Essentials Quality Control Plan Sample
Essentials Quality Control Plan Sample
Plan Sample
Good for smaller projects and bid qualifications
Contact:
First Time Quality
410-451-8006
www.firsttimequalityplans.com
Pat
[CompanyName]
[CompanyAddress] • [CompanyPhone]
[ProjectName]
s
ge
[ProjectNumber]
Pa
Effective Date: [Date]
Approved
ct
_____________________________________________________
[QualityManagerName], Quality Manager
le
Se
s
Training ..................................................................................................................................................... 15
ge
F. Qualification of Third Party Inspection/Testing Companies and Subcontractors and Suppliers .......... 17
Page 2
Copyright
Questions? Call First Time Quality 410-451-8006
D. PROJECT QC PERSONNEL
[CompanyName] ensures that quality control personnel remain independent from the pressures of
production through our organizational lines of authority as defined by our QC Organization Chart.
The President appoints a Quality Manager, Superintendent, and Project Manager, and then assigns each
with specific quality responsibilities and authorities of their job position.
Table D-1
s
[PresidentName] President
ge
[ProjectManagerName] Project Manager
[SuperintendentName]
PaSuperintendent
The President has overall responsibility for implementation safety including performance and results of
the [CompanyName] Quality System, including quality on this project.
Se
QC personnel assigned to this project have the duties, responsibilities and authority defined by their job
position.
Key project personnel have accepted their appointments and declared their ability to carry out the
appointments.
QUALITY RESPONSIBILITIES
PROJECT QUALITY MANAGER: QUALITY DUTIES, RESPONSIBILITIES, AND AUTHORITY
The Quality Manager is responsible for ensuring the overall effectiveness of the Quality System for a
specific project. Regardless of other duties, the Quality Manager is responsible for:
• Planning project quality controls required by the [CompanyName] quality systems and contract
requirements
• Fully implementing all provisions of the [CompanyName] Quality System and related documents
on the project.
• Manage the operation of the [CompanyName] Quality System on the project.
Page 11
Copyright
Questions? Call First Time Quality 410-451-8006
s
• Verify implementation of corrective actions and preventive actions
ge
• Resolving quality nonconformances
The Quality Manager has the authority to:
• Pa
Stop work when continuing work may adversely affect quality or cover up a defect
• Prevent the use of equipment or materials that may adversely affect quality or cover up a defect
• To direct the removal and replacement of any non-conforming work, equipment, or material by
[CompanyName], any subcontractor, or any supplier.
• Suspend work and/or supply of materials by any staff member, subcontractor personnel, or
ed
A Superintendent verifies that work performed by subcontractors and suppliers and [CompanyName]
Se
work crews conforms to [CompanyName] quality standards. The President appoints one or more
Superintendents for each project.
• Ensuring that work meets government regulatory and code requirements, customer
requirements, contract requirements, contract technical specifications, contract drawings,
approved contract submittals, and company quality standards and specifications
• Ensuring that subcontractors and suppliers begin work in accordance with [CompanyName] start-
work policies
• Ensuring that subcontractors and suppliers receive a notice to work only when conditions will not
adversely affect quality results
• Conducting quality inspections, tests, and recording findings
• Accurately assessing subcontractor quality and on-time performance
• Ensuring that quality standards are achieved before approving subcontractor or work crew
completion of work
The Superintendent has the authority to:
Page 12
Copyright
Questions? Call First Time Quality 410-451-8006
• The initial task-ready inspection occurs when crews are ready to start work and ensures that
work begins only when it does not adversely impact quality results.
• Incoming material inspections verify that materials are as specified and meet all requirements
necessary to assure quality results.
• Work-in-process inspections continuously verify that work conforms to project specifications and
s
workmanship expectations. Work continues only when it does not adversely impact quality
ge
results.
• At completion of the Task, an inspection verifies that work, materials, and tests have been
completed in accordance with project quality requirements. When appropriate, functional tests
are performed. Pa
Inspection results are recoded and maintained as part of the project files.
The Quality Manager identifies special processes where the results cannot be verified by subsequent
inspection or testing and determines if continuous work in process inspections are required. For these
special processes, a qualified inspector continuously inspects the work process.
ct
Material quality inspections and tests ensure that purchased materials meet purchase contract quantity
and quality requirements.
Se
Page 22
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Daily Production Report
Project ID Project Name Preparer*/Date
[ProjectNumber] [ProjectName]
* On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting
period complies with the contract drawings and specifications to the best of my knowledge except as noted in this report.
Description
Job-ready and WIP Inspections
(Active work tasks)
s
Work Tasks Completion Inspections
ge
Sampling/Tests Performed
Nonconformance Reports
Pa
Problems encountered, actions taken,
problems, and delays
ed
Weather conditions
Temperature: Low: _____ F High:______F
Precipitation: ❑ No ❑ Yes, type and amount: ______________
Page 24
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Work Task Inspection Form
Work Task :
s
Compliance with work in process inspection
requirements
ge
Compliance with work task completion
inspection requirements
Compliance with inspection and test plan Pa
Production Notes:
Reported Nonconformances:
ed
* On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting
period complies with the contract drawings and specifications to the best of my knowledge except as noted in this report.
Page 25
Copyright
Questions? Call First Time Quality 410-451-8006
Then we expedite a corrective action that brings the workmanship or material issue into conformance by
repair, replacement, or rework. Previously completed work is reinspected for similar nonconformances.
In the event that we cannot correct the item to meet contract specifications, the customer will be notified
and customer approval of corrective actions is required before proceeding.
Fixing problems found is not sufficient. [CompanyName] systematically prevents recurrences to improve
quality. First enhanced controls and management monitoring are put into place to assure work proceeds
without incident. Then using a structured problem solving process, [CompanyName] identifies root
s
causes and initiates solutions. Solutions may involve a combination of enhanced process controls,
ge
training, upgrading of personnel qualifications, improved processes, and/or the use of higher-grade
materials. Follow-up ensures that a problem is completely resolved. If problems remain, the process is
repeated. Pa
Nonconformances and their resolution are recorded on a Nonconformance Report form. A
Nonconformance Report form exhibit is included in this subsection.
ed
ct
le
Se
Page 26
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName]
Nonconformance Report
Nonconformance Report
Control ID Project ID Project Name
[ProjectNumber] [ProjectName]
s
ge
Disposition
Pa
Customer approval signature /date: ___________________________________
ed
Corrective Actions
Corrective actions completed Name/Date:_________________________
Customer acceptance of corrective actions required? Yes No
ct
Name/Date:_________________________
le
Se
Preventive Actions
Page 27
Copyright
For More Information: