Automated Corridor Lighting Control System: Mohammed Ahmed and Jemal Worku

This document summarizes an automated corridor lighting control system designed to make lighting more energy efficient. The system uses a programmable logic controller (PLC) to autonomously switch lights on and off based on the presence of people, as detected by push buttons at the entry and exit points of corridors. The light will turn on when the first person enters and remains on until the last person exits, at which point the light will turn off. This saves energy by avoiding unnecessary lighting when corridors are unoccupied.

Uploaded by

John Flavian
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views

Automated Corridor Lighting Control System: Mohammed Ahmed and Jemal Worku

This document summarizes an automated corridor lighting control system designed to make lighting more energy efficient. The system uses a programmable logic controller (PLC) to autonomously switch lights on and off based on the presence of people, as detected by push buttons at the entry and exit points of corridors. The light will turn on when the first person enters and remains on until the last person exits, at which point the light will turn off. This saves energy by avoiding unnecessary lighting when corridors are unoccupied.

Uploaded by

John Flavian
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

IOSR Journal of Electrical and Electronics Engineering (IOSR-JEEE)

e-ISSN: 2278-1676,p-ISSN: 2320-3331, Volume 11, Issue 4 Ver. III (Jul. – Aug. 2016), PP 29-33
www.iosrjournals.org

Automated Corridor Lighting Control System


Mohammed Ahmed1 and Jemal Worku2
Jimma Institute of Technology, Jimma, Ethiopia

Abstract: The Paper is aims to design a corridor lighting control system to make the system autonomous and
energy saving. Automatic switching on/off of lights is working as per the presence of people in the building
corridors.Push buttons are strategically placed to the entry and exit of the people. Depending on the number of
people passing through the counter goes up/down and stores the corresponding value in the register which is
referred to by the comparator which controls the tripping of the lighting circuit accordingly. The light will come
on when the first person enters the corridor and does not switch off until the counter value drops to 0.

I. Introduction
The need of electricity is increasing as the population and industrialization growing. The design of
private buildings, street lines, factories and commercial buildings lighting system are doing as per the national
and international standard codes. In some cases, the design of building lighting system is not considered the
specific application of a building. This will leads the customer for over power consumption and power loss.
In Ethiopia, inappropriate consumption of power is common in the commercial institutions such as
universities, collages, health centers, factories and others. They are powering ON street lights, corridor lights,
and office and class room lights for a long time when a human is not available. It results not only the institution
to pay money for misused powers but also it limits power suppliers to satisfy and reach more customers.
Recently, Green issue has been raised as a hot topic where most of the researchers and engineers are
involving themselves in finding a solution to reduce the energy usage at the same time increasing their product
efficiency. Smart control systems have being assisting and implemented in different sector of developed world.
People are told to turn OFF the lights when are not in use – one of the best way to save energy. These
days, many buildings of developed countries are integrated with automated lighting where people do not even
have to toggle the switch to save energy. With the aid of automated lighting, the lights are turn ON if there is
person in the room and turn OFF when there is none - close loop control system. Some of the smart lighting
systems are add-on with the extra feature where it will control the lights luminance correspond to the ambient
lights. This method is uncommon in most of the buildings today and thus there is a big opportunity to save more
energy with the smart lighting system.
The most common form of electric lighting control is the on/off "toggle" switch. Other forms of
lighting control include occupancy sensors, daylight sensors, clock switches, a variety of manual and automatic
dimming devices, and centralized controls. The selection of sensor and type of lighting control depends on the
application and the area where it is used [1].
This system can effectively work in areas where electricity is excessively used especially, during night
time in corridors of hostels, hospitals etc. The proposed PLC based system will remain OFF when there is no
presence of human being and will activate [2, 4] upon the arrival of human being in specified area. This
presence will be detected by push button at input side. One of the biggest utility concerns is the fact that by
detecting the presence of person whenever enters in the area of corridor of premises, the tube light will remain
in ON state, otherwise it will remain OFF. The switching action of tube light will take place by using relay. The
staircase timer allows reduction of energy spent for lighting [6]. Instead of having the staircase and corridors
permanently light, the lighting is reduced to a pre-defined amount of time after one of the push-buttons
connected to the timer is pressed. Energy efficient corridor illumination in commercial and residential buildings
is becoming increasingly important in the energy conservation era.
Now a day, Jimma Institute of Technology building lighting control system is manually switching ON
and OFFthe switches that are belonged at the wall of the buildings by the users. Most of the time, corridor light
and class room light fittings are operating without the human is not available [3]. Many corridors light operate
24 hours a day, 365 days a year and typically have very low occupancy rates. This problem will reduce the life
of light fittings, power loss, over power consumption and more meter reading [15, 16].

II. Methodology
Ladder logic programming looks similar to the wiring diagram of the electromechanical relay-based control
circuits that PLCs replace.

DOI: 10.9790/1676-1104032933 www.iosrjournals.org 29 | Page


Automated Corridor Lighting Control System

Fig. 1. Block Diagram of Power Management Using PLCs

A PLC is a digital operating electronic apparatus which uses a programmable memory for internal
storage of instruction for implementing specific function such as logic, sequencing, timing, counting and
arithmetic to control through analog or digital input/output modules various types of machines or process. There
are different types of PLC’S used for various applications. In the present work, an XD 26 PLC [5, 15] is used to
control the Smart corridor Lighting System because of its user friend and expandable features.

III. PLC Principle of Operation


Most PLCs on the market are microprocessor-based circuits. These PLCs read the status of all the
inputs (i.e., switches) and then execute the user-written ladder logic program to determine the final update for
the outputs (i.e., bulb).
The PLC inputs are isolated and level translated using opto-isolators and connected to the ports of the
microcontroller. The PLC outputs are connected to buffers and relays to enable connecting the same to output
elements as shown in the picture below. Different control techniques have been proposed for street lighting
controller during seasonal variation. It is common to use relays to make simple logical control decisions. The
relays allow power to be switched on and off without a mechanical switch. The development of low cost
computer has brought the most recent revolution, the Programmable Logic Controller (PLC).With the advent of
the PLC; it has become the most common choice for manufacturing controls. A PLC is a digital operating
electronic apparatus which uses a programmable memory for internal storage of instruction for implementing
specific function such as logic, sequencing, timing, counting and arithmetic to control through analog or digital
input/output modules various types of machines or process. There are different types of PLC’S used for various
applications. In the present work, an XD 26 PLC is used to control the Smart corridor Lighting System [8 – 11].
PLCs are typically chosen for small discrete applications where high level ruggedness and reliability is
required. They offer high speed sequential and logical control capabilities and are very good control solutions
for real time applications. A PLC retains its operating system, user programs, and some data in retentive
(nonvolatile) memory. PLC has not only replaces the relay but ha Nowadays computer control and information
system technology is applied widely in most of the process industry, because it may produce significant
technical and economic benefits. Process control information systems assist operating personnel in producing
the required output of products with minimum quality variations, least consumption of the raw material and
energy, and maximum efficiency. Centralization process control combined with increased mechanization has
resulted in improved productivity [1]. Now a day’s advanced control systems like PLCs are extensively used in
the industries.
In the present work, an XD 26 PLC [5, 15] is used to control the Smart corridor Lighting System. The
numbering for the XD 26 PLC is given in such a way that as it is having sixteen Digital of which six are analog
inputs and ten discrete static relay outputs. Every PLC has associated programming software that allows the user
to enter a program into the PLC. Before a PLC can perform any control task, it must be programmed to do so.

DOI: 10.9790/1676-1104032933 www.iosrjournals.org 30 | Page


Automated Corridor Lighting Control System

Fig. 2.Electrical Circuit Wiring Diagram

Fig. 2 shows the control implemented as a wiring diagram using two switches (switch 1 is in parallel
with switch 2 is installed staircase) and a light bulb.
Switch 1 and Switch 2 are in the OFF position in Fig. 3. The Timer T009 should be adjusted first by the
persons. If the Switch 1 is actuated, then the upper circuit will switch ON the bulb, then timer has to be count
until it stops its adjusted value and makes the Light to be OFF. Here the two push buttons are connected in
parallel to operate in OR gates. This is used to give different service for more than one person. When another
person is come in the same direction before the first light is OFF, the person should press the next push button to
get light or switched Off the light, the timer makes the light switched OFF until it reaches its adjusted value
Switch 2 is actuated it will open the upper circuit and close the bottom circuit. However, switch 1 is already
open at the bottom circuit, so the bulb will not glow. Actuating switch 1 again will close the bottom circuit and
the bulb will glow.

Fig. 3. Simulation Result for One Section

DOI: 10.9790/1676-1104032933 www.iosrjournals.org 31 | Page


Automated Corridor Lighting Control System

Fig. 4.Simulation Result for Second Section

Fig. 5. Simulation Result for Third Section

Fig. 6.Simulation Result for Section Four


DOI: 10.9790/1676-1104032933 www.iosrjournals.org 32 | Page
Automated Corridor Lighting Control System

Fig. 4.the Timer T005 and push button I6 to I10 designed for the second section of the building. When
the person wants to enter the corridor, the same principle can be applied to switch ON the light to section one.
To switch ON or OFF the light, the Timer should be adjusted at once. Then, the person can use either of push
button to switch ON or OFF the light, If one push button is closed or pressed the light will be glow and the
timer switched of the light when it reaches its final adjusted value.
Timer T013 and push button I11 to I15 designed for the third section of the building, the principle is the
same with section one and two as shown Fig. 5. The Timer T003 and push button I16 to I20 are designed for the
fourth section of the building and principles works the same with above, But different person come at different
direction in these case the designed circuit holds good in Fig. 6.
Generally, the electric power is saved by using timer and push button which is integrated with
programmable logic controller.

IV. Energy saving Using PLC


The four existing corridor light sources (T16 tube light of 40W) have working for 12hrs per day. In
one corridor there are 4 fixtures each has 4 fluorescent, the power wattage for one fluorescent is 40W.
Therefore, the total power wattage for one corridor is 640W and 2803.2 KWH per year.
The light in the corridor are kept ON for 12 hours in a day and 365 days in a year with the unit energy
cost of electricity, 0.25 cents per kwh. The annual energy cost of lighting for a single corridor of a wing is 480
Birr/year.In Varnerobuilding of ground floor wing 1, there are 5 corridors and floors. Therefore, the total cost of
corridor light of the whole building having four wings is 48000 Birr/year.

V. Conclusion
The proposed controller gives fast, reliable, and power efficient smart lamp switching based on the
need of the person. The simulated results are also verified experimentally by using push button, timer which
controls the light. It turns out most reliable and time efficient way to switch ON/OFF corridor lights. It provides
an effective measure to save energy by preventing unnecessary wastage of electricity, caused due to manual
switching or lighting of corridor lights when it is not required. The system is versatile, extendable and totally
adjustable to user needs. The developed lighting control system is needs a simple modification to fit in existing
wiring setup.

References
[1]. E. El-Shirbeeny,“Proposal for Automating Street Lighting System of Abu Dhabi/AI Ah highway”, EPRL01-1, ADWEA, Abu
Dhabi, UAE, 2001.
[2]. Pantoni R.P.,Brandao, D., "A geocast routing algorithm intended for street lighting system based on wireless sensor networks”, 9th
IEEE/IAS International Conference on Industry Applications (INDUSCON), 2010, pp. 1 – 6.
[3]. Reluz Program, "National Program of Efficient Public Lighting and Traffic Lights".Available:http://www.eletrobras.gov.br/EM-
Programas-Reluz,Jan. 2010.
[4]. Ei-Shirbeeny, E.H.T.; Bakka, M.E. “Experimental Pilot Project for Automating Street Lighting System in Abu Dhabi Using Power
Line Communication”. Proceedings of the 10th IEEE International Conference on Electronics, Circuits and Systems, Vol. 2, p.743 -
746, Dec. 2003.
[5]. Sungkwan C.,Dhingra, V. “Street lighting Control Based on Lon Works Power Line Communication Power Line Communications
and Its Applications”, IEEE Symposium, 2008.
[6]. JayashriA.Bangali, ArvindD.Shaligram,“Energy Efficient Lighting Control System Design For Corridor Illumination”, International
Journal of Scientific &Engineering Research, Vol. 3, Issue 4, April-2012, and ISSN 2229-5518.
[7]. G.W. Barriquello, C.H. Campos, A. Do Prado, “An Intelligent System for Street Lighting Monitoring and
Control”,CongressoBrasileiro de Eletronica de Potenci, Brazil, Bonito, 2009.
[8]. Caponetto R., DongolaG., Fortuna L., Riscica N. and ZufacchiD., “Power Consumption Reduction in A Remote Controlled Street
Lighting System”, International Symposium on Power Electronics, Electrical Drives, Automation and Motion (SPEEDAM 2008),
Ischia, June 2008, pp. 428-33.
[9]. Chen, P.-Y., Liu, Y.-H., Yau, Y.-T. and Lee, H.-C., “Development of Energy Efficient Street Light Driving System”, IEEE
International Conference on sustainable Energy Technologies (ICSET 2008), Singapore, Nov. 2008, pp. 761
[10]. Chung, H.S.H., Ho, N.M., Hui, S.Y.R. and Mai, W.Z., “Case Study of a Highly-Reliable Dimmable Road Lighting System with
Intelligent Remote Control”, European Conference on Power Electronics and Applications, Dresden, 2005.
[11]. E. El-Shirbeeny, "Pilot Project Far Using Power Line Communications in Controlling Street Lighting Report”, EPRL01-21,
ADWEA, Abu Dhabi, UAE, 2001.
[12]. PantoniR.P.,Brandao D., “A Confirmation-Based Geocast Routing Algorithm for Street Lighting System”, Industrial Electronics
(ISIE), 2011 IEEE International Symposium on, On page(s): 841 - 846
[13]. Reinhard M. and Andreas R.,“An Energy Efficient Pedestrian Aware Smart Street Lighting System”, International Journal of
Pervasive Computing and Communications, Vol. 7, No. 2, 2011, pp. 147-161
[14]. Wang C., Zhang D.L., Qin H.L. et al., “HPS Street Lighting Lamp Networking over Power-lines”, PowerCon 2006, International
Conference on Power System Technology, Oct. 22-2 , Page(s): 1 – 5.
[15]. Li-Ling Wang, Hong-Ying Wei, “Development of a distributed control system for PLC-based Applications”, International
Conference on Machine, 2010, Vol. 2, Page(s): 906 – 909.
[16]. Mohammed Ahmed, GezahegnShituneh, et al., “Contingency Analysis of Ethiopia’s 230 kV Transmission Network”, International
Journal of Engineering Technologies,Vol. 1, No. 4, 2015.

DOI: 10.9790/1676-1104032933 www.iosrjournals.org 33 | Page