Day : Tuesday
Date : 04.01.2021
Department : Electrical
Tasks Done by Today
1
Painting HDG Steel Conduit
2
Engineering : Quantity and method scaffolding survey for Electrical Works for T09 and Conveyor 501 & 503 Walkway
3
Cable Ladder and Supports installation in level : 36.135 for convoyer 51-29-502
4
Engineering : Follow up with Volt Automation to finalize Dedusting Pending Items
5
IMD For Earthing Busbar and Conduit Clamp.
6
1
Soil Resistivity Internal test to proceed in Earthing work.
2
Engineering: Follow up with Volt Automation to finalize Junction Box Fat Test And Dedusting
3
Painting Conduits Accessories.
4 I&C Cable Ladder Installation.
5