batu @Rp - =Rp -
0.060 hari Kepala Tukang @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
1.200 m3 Batu kali @Rp 130,000 =Rp 156,000
3.740 zak Semen @Rp #REF! =Rp #REF!
0.340 m3 Pasir Pasang @Rp 60,000 =Rp 20,400
Sub total Bahan =Rp #REF!

Grand Total =Rp #REF!

2 Pekerjaan Pasangan batu kali Mortar Type S (1 PC : 3 PP) m3


Upah Pekerja :
0.015 hari Mandor @Rp - =Rp -
1.500 hari Pekerja @Rp - =Rp -
0.600 hari Tukang batu @Rp - =Rp -
0.060 hari Kepala Tukang @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
1.200 m3 Batu kali @Rp 130,000 =Rp 156,000
2.800 zak Semen @Rp #REF! =Rp #REF!
0.380 m3 Pasir Pasang @Rp 60,000 =Rp 22,800
Sub total Bahan =Rp #REF!

Grand Total =Rp #REF!

30 Pekerjaan Pasangan batu kali Mortar Type N (1 PC : 4 PP) m3


Upah Pekerja :
0.015 hari Mandor @Rp - =Rp -
1.500 hari Pekerja @Rp - =Rp -
0.600 hari Tukang batu @Rp - =Rp -
0.060 hari Kepala Tukang @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
1.200 m3 Batu kali @Rp 130,000 =Rp 156,000
2.250 zak Semen @Rp #REF! =Rp #REF!
0.410 m3 Pasir Pasang @Rp 60,000 =Rp 24,600
Sub total Bahan =Rp #REF!

Grand Total =Rp #REF!

31 Pekerjaan Pasangan batu kali Mortar Type O (1 PC : 4 PP) m3


Upah Pekerja :
0.015 hari Mandor @Rp - =Rp -
1.500 hari Pekerja @Rp - =Rp -
0.600 hari Tukang batu @Rp - =Rp -
0.060 hari Kepala Tukang @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
1.200 m3 Batu kali @Rp 130,000 =Rp 156,000
1.980 zak Semen @Rp #REF! =Rp #REF!
0.450 m3 Pasir Pasang @Rp 60,000 =Rp 27,000
Sub total Bahan =Rp #REF!

Grand Total =Rp #REF!

32 Pekerjaan Pasangan batu kosong m3


Upah Pekerja :
0.078 hari Mandor @Rp - =Rp -
0.781 hari Pekerja @Rp - =Rp -
0.039 hari Kepala Tukang Batu @Rp - =Rp -
0.390 hari Tukang Batu @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan :
1.200 m3 Batu Kosong @Rp 130,000 =Rp 156,000
Sub total Bahan =Rp 156,000

Grand Total =Rp 156,000

33 Pembuatan Dinding Penahan Tanah dari Batu Kali m3


Upah Pekerja :
0.300 hari Mandor @Rp - =Rp -
0.900 hari Pekerja @Rp - =Rp -
Sub total Upah =Rp -
Bahan-bahan
1.000 m3 Batu kali @Rp 130,000 =Rp 130,000
0.800 zak Semen PC @Rp #REF! =Rp #REF!
0.450 m3 Pasir @Rp 60,000 =Rp 27,000
Sub total Bahan =Rp #REF!

Grand Total =Rp #REF!


PEKERJAAN DRAINASE

Pemasangan Pipa SGP 4" Sebagai Encasement Pipe m3


Upah Pekerja :
0.015 hari Pekerja @Rp - =Rp -
0.001 hari Mandor @Rp - =Rp -
0.008 hari Kepala Tukang Batu @Rp - =Rp -
0.008 hari Tukang Batu @Rp - =Rp -
Sub total Upah =Rp -

Bahan-bahan :
0.500 kg Ijuk @Rp 20,000 =Rp 10,000
1.000 m Pipa SGP 4" @Rp 50,000 =Rp 50,000
Sub total Bahan =Rp 60,000

Grand Total =Rp 60,000

Pemasangan Pipa SGP 6" Sebagai Drain Pipe m3


Upah Pekerja :
0.015 hari Pekerja @Rp - =Rp -
0.001 hari Mandor @Rp - =Rp -
0.008 hari Kepala Tukang Batu @Rp - =Rp -
0.008 hari Tukang Batu @Rp - =Rp -
Sub total Upah =Rp -

Bahan-bahan :
0.500 kg Ijuk @Rp 20,000 =Rp 10,000
1.000 m Pipa SGP 6" @Rp 55,000 =Rp 55,000
Sub total Bahan =Rp 65,000

Grand Total =Rp 65,000

URAIAN ANALISA HARGA SATUAN PEKERJAAN LOGAM

PEKERJAAN LOGAM

1 Pekerjaan Struktur Baja SS 400 kg


Jasa :
1.000 ls Erection @Rp 1,500 = Rp 1,500
1.000 ls Packing & Transport @Rp 750 = Rp 750
1.000 ls Alat & Equipment @Rp 750 = Rp 750
Sub total Jasa =Rp 3,000
Fabrikasi :
1.000 ls Cutting n boring @Rp 600 = Rp 600
1.000 ls Welding @Rp 1,200 = Rp 1,200
1.000 ls Painting @Rp 850 = Rp 850
Sub total Fabrikasi = Rp 2,650
Material :
1.002 kg Profil Baja @Rp 15,000 = Rp 15,036
Sub total Material =Rp 15,036

Grand Total = Rp 20,686

2 Pekerjaan Pembuatan Steel welded Penstock (material SM 50) kg


Jasa :
1.0000 ls Erection @Rp 1,500 = Rp 1,500
1.0000 ls Packing & Transport @Rp 750 = Rp 750
1.0000 ls Alat & Equipment @Rp 750 = Rp 750
Sub total Jasa =Rp 3,000
Fabrikasi :
1.0000 ls Cutting @Rp 600 = Rp 600
1.0000 ls Welding @Rp 1,200 = Rp 1,200
1.0000 ls Rolling @Rp 1,000 = Rp 1,000
1.0000 ls Painting @Rp 850 = Rp 850
Sub total Fabrikasi = Rp 3,650
Material :
1.0024 kg Profil Baja @Rp 19,000 = Rp 19,045
Sub total Material =Rp 19,045
Grand Total = Rp 25,695

3 Pekerjaan Struktur Baja SS 400 ditambah proses machining kg


Jasa :
1.0000 ls Erection @Rp 1,500 = Rp 1,500
1.0000 ls Packing & Transport @Rp 750 = Rp 750
1.0000 ls Alat & Equipment @Rp 750 = Rp 750
Sub total Jasa =Rp 3,000
Fabrikasi :
1.0000 ls Cutting @Rp 600 = Rp 600
1.0000 ls Welding @Rp 1,200 = Rp 1,200
1.0000 ls Painting @Rp 850 = Rp 850
1.0000 ls Machining @Rp 2,000 = Rp 2,000
Sub total Fabrikasi = Rp 4,650
Material :
1.0024 kg Profil Baja @Rp 15,000 = Rp 15,036
Sub total Material =Rp 15,036
Grand Total = Rp 22,686

URAIAN ANALISA HARGA SATUAN PEKERJAAN JALAN


1 Pemasangan Tegel Trotoar m2
Upah Pekerja :
0.500 hari Pekerja @Rp - =Rp -
0.025 hari Mandor @Rp - =Rp -
0.025 hari Kepala Tukang Batu @Rp - =Rp -
0.250 hari Tukang Batu @Rp - =Rp -
Sub total Upah =Rp -

Bahan-bahan :
0.012 zak Kapur Pasang @Rp 16,821 =Rp 202
0.010 m3 Pasir Pasang @Rp 60,000 =Rp 600
0.073 zak Semen PC @Rp #REF! =Rp #REF!
1.000 m2 Tegel Trotoar @Rp 16,500 =Rp 16,500
Sub total Bahan =Rp #REF!

Grand Total =Rp #REF!

2 Pemasangan Paving Stone ( Blok ) Abu-abu tb. 6 cm Empat Persegi Panjang m2


Upah Pekerja :
0.500 hari Pekerja @Rp - =Rp 0
0.025 hari Mandor @Rp - =Rp 0
0.025 hari Kepala Tukang Batu @Rp - =Rp 0
0.250 hari Tukang Batu @Rp - =Rp 0
Sub total Upah =Rp -
Bahan-bahan :
43.000 bh Paving Stone Abu-abu tb.6 cm @Rp 1572 =Rp 67596
Sub total Bahan =Rp 67596

Grand Total =Rp 67,596

3 Penyiapan Badan Jalan m2


Metode Pelaksanaan
- Motor grader melakukan perataan (memotong dan mengurug) sehingga
membentuk permukaan dan kelandaian yang direncanakan
- Setelah permukaan badan jalan terbentuk, kemudian dipadatkan dengan
menggunakan Vibrator Roller.
- Sekelompok pekerja membantu kegiatan perataan dan pemadatan untuk
merapikan , penyiraman air (jika diperlukan), dll kegiatan yang tidak bisa
dilakukan oleh kedua jenis alat tersebut.

Upah Pekerja :
0.094 hari Pekerja @Rp - =Rp -
0.009 hari Mandor @Rp - =Rp -
Sub total Upah =Rp -
Alat2
0.003 jam Motor Grader @Rp 500,000 =Rp 1,350
0.003 jam Vibrator Roller @Rp 200,000 =Rp 600
1.000 jam Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat =Rp 3,950

Grand Total =Rp 3,950


4 Pekerjaan Timbunan Material Pilihan (sub base course) m2
Metode Pelaksanaan
- Daerah yang akan diurug dibersihkan dari segala bahan organik
Material yang sudah didrop ke lokasi pekerjaan, dihampar menggunakan
Grader.
- Hamparan tanah dipadatkan menggunakan Vibrator Roller, selama pemadatan
kadar air optimum dijaga (penyiraman air jika diperlukan dilakukan oleh
sekelompok pekerja).
- Selama pemadatan , sekelompok pekerja melakukan perapian sehingga
bentuk urugan sesuai dengan rencana.

Upah Pekerja :
1.015 hari Pekerja @Rp - =Rp -
0.101 hari Mandor @Rp - =Rp -
Sub total Upah =Rp -
Bahan-Bahan
1.325 m3 Material Pilihan @Rp 30000 =Rp 39,750
Sub total Bahan =Rp 39,750
Alat Alat
0.029 jam Motor Grader @Rp 500,000 =Rp 14,500
0.014 jam Vibrator Roller @Rp 200,000 =Rp 2,735
1.000 jam Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat =Rp 19,235

Grand Total =Rp 58,985

5 Pekerjaan Base Course m2


Metode Pelaksanaan
- Angkutan adukan material ke lokasi pekerjaan menggunakan Dump Truck,
memuat ke atas DT digunakan Wheel Loader.
- Sekelompok pekerja membantu untuk merapikan pada kegiatan penghampar-
an dan pemdatan.

AGREGAT KASAR
- Sirtu 0.65 @Rp 125,000 =Rp 81,250

AGREGAT HALUS
- Pasir 0.6 @Rp 44,943 =Rp 26,966
- Urugan pilihan 0.24 @Rp 30,000 =Rp 7,200

Upah Pekerja :
1.015 hari Pekerja @Rp - =Rp -
0.187 hari Mandor @Rp - =Rp -
Sub total Upah =Rp -
Bahan-Bahan
0.453 m3 Agregat Kasar @Rp 81250 =Rp 36,806
0.747 m3 Agregat Halus @Rp 34165.8 =Rp 25,522
Sub total Bahan =Rp 62,328

Alat2
0.053 jam Excavator @Rp 325,000 =Rp 17,361
0.201 jam Dump Truck @Rp 75,000 =Rp 15,058
0.015 jam Vibrator Roller @Rp 200,000 =Rp 3,017
1.000 LS Alat Bantu @Rp 2000 =Rp 2,000
Sub total Alat =Rp 37,436

Grand Total =Rp 99,764

6 Pekerjaan Lataston Lapis Pondasi (Surface Course) m3


Metode Pelaksanaan
- Wheel Loader memuat agregat ke dalam cold-bin
- Agregat dan Aspal dipanaskan dan dicampur di dalam AMP, dimuat langsung
dalam Dump Truck untuk dibawa ke lokasi penghamparan, selama proses
pengangkutan suhu campuran harus dijaga sedemikian rupa sehingga suhu
pada saat akan dihampar memenuhi syarat.
- Campuran dihampar menggunakan Asphalt Finisher dan dipadatkan dengan
menggunakan Tandem Roller sebagai pemadatan awal dan pemadatan akhir
serta Pneumatic Roller sebagai pemadatan antara.
- Sebelum campuran dihampar permukaan yang akan dilapis harus dipersiap-
kan terlebih dahulu dgn memberi Lapis Perekat.
- Selama proses penghamparan dan pemadatan sekelompok pekerja memban-
tu melakukan perapian.
AGREGAT KASAR
- Batu Ukuran 1 - 2 cm 0.39 @Rp 150,000 =Rp 58,500
- Batu Ukuran 0.5 - 1 cm 0.61 @Rp 135,000 =Rp 82,350

AGREGAT HALUS
- Debu batu 0.66 @Rp 125,000 =Rp 82,500
- Pasir 0.34 @Rp 44,943 =Rp 15,281

FILLER
- Debu batu 0.15 @Rp =Rp 0
- Pasir 0.15 @Rp =Rp 0
- Semen 0.7 @Rp #REF! =Rp #REF!

Upah Pekerja :
2.900 hari Pekerja @Rp - =Rp -
0.290 hari Mandor @Rp - =Rp -
Sub total Upah =Rp -
Bahan-Bahan
0.473 m3 Agregat kasar @Rp 140,850 =Rp 66,622
0.577 m3 Agregat halus @Rp 97,781 =Rp 56,419
93.571 kg Filler @Rp #REF! =Rp #REF!
160.180 kg Aspal Buton @Rp 562 =Rp 90,021
Sub total Bahan =Rp #REF!
Alat2
0.053 jam Excavator @Rp 325,000 =Rp 17,361
0.201 jam Dump Truck @Rp 75,000 =Rp 15,058
0.015 jam Vibrator Roller @Rp 200,000 =Rp 3,017
1.000 LS Alat Bantu @Rp 2,000 =Rp 2,000
Sub total Alat =Rp 37,436

Grand Total =Rp #REF!

6 Pekerjaan Rel Pengaman m3

1 m2 Pengadaan dan pemasangan @Rp 200,000 =Rp 200000


Gurad Rel
Grand Total =Rp 200,000
CALCULATION FOR PRODUCTION CAPACITY

WORK DIVISION : Earthworks


SECTION : Excavation for common material, clearing, stripping
and river deposit

DESCRIPTION SYM FIGURE UNIT

I EQUIPMENT
- Backhoe, type PC 200 long Boom
- Bucket capacity qb 0.70 m3

II UNIT PRODUCTIVITY
- Bucket factor k 0.90
- Productivity, q = qb x k q 0.63 m3/cycle

III CYCLE TIME


- Digging time (Waktu Menggali) td 6.00 sec
- Loading and swing time tl 7.00 sec
- Unloading time (membuang) tu 4.00 sec
- Swing back ts 7.00 sec
- Fixed time tt 4.00 sec
- Total cycle time, T = td + tl + tu + ts + tt T 28.00 sec

IV CORRECTION FACTOR
- Work efficiency a 0.80
- Work condition b 0.80
- Swing factor and depth digging factor c 0.90
- Loading factor d 0.82

V PRODUCTIVITY
Q = { (3600/T) x q x a x b x c x d Qe 38.26 m3/hour

WORK DIVISION : Earthworks


SECTION : Hauling to spoil bank for common material
stripping and river deposit

DESCRIPTION SYM FIGURE UNIT

I EQUIPMENT
- Dump truck, type class 10 ton
- Dump capacity qd 4.00 m3
- Backhoe, type PC 200 long Boom
- Backhoe productivity Qe 38.26 m3/hour

II CYCLE TIME
- Distance to spoil bank l 1.00 km
- Average velocity in fully loaded vl 19.00 km/h
- Average velocity un empty ve 25.00 km/h
- Loading time, t1 = qd/Qe x 60 t1 6.27 min
- Loaded travelling time, t2 = ( l/vl ) x 60 t2 3.16 min
- Dumping truck manuvre t3 2.00 min
- Empty travelling time, t4 = ( l/ve ) x 60/1000 t4 2.40 min
- Total cycle time, T = t1 + t2 + t3 + t4 T 13.83 sec

IV CORRECTION FACTOR
- Work efficiency a 0.85

V PRODUCTIVITY
Q = { (60/T) x qd x a } Qd 14.75 m3/hour
CALCULATION FOR PRODUCTION CAPACITY

WORK DIVISION : Earthworks


SECTION : Excavation for weathered rock disposal

DESCRIPTION SYM FIGURE UNIT

I EQUIPMENT
- Backhoe, type PC 200 long Boom
- Bucket capacity qb 0.70 m3

II UNIT PRODUCTIVITY
- Bucket factor k 0.60
- Productivity, q = qb x k q 0.42 m3/cycle

III CYCLE TIME


- Digging time td 8.00 sec
- Loading and swing time tl 7.00 sec
- Unloading time tu 4.00 sec
- Swing back ts 5.00 sec
- Fixed time tt 4.00 sec
- Total cycle time, T = td + tl + tu + ts + tt T 28.00 sec

IV CORRECTION FACTOR
- Work efficiency a 0.85
- Work condition b 0.85
- Swing factor and depth digging factor c 0.90
- Loading factor d 0.60

V PRODUCTIVITY
Q = { (3600/T) x q x a x b x c x d Qe 21.07 m3/hour

WORK DIVISION : Earthworks


SECTION : Hauling to spoil bank for weathered rock

DESCRIPTION SYM FIGURE UNIT

I EQUIPMENT
- Dump truck, type class 6 m3
- Dump capacity qd 4.00 m3
- Backhoe, type PC 200 long Boom
- Backhoe productivity Qe 21.07 m3/hour

II CYCLE TIME
- Distance to spoil bank l 1.00 km
- Average velocity in fully loaded vl 19.00 km/h
- Average velocity un empty ve 25.00 km/h
- Loading time, t1 = qd/Qe x 60 t1 11.39 min
- Loaded travelling time, t2 = ( l/vl ) x 60 t2 3.16 min
- Dunping truck manuvre t3 2.00 min
- Empty travelling time, t4 = ( l/ve ) x 60/1000 t4 2.40 min
- Total cycle time, T = t1 + t2 + t3 + t4 T 18.95 sec

IV CORRECTION FACTOR
- Correction factor a 0.80

V PRODUCTIVITY
Q = { (60/T) x qd x a } Qd 10.13 m3/hour
CALCULATION FOR PRODUCTION CAPACITY

WORK DIVISION : Earthworks


SECTION : Loading for hard rock disposal

DESCRIPTION SYM FIGURE UNIT

I EQUIPMENT
- Backhoe, type PC 200 long Boom
- Bucket capacity qb 0.70 m3

II UNIT PRODUCTIVITY
- Bucket factor k 0.55
- Productivity, q = qb x k q 0.39 m3/cycle

III CYCLE TIME


- Digging time td 9.00 sec
- Loading and swing time tl 7.50 sec
- Unloading time tu 4.00 sec
- Swing back ts 7.00 sec
- Fixed time tt 4.00 sec
- Total cycle time, T = td + tl + tu + ts + tt T 31.50 sec

IV CORRECTION FACTOR
- Work efficiency a 0.80
- Work condition b 0.80
- Swing factor and depth digging factor c 0.90
- Loading factor d 0.60

V PRODUCTIVITY
Q = { (3600/T) x q x a x b x c x d Qe 15.21 m3/hour

WORK DIVISION : Earthworks


SECTION : Hauling to spoil bank for hard rock disposal

DESCRIPTION SYM FIGURE UNIT

I EQUIPMENT
- Dump truck, type class 10 ton
- Dump capacity qd 4.00 m3
- Backhoe, type PC 200 long Boom
- Backhoe productivity Qe 15.21 m3/hour

II CYCLE TIME
- Distance to spoil bank l 1.00 km/h
- Average velocity in fully loaded vl 19.00 km/h
- Average velocity un empty ve 25.00 km/h
- Loading time, t1 = qd/Qe x 60 t1 15.78 min
- Loaded travelling time, t2 = ( l/vl ) x 60 t2 3.16 min
- Dumping and truck manuvre t3 2.00 min
- Empty travelling time, t4 = ( l/ve ) x 60 t4 2.40 min
- Total cycle time, T = t1 + t2 + t3 + t4 T 23.34 sec

IV CORRECTION FACTOR
- Correction efficiency a 0.80

V PRODUCTIVITY
Q = { (60/T) x qd x a } Qd 8.23 m3/hour
WORK DIVISION : Earthworks
SECTION : Hauling to spoil bank for hard rock disposal

DESCRIPTION SYM FIGURE UNIT

I EQUIPMENT
- Dump truck, type class 10 ton
- Dump capacity qd 4.00 m3
- Backhoe, type PC 200 long Boom
- Backhoe productivity Qe 8.23 m3/hour
- Boldozer, type D7 Caterpillar

II CYCLE TIME
- Distance to spoil bank l 1.00 km/h
- Average velocity in fully loaded vl 17.00 km/h
- Average velocity un empty ve 22.00 km/h
- Loading time, t1 = qd/Qe x 60 t1 29.18 min
- Loaded travelling time, t2 = ( l/vl ) x 60 t2 3.53 min
- Dumping and truck manuvre t3 2.00 min
- Empty travelling time, t4 = ( l/ve ) x 60 t4 2.73 min
- Total cycle time, T = t1 + t2 + t3 + t4 T 37.43 sec

IV CORRECTION FACTOR
- Correction efficiency a 0.80

V PRODUCTIVITY
Q = { (60/T) x qd x a } Qd 5.13 m3/hour
ok
mon material, clearing, stripping

REMARKS

0.36-1.17

90o swing angle, 60% optimum depth


common material

ok
for common material, clearing,

REMARKS
ok
ered rock disposal

REMARKS

good condition
90o swing angle, 60% optimum depth
weathered rock

ok
for weathered rock disposal

REMARKS
ok

REMARKS

for hard rock disposal

REMARKS
for hard rock disposal

REMARKS
Tabel : Daftar Item Pekerjaan
Proyek Pembangkit Listrik Tenaga Air Tamboli

Waktu harga May-08

Analisa Harga Satuan


No Item Pekerjaan MU Lokal Overhead Profit Harga Total Satuan Keterangan
Rp 10% 20% Rp

I PEKERJAAN PERSIAPAN
1.01 Pembuatan BowPlank 78,400.00 7,840.00 15,680.00 101,920.00 m2
1.02 Pembuatan Direksi Kit dan Barak Pekerja 375,000.00 37,500.00 75,000.00 487,500.00 m2
1.03 Pembuatan Papan Nama Proyek 344,684.00 34,468.40 68,936.80 448,089.20 m2
1.04 Pekerjaan Pagar Pengaman BCR tinggi 90 cm 101,500.00 10,150.00 20,300.00 131,950.00 m2

I PEKERJAAN SUNGAI
1 Pembuatan Cofferdam 100,000.00 10,000.00 20,000.00 130,000.00 m3
2 Pembongkaran Cofferdam 10,000.00 1,000.00 2,000.00 13,000.00 m3
3 Pengeringan Sungai - - 50,000,000.00 LS
4 Pasangan batu bronjong kawat (1m x 3m x 0.5m)
5 - Menggunakan Kawat ø6mm 556,245.00 55,624.50 5,562.45 617,431.95 buah
6 - Menggunakan Kawat ø8mm 759,585.00 75,958.50 7,595.85 843,139.35 buah
7 - Menggunakan Kawat ø10mm 897,585.00 89,758.50 8,975.85 996,319.35 buah

II PEKERJAAN TANAH
Manual
1 Tebas tebang berupa memotong dan membersihkan lokasi dari tanaman 0.00 - - - m2
2 Cabut tunggul tanaman keras min.diam.15 cm dgn membuang sisa kayu & akar 0.00 - - - m2

Mekanis
1 Pembersihan dan pengupasan 7,449.44 744.94 1,489.89 9,684.27 m3
2 Galian terbuka pada tanah batuan keras 38,837.49 3,883.75 7,767.50 50,488.73 m3
3 Galian terbuka pada tanah batuan lapuk 19,111.33 1,911.13 3,822.27 24,844.73 m3
4 Galian terbuka pada tanah biasa dan endapan sungai 13,207.47 1,320.75 2,641.49 17,169.71 m3
5 Pekerjaan Timbunan Sembarang 13,969.04 1,396.90 2,793.81 18,159.75 m3
6 Pekerjaan Pengurugan Sirtu dan pemadatan 170,857.60 17,085.76 34,171.52 222,114.88 m3
6 Pekerjaan Pengurugan Tanah dengan pemadatan 111,250.00 11,125.00 22,250.00 144,625.00 m3
8 Pekerjaan Pengurugan Pasir (Padat) 196,138.00 19,613.80 39,227.60 254,979.40 m3
9 Pekerjaan Urugan Clay Soil 74,500.00 7,450.00 14,900.00 96,850.00 m3

III PEKERJAAN SIPIL


Pekerjaan Beton m3
1 Pekerjaan Pembuatan Rabatan Beton (Lean Concrete ) #REF! #REF! #REF! #REF! m3
2 Beton K-125 #REF! #REF! #REF! #REF! m3
3 Beton K-175 #REF! #REF! #REF! #REF! m3
4 Beton K-225 #REF! #REF! #REF! #REF! m3
5 Beton K-250 #REF! #REF! #REF! #REF! m3
6 Beton K-300 #REF! #REF! #REF! #REF! m3
7 Beton K-350 #REF! #REF! #REF! #REF! m3
8 Pembongkaran Cetakan dan Penyiraman Beton 0.00 - - - m3
9 Pekerjaan pembesian tulangan (ø12mm) 10,937.25 1,093.73 2,187.45 14,218.43 kg
10 Pekerjaan pembesian tulangan (ø20mm) 11,218.50 1,121.85 2,243.70 14,584.05 kg
11 Pekerjaan Bekisting Kolom Sederhana 73,280.41 7,328.04 14,656.08 95,264.53 m2
12 Pekerjaan Pembesian Pemakaian Wire Mesh 15,000.00 1,500.00 3,000.00 19,500.00 kg
13 Bak Kontrol 500,000 50,000.00 100,000.00 650,000.00 nos

VI PEKERJAAN LOGAM
6.01 Pekerjaan Struktur Baja SS 400 20,685.71 2,068.57 4,137.14 26,891.43 kg
6.02 Pekerjaan Pembuatan Steel welded Penstock (material SM 50) 25,695.24 2,569.52 5,139.05 33,403.81 kg
6.03 Pekerjaan Struktur Baja SS 400 ditambah proses machining 22,685.71 2,268.57 4,537.14 29,491.43 kg

VII PEKERJAAN JALAN


7.01 Penyiapan badan jalan 3950.00 395.00 790.00 5,135.00 m2
7.02 Subbase Course 58,985.04 5,898.50 11,797.01 76,680.56 m2
7.03 Base Course 99,763.74 9,976.37 19,952.75 129,692.87 m2
7.04 Surface Course #REF! #REF! #REF! #REF! m3
7.05 Rel Pengaman 200,000.00 20,000.00 40,000.00 260,000.00 m2

VIII PEKERJAAN GEDUNG, ARSITEKTUR DAN UTILITAS

Pekerjaan Lantai
Pekerjaan Plesteran Halus 1 Pc : 2 Ps , tebal 1.5 cm 18752 1,875.20 3,750.40 26,440.32 m2
Pekerjaan Plesteran Halus 1 Pc : 3 Ps , tebal 1 cm 16674 1,667.40 3,334.80 23,510.34 m2
Pekerjaan Plesteran Halus 1 Pc : 3 Ps , tebal 1.5 cm 28512 2,851.20 5,702.40 40,201.92 m2
Pekerjaan lantai keramik 30x30 81411.05 8,141.11 16,282.21 114,789.58 m2
Pekerjaan lantai keramik 20x20 81981.2 8,198.12 16,396.24 115,593.49 m2

Pekerjaan Dinding
Pasangan bata merah tebal 1/2 bata adukan 1PC : 2PP #REF! #REF! #REF! #REF! m2
Pasangan bata merah tebal 1/2 bata adukan 1PC : 4PP #REF! #REF! #REF! #REF! m2
Pekerjaan Plesteran Dinding 1 : 3 #REF! #REF! #REF! #REF! m2
Pekerjaan Key Panel 115,000.00 11,500.00 23,000.00 149,500.00 m2
Pembuatan Dinding Penahan Tanah dari Batu Kali #REF! #REF! #REF! #REF! m3
Waterstop dengan material PVC - - 100,000.00 m
Sambungan kontraksi dengan bitumen atau pengisi samb. Elastometrik - - 50,000.00 m

Pekerjaan Pasangan
1 Pekerjaan Pasangan batu kali Mortar Type M (1 PC : 2 PP) #REF! #REF! #REF! #REF! m3
2 Pekerjaan Pasangan batu kali Mortar Type S (1 PC : 3 PP) #REF! #REF! #REF! #REF! m3
3 Pekerjaan Pasangan batu kali Mortar Type N (1 PC : 4 PP) #REF! #REF! #REF! #REF! m3
4 Pekerjaan Pasangan batu kali Mortar Type O (1 PC : 4 PP) #REF! #REF! #REF! #REF! m3
5 Pekerjaan Pasangan batu kosong 156,000.00 15,600.00 31,200.00 202,800.00 m3
6 Pembuatan Dinding Penahan Tanah dari Batu kali #REF! #REF! #REF! #REF! m3

Pekerjaan Pengecatan
Pekerjaan Pengecatan Dinding Exterior 25,530.00 2,553.00 5,106.00 33,189.00 m2
Pekerjaan Pengecatan Interior 21,780.00 2,178.00 4,356.00 28,314.00 m2
Pekerjaan Pengecatan Kayu 18,089.00 1,808.90 3,617.80 23,515.70 m2
Pekerjaan Pengecatan Besi 18,167.50 1,816.75 3,633.50 23,617.75 m2

Pekerjaan Kusen, Pintu, Jendela


Mengerjakan 1 M3 Kayu untuk kosen jendela/pintu 1,500,000.00 150,000.00 300,000.00 1,950,000.00 buah
Pekerjaan Daun Pintu Double tekwood ( TT ) 602,911.60 60,291.16 120,582.32 783,785.08 buah
Pekerjaan Jendela 517,066.00 51,706.60 103,413.20 672,185.80 buah

Pekerjaan Sirkulasi Udara


Pekerjaan Pengadaan AC 1.5 PK 5,117,500.00 511,750.00 1,023,500.00 6,652,750.00 buah
Sistim Ventilasi Udara - - 100,000,000.00 LS

Pekerjaan Plumbing
Sistim suplai air Bersih - - - 50,000.00 m
Sistim Air Kotor - - - 150,000.00 m
Pompa Air dan kontrol 5,000,000.00 500,000.00 1,000,000.00 6,500,000.00 Unit Set

Pekerjaan Pemadam Kebakaran


Pemadam Api (Extinguisher) - - - 3,500,000.00 unit Pembelian
Hydrant Kebakaran - - - 42,600,000.00 unit Pembelian

Pekerjaan Pemagaran
Pagar dan Gerbang 380,000.00 38,000.00 76,000.00 494,000.00 m2

IX PEKERJAAN ELEKTRIKAL
Generator Set untuk suplai listrik waktu pengerjaan proyek 7,500,000.00 unit
Jalur Distribusi 70 kV
Gardu Induk
Switchgear Tegangan Rendah
Sistim Lampu dan Elektrikal Auxilary Service
Sistim Alarm Kebakaran Otomatis
Sistim Pentanahan

Pekerjaan Perpipaan
1 Pemasangan Pipa SGP 4" Sebagai Encasement Pipe 60000 6,000.00 12,000.00 78,000.00 m
2 Pemasangan Pipa SGP 6" Sebagai Drain Pipe 65000 6,500.00 13,000.00 84,500.00 m
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita ok
Item Pekerjaan : Persiapan dan mobilisasi

No Jenis Pekerjaan Nominal

1 Pembuatan BowPlank
Total Luasan Bowplank 750.00 m2
Biaya /m2 90,160.00 Rp/m2
Total Biaya Rp 67,620,000.00

2 Pembuatan Papan Nama Proyek


Total Luas Papan 10 m2
Biaya /m2 396,386.60 Rp/m2
Total Biaya Rp 3,963,866.00

3 Pembuatan Direksi Kit dan Barak Pekerja


Workshop and laboratorium, 1 unit 10 x 10 100.00 m2
Tempat rehat sementara, 5 x 5, 3 unit 75.00 m2
Barak Pekerja, 1 unit of T 90 90.00 m2
Mushola 30.00 m2
Total Luas 295.00 m2
Biaya /m2 487,500.00 Rp/m2
Total Biaya Rp 143,812,500.00

4 Sistem Suplai Daya listrik


Pemasangan Generator dan instalasi Listrik 1.00 LS
Biaya per satuan = LS 7,500,000.00 Rp
Total Biaya Rp 7,500,000.00

5 Pembersihan Daerah
Area of project quarter 590.00 m2
Biaya /m2 6,041.89 Rp
Total Biaya Rp 3,564,712.88

6 Pekerjaan pemagaran
Luas daerah yang harus diamankan 150.00 m'
Biaya /m 116,725.00 Rp
Total Biaya Rp 17,508,750.00

TOTAL Rp 243,969,828.88
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Acces Road

No Jenis Pekerjaan Nominal

1 Pekerjaan Tanah
a Pengupasan dan pembersihan Area Jalan PH
Perkiraan total luasan yang dibuat jalan 300 m2
Biaya /m2 Rp 9,684.27 Rp/m2
Total Biaya Rp 2,905,280.79

b Pekerjaan Galian Tanah dgn Batuan Lapuk


Perkiraan volume galian untuk jalan 11,332 m3
Biaya / m3 Rp 24,844.73 Rp/m3
Total Biaya Rp 281,545,499.53

c Penyiapan Badan Jalan


Perkiraan total luasan yang dibuat jalan 300 m2
Biaya /m2 Rp 5,135.00 Rp/m2
Total Biaya Rp 1,540,500.00
Rp 285,991,280.32

2 Pekerjaan Konstruksi Jalan


a Pekerjaan sub base course dan base course
Perkiraan total luasan yang dibuat jalan sepanjang waterway 2550 m2
Perkiraan total luasan yang dibuat jalan dari PH ke headpond 2430 m2
Luasan Total 4980 m2
Biaya / m2 Rp 206,373.42 Rp/m2
Total Biaya Rp 1,027,739,644.15

b Pekerjaan surface course


Luasan Total 4980 m2
Tebal Lapisan 0.03 m
Volume Total 149.4 m3
Biaya / m3 #REF!
Total Biaya #REF!

c Pagar pengaman di pinggir jalan = 30% dari total panjang 342.6 m'
Biaya / m Rp 260,000.00 Rp/m'
Total Biaya Rp 89,076,000

d Jembatan dan Gorong-Gorong


Biaya / LS Rp 15,000,000.00
Total Biaya Rp 15,000,000
#REF!

TOTAL #REF!
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Saluran Diversi dan Cofferdam Alternative 2

No Jenis Pekerjaan Nominal

1 Pekerjaan Tanah
1.1 Pengupasan dan pembersihan Area
Perkiraan luas 3000 m2
Biaya /m2 Rp 9,684.27 Rp/m2
Total Biaya Rp 29,052,807.89

1.2 Pekerjaan Galian Lahan untuk mendapatkan Level Ketinggian


a Galian terbuka pada tanah biasa dan endapan sungai
Perkiraan volume galian 2000 m3
Biaya / m3 Rp 24,844.73 Rp/m3
Total Biaya Rp 49,689,468.86

1.3 Timbunan Sembarang


Perkiraan Volume Timbunan 500 m3
Biaya / m3 Rp 18,159.75 Rp/m3
Total Cost Rp 9,079,876.37
Rp 87,822,153.13

2 Pekerjaan Pengeringan Sungai


Biaya /unit satuan LS Rp 25,000,000.00
Total Biaya Rp 25,000,000.00

3 Pekerjaan Sipil (Konstruksi)


3.1 Pengerjaan konstruksi Pembuatan Cofferdam dan pembongkarannya
Cofferdam
Tipe cofferdam Gabion with filler
Total Volume dari cofferdam 820 m3
Biaya /m3 Rp 143,000.00 Rp/m3
Total Biaya Rp 117,260,000.00

3.2 Pembuatan Dinding penahan tanah untuk Saluran Diversi


Volume Total 150.00 m3
Biaya/m3 Rp 120,000.00 Rp/m3
Total Biaya Rp 18,000,000.00
Rp 135,260,000.00

JUMLAH Rp 248,082,153.13
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Bendung

No Jenis Pekerjaan Nominal

1 Pekerjaan Tanah
1.1 Pengupasan dan pembersihan Area
Perkiraan luas 483.52 m2
Biaya /m2 Rp 9,684.27 Rp/m2
Total Biaya Rp 4,682,537.89

1.3 Pekerjaan Galian untuk Konstruksi


Perkiraan volume galian 8086.5 m3
Biaya / m3 Rp 24,844.73 Rp/m3
Total Biaya Rp 200,906,944.99

1.4 Timbunan Sembarang


Perkiraan Volume Timbunan 808.65 m3
Biaya / m3 Rp 18,159.75 Rp/m3
Total Cost Rp 14,684,884.06
Rp 220,274,366.94
2 Pekerjaan Sipil (Konstruksi)
2.1 Pengerjaan konstruksi lantai upstream dan downstream
a Pengerjaan timbunan lapisan dasar lantai dengan pemadatan
Tebal timbunan 0.1 m
Volume Total leba 8 m m 24 m3
Biaya /m3 Rp 254,979.40 Rp/m3
Total Biaya Rp 6,119,505.60

b Pekerjaan timbunan Clay Soil


Tebal timbunan 0.8 m
Volume Total 192 m3
Biaya /m3 Rp 96,850.00 Rp/m3
Total Biaya Rp 18,595,200.00

b Pekerjaan timbunan Batu Kosong (rip Rap)


Tebal timbunan 0.5 m
Volume Total 120 m3
Biaya /m3 Rp 202,800.00 Rp/m3
Total Biaya Rp 24,336,000.00

c Pekerjaan Pasangan Batu


Volume Total Pasangan Batu 310.05 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

d Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 59.07 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12 mm)


Berat Tulangan 1500 kg
Biaya /kg Rp 14,218.43 Rp/kg
Total Biaya Rp 21,327,637.50
\
Bekisting dan pembongkaran
Volume Beton yang dibekisting 59.07 m3
Biaya /m3 Rp 95,264.53 Rp/m3
Total Biaya Rp 5,627,275.58
#REF!
2.2 Pengerjaan konstruksi Dinding Pengarah (Upstream dan downstream)
a Pengerjaan timbunan lapisan dasar dinding pengarah dengan pemadatan
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Bendung

No Jenis Pekerjaan Nominal


Tebal timbunan 0.1 m
Volume Total 150 m3
Biaya /m3 Rp 254,979.40 Rp/m3
Total Biaya Rp 38,246,910.00

b Pekerjaan Pasangan Batu


Volume Total Pasangan Batu 613.368 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

c Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K-300) 41.426 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Bekisting dan pembongkaran


Volume Beton yang dibekisting 41.426 m3
Biaya /m3 Rp 95,264.53 Rp/m3
Total Biaya #REF! Rp 3,946,428.27

2.3 Pengerjaan konstruksi Bendung/Mercu


a Pengerjaan timbunan lapisan dasar saluran dangan pemadatan
Tebal timbunan 0.1 m
Volume Total 64.2675 m3
Biaya /m3 Rp 144,625.00 Rp/m3
Total Biaya Rp 9,294,687.19

b Pekerjaan Pasangan Batu


Volume Total Pasangan Batu 854.678 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

c Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 51.942 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 722.222 kg
Biaya /kg Rp 14,218.43 Rp/kg
Total Biaya Rp 10,268,862.50

Bekisting dan pembongkaran


Volume Beton yang dibekisting 51.942 m3
Biaya /m3 Rp 95,264.53 Rp/m3
Total Biaya Rp 4,948,230.04

d Waterstop dengan material Karet (Lebar 250mm)


Panjang total waterstop 224 m
Biaya/m Rp 50,000.00 Rp/m
Total Biaya Rp 11,200,000.00
#REF!

2.4 Pengerjaan konstruksi Lantai Penguras Sisi Bendung


a Pengerjaan timbunan lapisan dasar konstruksi dengan pemadatan
Tebal timbunan 0.1 m
Volume Total 50 m3
Biaya /m3 Rp 144,625.00 Rp/m3
Total Biaya Rp 7,231,250.00
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Bendung

No Jenis Pekerjaan Nominal


b Pekerjaan Pasangan Batu
Volume Total Pasangan Batu 39.105 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

c Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 2 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 150 kg
Biaya /kg Rp 14,218.43 Rp/kg
Total Biaya Rp 2,132,763.75

Bekisting dan pembongkaran


Volume Beton yang dibekisting 2 m3
Biaya /m3 Rp 95,264.53 Rp/m3
Total Biaya Rp 190,529.05
#REF!

2.5 Pengerjaan konstruksi Dinding Penguras Sisi Bendung


a Pengerjaan timbunan lapisan dasar konstruksi dengan pemadatan
Tebal timbunan 0.1 m
Volume Total 100 m3
Biaya /m3 Rp 144,625.00 Rp/m3
Total Biaya Rp 14,462,500.00

b Pekerjaan Pasangan Batu


Volume Total Pasangan Batu 748.71 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

c Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 55.76 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 750 kg
Biaya /kg Rp 14,218.43 Rp/kg
Total Biaya Rp 10,663,818.75

Bekisting dan pembongkaran


Volume Beton yang dibekisting 55.759 m3
Biaya /m3 Rp 95,264.53 Rp/m3
Total Biaya Rp 5,311,854.73
#REF!

JUMLAH #REF!
BILL OF QUANTITY

Nama Proyek : PLTMH Sakita


Item Pekerjaan : Pekerjaan Pembuatan Intake dan Sandtrap

No Jenis Pekerjaan Nominal

1 Pekerjaan Tanah
1.1 Pekerjaan Galian untk Konstruksi
Perkiraan volume galian 3374 m3
Biaya / m3 Rp 24,844.73
Total Biaya Rp 83,817,438.32
Rp 83,817,438.32

2 Pekerjaan Sipil (Konstruksi)


2.1 Pengerjaan konstruksi lantai Intake
a Pengerjaan timbunan lapisan dasar saluran dangan pemadatan
Tebal timbunan 0.1 m
Luasan Total 0.4 m2
Volume Total 8.36 m3
Biaya /m3 Rp 254,979.40
Total Biaya Rp 2,131,627.78

b Pekerjaan Pasangan Batu


Volume Total Pasangan Batu 16.9 m3
Biaya /m3 #REF!
Total Biaya #REF!

c Pekerjaan lantai beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 8 m3
Biaya /m3 #REF!
Total Biaya #REF!

Bekisting dan pembongkaran


Volume Beton yang dibekisting 8 m2
Biaya /m3 Rp 95,264.53
Total Biaya Rp 762,116.21
#REF!

2.2 Pengerjaan konstruksi Dinding Intake & bangunan pintu intake


a Pengerjaan timbunan lapisan dasar saluran dangan pemadatan
Tebal timbunan 0.1 m
Volume Total 5 m3
Biaya /m3 Rp 254,979.40
Total Biaya Rp 1,274,897.00

b Pekerjaan Pasangan Batu


Volume Total Pasangan Batu 217 m3
Biaya /m3 #REF!
Total Biaya #REF!

c Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K-300) 35 m3
Biaya /m3 #REF!
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 1096 kg
Biaya /m3 Rp 14,218.43
Total Biaya Rp 15,583,393.80

Bekisting dan pembongkaran


Volume Beton yang dibekisting 35 m3
Biaya /m3 Rp 95,264.53
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Intake dan Sandtrap

No Jenis Pekerjaan Nominal


Total Biaya Rp 3,334,258.43
#REF!
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Intake dan Sandtrap

No Jenis Pekerjaan Nominal

3 Pengerjaan konstruksi Lantai Sandtrap


a Pekerjaan Pasangan Batu
Volume Total Pasangan Batu 38.9 m3
Biaya /m3 #REF!
Total Biaya #REF!

b Pekerjaan lantai beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 23 m3
Biaya /m3 #REF!
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 812 kg
Biaya /kg Rp 14,218.43
Total Biaya Rp 11,551,190.65

Bekisting dan pembongkaran


Volume Beton yang dibekisting 23 m3
Biaya /m3 Rp 95,264.53
Total Biaya Rp 2,191,084.11
#REF!

4 Pengerjaan konstruksi Dinding Sandtrap


a Pengerjaan timbunan lapisan dasar saluran dangan pemadatan
Tebal timbunan
Volume Total 0.1 m
Biaya /m3 18.3 m3
Total Biaya Rp 144,625.00
Rp 2,640,852.50
b Pekerjaan Pasangan Batu
Volume Total Pasangan Batu 520 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

c Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 54 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 1895 kg
Biaya /kg Rp 14,218.43 Rp/kg
Total Biaya Rp 26,943,915.38

Bekisting dan pembongkaran


Volume Beton yang dibekisting 54 m3
Biaya /m3 Rp 95,264.53 Rp/m3
Total Biaya Rp 5,144,284.43
#REF!

5 Pengerjaan konstruksi Spillway


a Pengerjaan timbunan lapisan dasar saluran dangan pemadatan
Tebal timbunan 0.1 m
Volume Total 2 m3
Biaya /m3 Rp 144,625.00
Total Biaya Rp 289,250.00
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Pekerjaan Pembuatan Intake dan Sandtrap

No Jenis Pekerjaan Nominal

b Pekerjaan Pasangan Batu


Volume Total Pasangan Batu 94.2 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

c Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 16 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 400 kg
Biaya /kg Rp 14,218.43
Total Biaya Rp 5,687,370.00

Bekisting dan pembongkaran


Volume Beton yang dibekisting 16 m3
Biaya /m3 Rp 95,264.53
Total Biaya Rp 1,524,232.42
#REF!

JUMLAH #REF!
BILL OF QUANTITY
Nama Proyek PLTMH Sakita
Item Pekerjaan Waterway

No Jenis Pekerjaan Nominal

1 Pekerjaan Tanah
a Pengupasan dan pembersihan Area
Perkiraan Total Luas 6900 m2
Biaya /m2 9,684.27 Rp/m2
Total Biaya Rp 66,821,458.15

b Galian terbuka tanah dgn batuan lapuk


Total Volume Galian 46,648.10 m3
Biaya / m3 24,844.73 Rp/m3
Total Biaya Rp 1,158,959,656.27

c Timbunan Sembarang
Volume Timbunan di sekitar desand 200 m3
Volume Timbunan di sekitar canal 1500 m3
Volume timbunan total 1700
Biaya / m3 18,159.75 Rp/m3
Total Biaya Rp 1,256,652,694.08 Rp 30,871,579.67

2 Pekerjaan Konstruksi Saluran Waterway


a Pengerjaan timbunan lapisan dasar saluran dangan pemadatan
Volume Total 110.88 m3
Biaya /m3 = 144,625.00 Rp/m3
Total Biaya Rp 16,036,020

b Pekerjaan Beton Untuk Plesteran


Beton Massa Struktural untuk lapisan plester (K-125)
Volume total 60.00 m3
Biaya / m3 #REF! Rp/m3
Total Biaya #REF!

c Pekerjaan Pasangan Batu


Pekerjaan Pasangan batu kali Mortar Type S (1 PC : 3 PP)
Volume kebutuhan pasangan batu 1089.517 m3
Biaya / m3 #REF! Rp/m3
Total Biaya #REF!

d Pekerjaan beton bertulang


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 160 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 13740 kg
Biaya /kg Rp 14,218.43 Rp/kg
Total Biaya Rp 195,361,160

Bekisting dan pembongkaran


Volume Beton yang dibekisting 160 m3
Biaya /m3 Rp 95,264.53 Rp/m3
Total Biaya Rp 15,242,324

e Waterstop dengan PVC


Jumlah waterstop Setting each 20 m length of waterway 37 buah
Panjang tiap segmen 4.1 m
Total Panjang 151.7 m
Biaya / m 115,000.00 Rp/m
Total Biaya Rp 17,445,500.00
Nama Proyek PLTMH Sakita
Item Pekerjaan Waterway

No Jenis Pekerjaan Nominal

f Sambungan kontraksi dengan bitumen atau pengisi samb. Elastometrik


Panjang sambungan 151.7 m
Biaya / m 23,226.60 Rp/m
Total Biaya Rp 3,523,475.37
#REF!

3 Pekerjaan Drainase
a Pekerjaan beton bertulang Kontruksi saluran
Pekerjaan beton massa struktural (K-125)
Panjang Total 738 m
Luas 0.1425 m2
Jumlah saluran 2
Total Volume Lean concrete 231.363 m3
Biaya /m3 Rp 737,772.68 Rp/m3
Total Biaya Rp 170,693,300.33

Pekerjaan Tulangan Wire mesh (Besi beton 2mm)


Berat Tulangan 236 kg
Biaya /kg Rp 19,500.00 Rp/kg
Total Biaya Rp 5,192,000.00

Bekisting dan pembongkaran


Volume Beton yang dibekisting 231 m3
Biaya /m3 Rp 95,264.53 Rp/m3
Total Biaya Rp 22,040,686.64

b Bak Kontrol (K-125)


Luas 0.282 m2
Panjang Total 2 m
Volume Lean concrete 0.5650 m3
Jumlah Bak kontrol 10 pcs
Biaya /m3 Rp 650,000.00
Total Biaya Rp 4,039,506.90
Rp 201,965,493.88

TOTAL #REF!
BILL OF QUANTITY
Nama Proyek PLTMH Sakita
Item Pekerjaan Head Pond

No Work Item Amount

1 Pekerjaan Tanah
a Pengupasan dan pembersihan Area
Luas Area Headpond 454.60 m2
Biaya /m2 9,684.27 Rp/m2
Total Biaya Rp 4,402,468.82

b Galian terbuka tanah dgn batuan lapuk


Volume galian 3,196.93 m3
Biaya /m3 24,844.73 Rp/m3
Total Biaya Rp 79,426,876.85

c Pengerjaan timbunan lapisan dasar saluran dangan pemadatan


Tebal timbunan 0.1 m
Luasan Total 454.60 m2
Volume Total 50.006 m3
Biaya /m3 = 144,625.00 Rp/m3
Total Biaya Rp 7,232,117.75

d Pekerjaan Galian Untuk Konstruksi


Volume galian 2705.27 m3
Biaya /m3 24,844.73 Rp/m3
Total Biaya Rp 67,211,714.72
Rp 158,273,178.14

2 Pekerjaan Konstruksi Headpond


a Pengerjaan timbunan lapisan dasar saluran dangan pemadatan
Tebal timbunan 0.1 m
Volume Total 45.46 m3
Biaya /m3 222,114.88 Rp/m3
Total Biaya Rp 10,097,342.44

b Pekerjaan Pasangan Batu


Volume total 817.30 m3
Biaya / m3 #REF! Rp/m3
Total Biaya #REF!

c Pekerjaan Beton Bertulang


Beton Massa Struktural (K-125)
Volume beton 95.12 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 4262 kg
Biaya /m3 14,218.43
Total Biaya Rp 60,598,927.35

Bekisting dan pembongkaran


Volume Beton yang dibekisting 95.12 m3
Biaya /m3 95,264.53 Rp/m3
Total Biaya Rp 9,061,275.97
Nama Proyek PLTMH Sakita
Item Pekerjaan Head Pond

No Work Item Amount

d Waterstop dengan PVC


Jumlah waterstop 3 buah
Panjang tiap segmen Dipasang pada tiap 20 m 20 m
Total Panjang 60 m
Biaya / m 100,000.00 Rp/m
Total Biaya Rp 6,000,000.00

e Sambungan kontraksi dengan bitumen atau pengisi samb. Elastometrik


Panjang sambungan 60 m
Biaya / m 50,000.00 Rp/m
Total Biaya Rp 3,000,000.00
#REF!

TOTAL #REF!
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Penstock line

No Work Item Amount

1 Pekerjaan Tanah
a Pembersihan dan pengupasan
Total luas yang harus dibersihkan 1,406.49
Biaya /m2 9,684.27
Total Biaya Rp 13,620,827.92

b Galian terbuka tanah dgn batuan lapuk


Volume Galian 21,522.89
Biaya /m3 24,844.73
Total Biaya Rp 534,730,486.26

c Timbunan Sembarang
Volume Timbunan 1000
Biaya /m3 18,159.75
Total Biaya Rp 18,159,752.75

d Pengerjaan timbunan lapisan dasar saluran dangan pemadatan


Tebal timbunan 0.10
Luasan Total 1,406.49
Volume Total 140.65
Biaya /m3 = 39,859.00
Total Biaya Rp 5,606,128.49
Rp 558,496,367.50

TOTAL COST Rp 572,117,195.43


Amount

m2
Rp/m2

m3
Rp/m3

m3
Rp/m3

m
m2
m3
Rp/m3

72,117,195.43
BILL OF QUANTITY
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Power House

No Item Pekerjaan Nominal

1 Pekerjaan Tanah
a Pembersihan dan pengupasan
Luas wilayah 350.00 m2
Biaya /m2 9,684.27 Rp/m2
Total Biaya Rp 3,389,494.25

b Galian Tanah dgn batuan lapuk


Volume Galian 3,295.05 m3
Biaya /m3 24,844.73 Rp/m3
Total Biaya Rp 81,864,642.19

c Timbunan Sembarang
Volume Timbunan 500.00 m3
Biaya /m3 18,159.75 Rp/m3
Total Biaya Rp 9,079,876.37

d Pekerjaan Galian Untuk Konstruksi


Volume galian 550.00 m3
Biaya /m3 24,844.73 Rp/m3
Total Biaya Rp 13,664,603.94
Rp 107,998,616.76
2 Pekerjaan Gedung Power House
Alternative 1
a Pekerjaan Struktur Baja
Berat Total Struktur Baja 18,000.00 kg
Biaya / kg 26,891.43 Rp/kg
Total Biaya Rp 484,045,714.29
Rp 484,045,714.29

Alternative 2
a Pekerjaan Balok Baja
Berat Total Balok Baja 10,188.00 kg
Biaya / kg 26,891.43 Rp/kg
Total Biaya Rp 273,969,874.29

b Pekerjaan Kolom Beton


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 11.90 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 596.00 kg
Biaya /kg 14,218.43 Rp/kg
Total Biaya Rp 8,474,181.30

Pekerjaan Tulangan Baja (Besi beton 20mm)


Berat Tulangan 355.00 kg
Biaya /kg 14,584.05 Rp/kg
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Power House

No Item Pekerjaan Nominal


Total Biaya Rp 5,177,337.75

Bekisting dan pembongkaran


Volume Beton yang dibekisting 11.90 m3
Biaya /m3 95,264.53 Rp/m3
Total Biaya Rp 1,133,838.39
#REF!

Alternative 3
a Pekerjaan Kolom Beton
Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 42.77 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 1,815.70 kg
Biaya /kg 14,218.43 Rp/kg
Total Biaya Rp 25,816,394.27

Pekerjaan Tulangan Baja (Besi beton 20mm)


Berat Tulangan 355.00 kg
Biaya /kg 14,584.05 Rp/kg
Total Biaya Rp 5,177,337.75

Bekisting dan pembongkaran


Volume Beton yang dibekisting 42.77 m3
Biaya /m3 95,264.53 Rp/m3
Total Biaya Rp 4,074,273.27
#REF!

3 Pekerjaan Pondasi Turbine


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 65.00 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Tulangan Baja (Besi beton 12mm)


Berat Tulangan 3,000.00 kg
Biaya /kg 14,218.43 Rp/kg
Total Biaya Rp 42,655,275.00

Bekisting dan pembongkaran


Volume Beton yang dibekisting 65.00 m3
Biaya /m3 95,264.53 Rp/m3
Total Biaya Rp 6,192,194.22
#REF!

4 Pekerjaan Pondasi Powerhouse


Pekerjaan beton massa struktural
Volume Total Beton Massa Struktural (K 300) 10.45 m3
Biaya /m3 #REF! Rp/m3
Total Biaya #REF!
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Power House

No Item Pekerjaan Nominal


Pekerjaan Tulangan Baja (Besi beton 12mm)
Berat Tulangan 500.00 kg
Biaya /kg 14,218.43 Rp/kg
Total Biaya Rp 7,109,212.50

Bekisting dan pembongkaran


Volume Beton yang dibekisting 10.45 m3
Biaya /m3 95,264.53 Rp/m3
Total Biaya Rp 995,933.47
#REF!
5 Pekerjaan Dinding
Pekerjaan Beton Massa Struktural (K 225)
Volume beton m3
Biaya / m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan pembesian (Besi Beton 12 mm)


Total Berat kg
Biaya / kg 14,218.43 Rp/kg
Total Biaya Rp -

Pekerjaan Pasangan Batu Bata


Total Luas Dinding yang memakai batu bata m2
Biaya / m2 #REF! Rp/m2
Total Biaya #REF!

Pekerjaan Pengecatan Dinding


Luasan dinding m2
Biaya / m2 28,314.00 Rp/m2
Total Biaya Rp -
#REF!

6 Pekerjaan Lantai
Pekerjaan Beton Massa Struktural (K 175)
Volume beton m3
Biaya / m3 #REF! Rp/m3
Total Biaya #REF!

Pekerjaan Plesteran
Luas Area m2
Tebal m
Biaya / m2 23,510.34 Rp/m2
Total Biaya Rp -

Pekerjaan Keramik 30 x 30 cm
Luas Area m2
Biaya / m2 114,789.58 Rp/m2
Total Biaya Rp -

7 Pekerjaan Kusen, Pintu, Jendela


Pekerjaan Pintu dari Tekwood
Jumlah Pintu unit
Nama Proyek : PLTMH Sakita
Item Pekerjaan : Power House

No Item Pekerjaan Nominal


Biaya / unit
Total Biaya

Pekerjaan Pintu Geser


Jumlah Pintu
Biaya / unit
Total Biaya

Pekerjaan Jendela
Jumlah Jendela
Biaya / m2
Total Biaya

Pekerjaan Kusen
Jumlah Kusen
Biaya / unit
Total Biaya

Architectural work
Estimated quantity
Biaya / unit
Total Biaya

TOTAL #REF!
BILL OF QUANTITY
Nama Proyek : Tamboli MHPP
Item Pekerjaan : Hydraulic Equipment

No Work Item Amount

1 Trashrack
a Trashrack for intake structure (Coarse Screen)
Lebar 4.50
Tinggi 3.00
Total weight 1,589.63
Unit cost/m2 = 26,891.43
Total Cost Rp 42,747,287.14

b Trashrack for intake penstock structure (fine trashrack)


Tinggi 3.20
Lebar 6.00
Total Weight 2,712.96
Unit cost/ton 26,891.43
Total Cost Rp 72,955,370.06

2 Stoplog
a Stoplog in Intake
Lebar 1.20
Tinggi 1.20
Total weight 1,695.60
Number of Unit 2.00
Unit cost/ton 26,891.43
Total Cost Rp 91,194,212.57

b Stoplog in Sandtrap
Total weight of a stoplog 1,000.00
Number of Unit 1.00
Unit cost/ton 26,891.43
Total Cost Rp 30,925,142.86

3 Gate
a Sliding Gate in Intake
Total weight of a Gate 2250
Number of Unit 3.00
Unit cost/ton 29,491.43
Total Cost Rp 199,067,142.86

b Sliding Gate for Flushing


Total weight of a Gate 1800
Number of Unit 2.00
Unit cost/ton 29,491
Total Cost Rp 106,169,142.86
c Sliding Gate to Penstock
Total weight of a Gate 3,000
Number of Unit 1
Unit cost/ton 29,491
Total Cost Rp 88,474,285.71

c Gate lifting equipments in Intake and Weir


Number of unit 6.00
Unit cost 20,000,000
Total Cost Rp 120,000,000.00

TOTAL Rp 751,532,584.06
unt

m
m
kg
Rp/kg

m
m

Rp/kg

pcs
Rp/kg

kg
pcs
Rp/kg

kg
pcs
Rp/kg

kg
pcs
Rp/kg
kg

pcs

1,532,584.06
PROJECT COST ESTIMATED
HYDRO ELECTRIC POWER PROJECT TAMBOLI

Project Name : Tamboli


Installed Capacity : 4 x 5.5 MW

No. Description Cost %


IDR

I DIRECT COST
1.1 CIVIL WORK
1.1.1 Persiapan dan mobilisasi 243,969,829 #REF!
1.1.2 Acces Road #REF! #REF!
1.1.3 River Diversion 248,082,153 #REF!
1.1.4 Weir #REF! #REF!
1.1.5 Intake and Sandtrap #REF! #REF!
1.1.6 Waterway #REF! #REF!
1.1.7 Headpond #REF! #REF!
1.1.8 Penstock 572,117,195 #REF!
1.1.9 Power House #REF! #REF!
SUB TOTAL 1.1 #REF! #REF!

1.2 HIDRAULIC EQUIPMENT


SUB TOTAL 1.2 751,532,584 #REF!

1.3 GENERATING EQUIPMENT


SUB TOTAL 1.3 2,200,000,000 #REF!

1.4 Electrical equipment and transmission 1,000,000,000 #REF!

TOTAL DIRECT COST #REF! #REF!

II INDIRECT CONT
2.1 Land Acquisition 0 #REF!
2.2 Study & Desain #REF! #REF!
2.3 Engineering Service (10%) #REF! #REF!
2.4 Tax (10%) #REF! #REF!
2.5 Contingency #REF!
- Civil & Mechanical Work (10%) #REF! #REF!
- Generating Equipment (5%) 110,000,000 #REF!

TOTAL INDIRECT COST #REF! #REF!

TOTAL CONSTRUCTION COST #REF! #REF!

INTEREST DURING CONSTRUCTION #REF!


TOTAL COST #REF!

COST PER MEGA WATT #REF!


Hanya galian

Progess Summary:

Direct Cost 18,548,188,681.75 #REF!

Land Acquisition - 89%


Study & Desain #REF! 72%
Engineering Service (10%) #REF! 5%
Tax (10%) #REF!
Contingency 0
- Civil Work (10%) #REF!
- Generating Equipment (5%) 0

Indirect Cost: #REF!

Expended #REF! #REF!

Completion cost #REF! #REF!


Proposal sebelumnya: 129,612,116,323.82
Selisih dengan proposal lama: #REF!