Format Pile

The document is a joint record for piling work from Simplex Infrastructures for the construction of an International Ship Repair Facility project. It details the installation of one pile, including the location, type of pile, depths, quantity of rebar, and concrete poured. The total quantities installed include 4.95 metric tons of liner, 47.4 meters of boring, 823 kg of 8 mm rebar, 1,600 kg of 10 mm rebar, and 80 kg of 16 mm rebar, for a total rebar quantity of 11,024 kg and 55.25 cubic meters of concrete.

Uploaded by

Vijay Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views

Format Pile

The document is a joint record for piling work from Simplex Infrastructures for the construction of an International Ship Repair Facility project. It details the installation of one pile, including the location, type of pile, depths, quantity of rebar, and concrete poured. The total quantities installed include 4.95 metric tons of liner, 47.4 meters of boring, 823 kg of 8 mm rebar, 1,600 kg of 10 mm rebar, and 80 kg of 16 mm rebar, for a total rebar quantity of 11,024 kg and 55.25 cubic meters of concrete.

Uploaded by

Vijay Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COCHIN SHIPYARD LIMITED

TURNKEY WORK FOR THE CONSTRUCTION, SUPPLY, ERECTION AND COMMISSIONING OF


PLANT AND MACHINERY FOR INTERNATIONAL SHIP REPAIR FACILITY(ISRF)

JOINT RECORD FOR PILING WORK

TURNKEY WORKS FOR THE CONSTRUCTION, SUPPLY, ERECTION AND COMMISIONING OF PLANT & MACHINERY FOR
(a) Name of work :
ISRF PROJECT

(b) Situation : ISRF PROJECT SITE, CoPT

(c) Agency by which work executed : M/s SIMPLEX INFRASTRUCTURES LIMITED, KOLKATA

(d) Number and date of agreement or Work Order : INFRA/ISRF/100/2017 dt. 10.OCTOBER.2017
(e) Date of measurements : For the month of April-18
(g) Date of commencement of work : 17-NOVEMBER-2017
(h) Date of completion of work : Work in progress

Liner Date of Rebar Quantity in Kg Concrete


Sl. Liner Tip Terminatio Cut off Boring Concrete
Location Pile mark Pile Type EGL Quantity Liner Signature Signature Signature Quantity Date Signature
No. Level n Level Level (Rm) 8 mm dia 10 mm dia 12 mm dia 16 mm dia 20 mm dia 25 mm dia 28 mm dia 32 mm dia Total in MT Grade
(MT) Installation (Cum)

1 WSN E18 P1 1.4 -46 -46 2.85 4.947 08-Mar 47.4 823.00 1,600.00 - 80.00 8,521.00 - 11024 M-40 55.25

TOTAL QUANTITY 4.95 47.40 - - 823.00 1,600.00 - 80.00 8,521.00 - 11,024.00 55.25

Page 1 of 1