Specification & Estimation - MCQ
Specification & Estimation - MCQ
10. While estimating the qualities for the construction of a building, the correct metric unit is
a) Metre for length
b) Cubic metre for area
c) Square metres for volume
d) Litre for capacity
42. Pick up the item of work not included in the plinth area estimate
a) Wall thickness
b) Room area
c) W.C. area
d) Courtyard area
43. The minimum width of a septic tank is taken
a) 70 cm
b) 75 cm
c) 80 cm
d) 90 cm
44. Pick up the item whose weight is added to the weight of respective item, is
a) Cleats
b) Brackets
c) Bolts
d) All the above
45. The expected out turn for earth work in excavation in ordinary soil per workman per day is
a) 1.00 cum
b) 2.00 cum
c) 3.00 cum
d) 4.00 cum
46. The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is
a) 1.0 m3
b) 1.25 m3
c) 1.50 m3
d) 1.75 m3
47. The brick work is measured in sqmetre, in case of
a) Honey comb brick work
b) Brick flat soling
c) Half brick walls or the partition
d) All the above
48. The height of the sink of wash basin above floor level is kept
a) 60 cm
b) 70 cm
c) 75 cm to 80 cm
d) 80 cm
49. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is
a) 0.90 m3
b) 0.94 m3
c) 0.98 m3
d) 1.0 m3
50. Size, capacity and materials need be specified for
a) Bib-cocks
b) Stop-cocks
c) Ball valves
d) All the above
51. The expected out turn of half brick partition wall per mason per day is
a) 1.5 m3
b) 2.0 m3
c) 4.0 m2
d) 5.0 m2
52. The floor area includes the area of the balcony up to
a) 100 %
b) 75 %
c) 50 %
d) 25 %
53. The slope of the outlet of 'P trap' below the horizontal is kept
a) 8°
b) 10°
c) 12°
d) 14°
54. The weight of an item is measured correct to nearest
a) 0.25 kg
b) 0.50 kg
c) 0.75 kg
d) 1.0 kg
55. Berms are provided in canals if these are
a) Fully in excavation
b) Partly in excavation and partly in embankment
c) Fully in embankment
d) All the above
56. Estimating for any construction activity the two basic things are involved.
a) Quantity aspect
b) Quality aspect
c) Both a and b
d) None of the above
57.An estimate is a forecast of its probable cost. The process of preparing an estimate is known as
estimating and includes:
a) Taking out quantities
b) Abstracting
c) Both a and b
d) None of the above
58. How many types of estimations are used in construction.
a) 4
b) 6
c) 8
d) 2
59.Important factors for detailed estimate:
a) Availability of local labour
b) Availability of materials
c) Location of site
d) All the above
60.How many methods are used to found the approximate cost of a building,
a) 2
b) 4
c) 6
d) 8
61.Unit rate/ service unit method, indicates most important unit in a structure
Water tank - ?
a) Litre
b) Kilogram
c) Length
d) None of the above
62.Approximate cost of proposed building = Total area of all floors X ---- ?
a) Cost per Square Metre of a similar existing building
b) Area of the similar existing building
c) Both a and b
d) None of the above
63.Revised estimate is a detailed estimate for the revised quantities and rates of items of original
estimate. It is necessary due to the following reasons.
a) Sanctioned estimate likely to exceed more than 5%.
b) Expenditure of works exceed more than 10%.
c) Material deviations.
d) All the above
64. Annual maintenance and repair estimate includes,
a) Repair
b) Renewal
c) Replacement
d) All the above
65. The Metric System : For civil works the units which are commonly used are:
a) Metre(m) for length
b) Kilogram for Mass
c) Litre for Capacity
d) All the above units are correct
66. For P.C.C and R.C.C works, the unit of measurement in SI units
a) Sq.m
b) Cu.m
c) Kilogram
d) Litre
67.For Plastering works, the unit of measurement in SI units
a) Sq.m
b) Cu.m
c) Kilogram
d) Litre
68.For Steel reinforcement works, the unit of measurement in SI units
a) Sq.m
b) Cu.m
c) Kilogram
d) Quintal
69. Long wall and short wall method is also known as
a) Standard wall method
b) Separate or individual wall method
c) Centre line method
d) None of the above
70.In the center line method, Length =
a) Length = Total center line length – ½ width x number of junctions.
b) Length = Total length – width x number of junctions.
c) Length = Total height – ½ width x 2times the number of junctions.
d) None of the above
71. For Third Class Building, inside and outside walls shall be plastered with lime mortar and ?
a) Paint finish
b) Three coats of white wash
c) One coat of white wash
d) None of the above
72. For First class Building, foundation should be done, using
a) Cement concrete or brick blast
b) Brick blast
c) Brick foundation with mud mortar
d) None of the above
73. What are the materials used in Plain Cement Concrete (PCC)
a) Aggregates (Coarse, fine)
b) Cement
c) water
d) All the above
74.To make out an estimate for a work the following data are necessary-Drawing, Specification and
___________
a) materials
b) rates
c) labours
d) all the above
118. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per
minute, is taken
a) 1.80 litres for 5 to 10 users
b) 1.20 litres for 15 users
c) 1.35 for 20 users
d) All the above
119. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
a) 2.0 %
b) 2.5 %
c) 4.0 %
d) 5.0 %
120. The cost of the earthwork in excavation for the surface drain of cross-section shown in the given
figure for a total length of 5 metres @Rs. 450% cum, is
a) Rs. 400
b) Rs. 425
c) Rs. 450
d) Rs. 500
121. Anti-siphonage pipe is connected to
a) Main soil pipe
b) Bottom of P trap W.C.
c) Top of P trap W.C.
d) Side of water closet
125. The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length
L, is
a) L + 0.42 d
b) L + (2 × 0.42 d)
c) L – (0.42 d)
d) L – (2 × 0.4 d)
a) Detailed estimate
b) Revised estimate
c) Supplementary estimate
d) Rough cost estimate
129. Which soil will have the maximum permissible load per square metre?
a) Standard work
b) Work to specification
c) Target work
d) Test work
131. The estimated time required to complete an activity is known as
a) Duration
b) Restraint
c) Constraint
d) Float
132. Estimate for electric wiring that is light, fan, plug points etc. is usually made in terms of
a) 1%
b) 2%
c) 8%
d) 15%
134. Of the total estimated cost of a building sanitation and water supply works usually amount for
a) 1%
b) 2%
c) 8%
d) 15%
135. Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds
a) 2%
b) 2.5%
c) 4%
d) 5%
136. Careful taking up or down and removing carefully a structure without damage is termed as
a) Dismantling
b) Breaking
c) Rescheduling
d) Direction
137. Annual repair estimate is usually not allowed to exceed
a) 100 years
b) 80 years
c) 75 years
d) 40 years
141. The duet metal work is measured in
a) Running metres
b) Square metre on the basis of surface area
c) Cubic Metres
d) Kilograms
142.First class over burnt bricks are usually preferred for
a) Foundation
b) Super structure
c) Roofing
d) Road construction
143. Which of the following is overhead expenditure?
a) Woman's compensation, insurance etc.
b) Establishment
c) Stationery
d) Rent and taxes
144. In a detailed estimate the provision for contingencies is, usually
a) 1%
b) 3% to 5%
c) 10%
d) 12% to 15%
145. Which of the following is a machined cast iron component?
a) Bracket
b) Manhole cover
c) Fire door
d) Pulley
146.The value of a of the property, without being dismantled at the end of the useful life period as
known
a) Salvation value
b) Book value
c) Write of value
d) Junk value
147. A critical activity has
a) Zero float
b) Maximum float
c) Minimum float
d) Average float
148. Which roofing material will give the least expected life?
a) R.C.C.
b) Jack arch with L.C. terracing
c) Terraced roofing over stone flags
d) Country wood in work
149. Weight of one cubic meter of each of the following material is recorded. which one will be the
heaviest?
a) Earth ( ordinary )
b) Cement
c) Steel
d) Stone ballast
150. Which one is the waterproof cement point?
a) Snowcem
b) Supercem
c) Aquacem
d) All of the above
Answers:
1.d 2.d 3.a 4.d 5.a 6.d 7.d 8.d 9.c 10.d 11.d 12.c 13.d 14.b 15.d 16.d 17.d 18.d 19.d 20.d21.c
22.d 23.d 24.d 25.d 26.d 27.d 28.a 29.d 30.d 31.d 32.d 33.d 34.d 35.d 36.b 37.a 38.d 39.d 40.d
41.d 42.d 43.b 44.d 45.c 46.b 47.d 48. C 49.b 50.d 51.b 52.c 53.d 54.d 55.b 56.b 57.c 58.c 59.c
60.c 61.a 62.a 63.d 64.d 65.d 66.b 67.b 68.a 69.b 70.a 71.b 72.b 73.d 74.d 75.d 76.a 77.b 78.a
79.b 80.c 81.b 82.a 83.c 84.d 85.c 86.b 87.c 88.c 89.d 90.c 91.d 92.d 93.d 94.b 95.c 96.c 97.b
98.a 99.c 100.d 101.c 102.c 103.d 104.b 105.a 106.d 107.d 108.d 109.c 110c. 111.d 112.b 113.d
114.c 115.b 116.b 117.c 118.d 119.d 120.c 121.c 122.d 123.d 124.d 125.b 126.b 127.d 128.a
129.a 130.b 131.d 132.a 133.c 134.c 135.d 136.a 137.c 138.d 139.c 140.b 141.c 142.c 143.c
144.a 145.d 146.c 147.c 148.b 149.d 150.