0% found this document useful (0 votes)
50 views

Hardware Interlocking and Functional Check Test Report - Feeder

This document summarizes the results of a hardware interlocking and functional check test on a circuit breaker. The test consisted of 18 steps checking the circuit breaker's status under different conditions. The circuit breaker was able to close in some test scenarios but not in others, depending on the specific conditions tested in each step. The test was witnessed and approved by representatives from the contractor and consultant companies.

Uploaded by

Jayaprakash M P
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views

Hardware Interlocking and Functional Check Test Report - Feeder

This document summarizes the results of a hardware interlocking and functional check test on a circuit breaker. The test consisted of 18 steps checking the circuit breaker's status under different conditions. The circuit breaker was able to close in some test scenarios but not in others, depending on the specific conditions tested in each step. The test was witnessed and approved by representatives from the contractor and consultant companies.

Uploaded by

Jayaprakash M P
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

PROJECT Contruction, Completion & Maintenance of 204 Villas, SWEIHAN, ALAIN.

CLIENT MUSANADA EQUIPMENT 11KV SWG. PANEL


END USER AADC FEEDER K02
CONSULTANT AL SUWEIDI
MAIN CONTRACTOR AL JABER BUILDING
SUB CONTRACTOR ALPHA POWER SCHEME NO
SUBSTATION No LOCATION AL SAAD

Hardware interlocking and functional check Test Report - feeder

1.CICUIT BREAKER - Q0:

OPERATIONAL
CONDITION

STATUS
OPERATION
STATUS

NO
INSERTEDMECHANICAL HANDLE

REMOTE/BCUOFF/LOCAL/
LOCKOUTK33

INTERMEDIATE
CB SPRING
K34 TCS

POSITION
Q1/Q5
F20
Q1

Q5

1 OFF OFF OFF H ON C OFF OFF L CLOSE POSSIBLE

2 OFF OFF ON H ON C OFF OFF L CLOSE NOT POSSIBLE

3 OFF OFF OFF U/H ON C OFF OFF L CLOSE NOT POSSIBLE


4 OFF OFF OFF H OFF C OFF OFF L CLOSE NOT POSSIBLE

5 OFF OFF OFF H ON DIS OFF OFF L CLOSE NOT POSSIBLE

6 OFF OFF OFF H ON C ON OFF L CLOSE NOT POSSIBLE


CLOSE
OPEN

7 OFF OFF OFF H ON C OFF ON L CLOSE NOT POSSIBLE

8 OFF OFF OFF H ON C OFF OFF 0 CLOSE NOT POSSIBLE

9 OFF OFF OFF H ON C OFF OFF R CLOSE NOT POSSIBLE

10 OFF ON OFF H ON C OFF OFF L CLOSE POSSIBLE


11 OFF ON ON H ON C OFF OFF L CLOSE NOT POSSIBLE

12 OFF ON OFF U/H ON C OFF OFF L CLOSE NOT POSSIBLE

13 OFF ON OFF H OFF C OFF OFF L CLOSE NOT POSSIBLE

14 OFF ON OFF H ON DIS OFF OFF L CLOSE NOT POSSIBLE

WITNESS/APPROVED
TESTED BY CONTRACTOR CONSULTANT
BY
COMPANY ALPHA POWER LLC ADDC
NAME
SIGNATURE
DATE
SAT Format fro Functional Checks Page 1 of 5
PROJECT Contruction, Completion & Maintenance of 204 Villas, SWEIHAN, ALAIN.
CLIENT MUSANADA EQUIPMENT 11KV SWG. PANEL
END USER AADC FEEDER K02
CONSULTANT AL SUWEIDI
MAIN CONTRACTOR AL JABER BUILDING
SUB CONTRACTOR ALPHA POWER SCHEME NO
SUBSTATION No LOCATION AL SAAD

15 OFF ON OFF H ON C ON OFF L CLOSE NOT POSSIBLE


16 OFF ON OFF H ON C OFF ON L CLOSE NOT POSSIBLE

17 OFF ON OFF H ON C OFF OFF 0 CLOSE NOT POSSIBLE

18 OFF ON OFF H ON C OFF OFF R CLOSE NOT POSSIBLE

STATUSOPERATIONAL
CONDITION
OPERATION
STATUS

NO
INSERTEDMECHANICAL HANDLE

REMOTE/BCUOFF/LOCAL/
LOCKOUTK33

INTERMEDIATE
CB SPRING
K34 TCS

POSITION
Q1/Q5
F20
Q1

Q5

1 ON OFF OFF H ON C OFF OFF L CLOSE POSSIBLE

2 ON OFF ON H ON C OFF OFF L CLOSE NOT POSSIBLE

3 ON OFF OFF U/H ON C OFF OFF L CLOSE NOT POSSIBLE


4 ON OFF OFF H OFF C OFF OFF L CLOSE NOT POSSIBLE
CLOSE
OPEN

5 ON OFF OFF H ON DIS OFF OFF L CLOSE NOT POSSIBLE

6 ON OFF OFF H ON C ON OFF L CLOSE NOT POSSIBLE


7 ON OFF OFF H ON C OFF ON L CLOSE NOT POSSIBLE

8 ON OFF OFF H ON C OFF OFF 0 CLOSE NOT POSSIBLE

9 ON OFF OFF H ON C OFF OFF R CLOSE NOT POSSIBLE

CONDITION
OPERATIO
NO STATUS OFF/LOCAL/ OPERATION STATUS
N
REMOTE
1 CLOSE OPEN L OPEN POSSIBLE

WITNESS/APPROVED
TESTED BY CONTRACTOR CONSULTANT
BY
COMPANY ALPHA POWER LLC ADDC
NAME
SIGNATURE
DATE
SAT Format fro Functional Checks Page 2 of 5
PROJECT Contruction, Completion & Maintenance of 204 Villas, SWEIHAN, ALAIN.
CLIENT MUSANADA EQUIPMENT 11KV SWG. PANEL
END USER AADC FEEDER K02
CONSULTANT AL SUWEIDI
MAIN CONTRACTOR AL JABER BUILDING
SUB CONTRACTOR ALPHA POWER SCHEME NO
SUBSTATION No LOCATION AL SAAD

2 OFF OPEN NOT POSSIBLE


3 R OPEN NOT POSSIBLE

Legend:
OFF Not operated/Open L Local
ON Operated/Closed R Remote
-- Not Applicable C Charged
Dis Discharge
U/H Unhealthy H Healthy

2 .DISCONNECTOR SWITCH - Q1:

STATUSOPERATIONAL
INSERTEDMECHANICAL HANDLE

COMPARTMENT

(SLR)REMOTEOFF/LOCAL/
HV CABLE
OPERATION

MCB F11
STATUS
NO

Q0

Q5

DOOR OPEN

1 OFF OFF ON OFF OFF LOCAL CLOSE POSSIBLE

2 ON OFF ON OFF OFF LOCAL CLOSE NOT POSSIBLE

3 OFF ON ON OFF OFF LOCAL CLOSE NOT POSSIBLE


CLOSE

6
OPEN

OFF OFF OFF OFF OFF LOCAL CLOSE NOT POSSIBLE

7 OFF OFF ON ON OFF LOCAL CLOSE NOT POSSIBLE

8 OFF OFF ON OFF ON LOCAL CLOSE NOT POSSIBLE

9 OFF OFF ON OFF OFF 0 CLOSE NOT POSSIBLE

10 OFF OFF ON OFF OFF REMOTE CLOSE NOT POSSIBLE

11 OFF -- ON OFF OFF LOCAL OPEN POSSIBLE


CLOSE

OPEN

12 ON -- ON OFF OFF LOCAL OPEN NOT POSSIBLE

13 OFF -- OFF OFF OFF LOCAL OPEN NOT POSSIBLE

WITNESS/APPROVED
TESTED BY CONTRACTOR CONSULTANT
BY
COMPANY ALPHA POWER LLC ADDC
NAME
SIGNATURE
DATE
SAT Format fro Functional Checks Page 3 of 5
PROJECT Contruction, Completion & Maintenance of 204 Villas, SWEIHAN, ALAIN.
CLIENT MUSANADA EQUIPMENT 11KV SWG. PANEL
END USER AADC FEEDER K02
CONSULTANT AL SUWEIDI
MAIN CONTRACTOR AL JABER BUILDING
SUB CONTRACTOR ALPHA POWER SCHEME NO
SUBSTATION No LOCATION AL SAAD

14 OFF -- ON ON OFF LOCAL OPEN NOT POSSIBLE

15 OFF -- ON OFF ON LOCAL OPEN NOT POSSIBLE

16 OFF -- ON OFF OFF 0 OPEN NOT POSSIBLE

17 OFF -- ON OFF OFF REMOTE OPEN NOT POSSIBLE

3.EARTH SWITCH – Q5 :
(SLR)REMOTEOFF/LOCAL/
HEALTHYMCB F20

OPERATIONAL
VOLTAGE (KA51)
OPERATION

FEEDER NO

STATUS
STATUS
NO

Q0

Q1

1 OFF OFF ON ON -- CLOSE POSSIBLE

2 ON OFF ON ON -- CLOSE NOT POSSIBLE


CLOSE
OPEN

3 OFF ON ON ON -- CLOSE NOT POSSIBLE


4 OFF OFF OFF ON -- CLOSE NOT POSSIBLE

5 OFF OFF ON OFF -- CLOSE NOT POSSIBLE


CLOSE

10 -- -- -- ON -- OPEN POSSIBLE
OPEN

11 -- -- -- OFF -- OPEN NOT POSSIBLE

4.MECHANICAL INTERLOCK

No. Switching Operational Status


Device

WITNESS/APPROVED
TESTED BY CONTRACTOR CONSULTANT
BY
COMPANY ALPHA POWER LLC ADDC
NAME
SIGNATURE
DATE
SAT Format fro Functional Checks Page 4 of 5
PROJECT Contruction, Completion & Maintenance of 204 Villas, SWEIHAN, ALAIN.
CLIENT MUSANADA EQUIPMENT 11KV SWG. PANEL
END USER AADC FEEDER K02
CONSULTANT AL SUWEIDI
MAIN CONTRACTOR AL JABER BUILDING
SUB CONTRACTOR ALPHA POWER SCHEME NO
SUBSTATION No LOCATION AL SAAD

1 Q1 (Open, Close/Open
Q0 OPEN Y11 ON Q5 OFF
Close) Possible
2 Q5 (Open, Close/Open
Q0 OPEN Y10 ON Q1 OFF
Close) Possible
3 Q5 Closed -- Mechanical -- Opening not
lever locked Possible

5.Circuit Breaker operation Mechanical Check:

No. Circuit Breaker Result


1 ON & OFF Operation carried out manually OK
2 ON Operation locked while spring charging OK
Contact position indicator, Spring charged indicator and
3 OK
switching cycle counter tested for correct function.
4 Spring charging by manual. OK

6.REMARKS:

WITNESS/APPROVED
TESTED BY CONTRACTOR CONSULTANT
BY
COMPANY ALPHA POWER LLC ADDC
NAME
SIGNATURE
DATE