Project Estimation Tool: Estimation Calculator Number of Days

The document provides an estimation tool to calculate the time and resources required for a project. It estimates that a single developer would take 368 man-days or 18.4 months to complete a project involving planning, design, development, testing, and implementation. Factoring in parallel development, testing, and integration, the total working days required is estimated to be 170 days or 8.5 months.

Uploaded by

Nishad
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views

Project Estimation Tool: Estimation Calculator Number of Days

The document provides an estimation tool to calculate the time and resources required for a project. It estimates that a single developer would take 368 man-days or 18.4 months to complete a project involving planning, design, development, testing, and implementation. Factoring in parallel development, testing, and integration, the total working days required is estimated to be 170 days or 8.5 months.

Uploaded by

Nishad
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Project Estimation Tool

Estimation Calculator Number of Days

Planning & BRD 10


INPUT

Wire framing 20
Database Designing & API Structuring 8
Estimated working Days 200

Single Man Development Cat 1 developer


Planning Phase 38
Design Phase 30
OUTPUT

Single Man days development 200


Testing 60
Project Implementation & integration 40
Possible Sprints Required 20
Possible Milestones required 10
Total Man days Required 368
Total Months Required 18.4
mation Tool
Count

# Pages Need UI Design 20


# Pages Need HTML Conversion 20

# of Cat 1 Developers 3 Master Data (dont Edit)


# of Cat 2 Developers 0 Standard Sprint Development time
# of Car 3 Developers 0 Standard Sprint testing Time
# of Testers required 1 Standard Implementation time
Standard days in months
Parallel Development Standard per page design
Planning Phase 38 Standard per page HTML Conversion
Design Phase 30 AVG sprint / milestone
Parallel Development 67
Testing 21 * per day productivity will be 6Hrs for calculation
Project Implementation & integration 14 * 2 popup will consider as 1 page for design
Possible Sprints Required 7 * per day 5 page wireframe can be done
Possible Milestones required 4
Total working Days Required 170
Total Months Required 8.5
Days
10
3
4
20
1
0.5
2

Hrs for calculation