SOP For Handling of Rejected Raw Material
SOP For Handling of Rejected Raw Material
1. PURPOSE:
The purpose of this SOP is to define Handling of Rejected Packaging Material.
2. SCOPE:
It is applicable to Store Department.
3. RESPONSIBILITY:
Production Manager, To implement the following procedure
Quality Assurance Manager, To assure the following procedure
Quality Assurance Officer, To follow and assure the following procedure
In charge Pharmacist, To follow and execute the following procedure
QC Manager, To Implement the following procedure
Page 1 of 6
Winthrox labouratories (Pvt) Ltd
Plot number:k-219-A,S.I.T.E. phase II
4. PROCEDURE
At the time of receipt, if material is received in damaged condition, store person shall
inform plant manager, QA, QC.
If material is rejected by QA department after inspection, store person shall transfer
the material in rejected under lock and key with label and fill the material discrepancy
report and inform to purchase department.
After getting instruction from purchase department, prepare the delivery Challan with
excise document and sent to supplier through transporter.
Page 2 of 6
Winthrox labouratories (Pvt) Ltd
Plot number:k-219-A,S.I.T.E. phase II
If purchase department instruct to destroy the material at site store person shall
destroy it in consultation with QA department and plant manager.
Store person shall enter details of rejected material in registered.
Store person shall prepare the destruction note and get approval from plant manager,
production manager, QA and QC before destroying the material.
The material shall be destroyed in presence of Quality Assurance, Stores and security
person.
Store person shall send copy of destruction to purchase department for raising debit
note.
Store person shall debit the entries of the rejected material and excise register and bin
cards rejected.
Page 3 of 6
Winthrox labouratories (Pvt) Ltd
Plot number:k-219-A,S.I.T.E. phase II
Page 4 of 6
Winthrox labouratories (Pvt) Ltd
Plot number:k-219-A,S.I.T.E. phase II
If material is rejected by QC department during retesting, store person shall ask for
rejection note from QC department and send it to purchase department for
information.
After getting instruction from purchase department, store person shall destroy the
material in consultation with QA department.
If the material is destroyed in factory premises store person shall enter details of
rejected material in registered.
Store person shall debit the entries of the rejected material and excise register and bin
cards rejected.
Page 5 of 6
Winthrox labouratories (Pvt) Ltd
Plot number:k-219-A,S.I.T.E. phase II
Production Manager
QC Manager
QA Manager
Working Area
Store Incharge
Page 6 of 6