Fin Report
Fin Report
1. PROJECT AT A GLANCE
2. COST OF PROJECT
4. FINANCIAL RATIOS – I
ANNEXURE I
Buildings
Factory Building 3.56 20.00 23.56
ANNEXURE I
Unsecured Loans/Deposits
PROMOTERS GROUP DEPOSITS 32.00 22.00 54.00
SHARMA GROUP DEPOSITS 6.00 8.00 14.00
Total Unsecured Loans/Deposits 38.00 30.00 68.00
ANNEXURE II
ANNEXURE VI
ANNEXURE V
ANNEXURE III