0% found this document useful (0 votes)
193 views

Foundry Log Sheet - Mar'16

The document is a production data sheet from the re-melt shop of S.P. Metals Udyog for the month of November 2019. It shows that a total of 49,181 kg of OK log was input, with 5,800 kg of dross produced and a melting loss of 48,715 kg. Fuel oil used was 6,696 kg with a consumption rate of 136 kg/MT.

Uploaded by

Raj Kumar Giri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
193 views

Foundry Log Sheet - Mar'16

The document is a production data sheet from the re-melt shop of S.P. Metals Udyog for the month of November 2019. It shows that a total of 49,181 kg of OK log was input, with 5,800 kg of dross produced and a melting loss of 48,715 kg. Fuel oil used was 6,696 kg with a consumption rate of 136 kg/MT.

Uploaded by

Raj Kumar Giri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

S. P.

METALS UDYOG
Production Data Sheet
Dept: Re-melt Shop
Month : November 2019

OK Log F.O.

End Time
Start Time
Pure Local Pure Mn Total Free Tundish Pit Total Input to
Prime Imported Si Master Dross in full Rejection Total Log Dross Melting F.O Consum
Date Cast No Alloy Wire Scrap Mg Discard Master RCM Input Iron Metal metal output output diff
Ingot (Kg) Scrap Alloy(LM-6) Ingot length (Kg) (Kg) (Kg) loss (kg). (Kg) ption
(Kg) (Kg) Ingot Alloy (Kg) (Kg) (Kg) (Kg) (kg) (kg)
(Kg) (Kg/MT)

02.11.2019 - 5088 - 5,088 534 - (5,622) - - 396.00 78 6:35 12:24


19.03.16 - 6000 6,000 504 (6,504) - - 840.00 140.00 16:00 2:10
20.03.16 - 6,048 6,048 504 (6,552) - - 728.00 120.37 18:30 1:20
25.03.16 - 4,848 4,848 860 (5,708) - - 840.00 173.27 23:00 1:20

27.03.16 - 5,412 5,412 508 (5,920) - - 952.00 175.91 18:00 8:00


28.03.16 - 5,382 5,382 886 (6,268) - - 784.00 145.67 18:05 7:20

29.03.16 - 5,382 5,382 834 50 6,266 - 700.00 130.06 18:20 8:00


30.03.16 - 5,428 5,428 623 (6,051) - - 756.00 139.28 18:10 5:00
31.03.16 - 5,593 5,593 547 (6,140) - - 700.00 125.16 18:30 3:40
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
Total - - - - - - - - - - - 49,181 - 49,181 5,800 - - - (48,715) 6,266 - 6,696 136.15

1 Prime Ingot - Kg
2 Pure Wire - Kg
3 Imported Scrap - Kg
4 Local Scrap - Kg
5 Pure Mg. Ingot - Kg
6 Silicon Master Alloy - Kg
7 Copper Master Alloy - Kg
8 Mn Master Alloy - Kg
9 Dross Ingot - Kg
10 RCM - Kg
11 OK Log in full length 49,181 Kg
12 Rejection - Kg
13 Dross 5,800 Kg
14 Free Iron - Kg
15 Tundish Metal - Kg
16 Pit Metal - Kg
17 Melting Loss (48,715) Kg
18 F.O. Used 6,696.00 Kg
19 F.O. Consumption 136 (Kg/MT)
20 Dross Qty (Kg) 5,800 Kg
21 Dross #DIV/0! %
Coveral -11

Recovery
Coveral-5
Dross

Tibal
Tibon
Total Break Remarks
(%)

19:40 0:00 #DIV/0! #DIV/0!

10:10 0:00 5 3 #DIV/0! #DIV/0!

6:50 5 5 3 2 #DIV/0! #DIV/0!

2:20 5 5 3 2 #DIV/0! #DIV/0!

14:00 5 5 3 2 #DIV/0! #DIV/0!

13:15 5 5 3 2 #DIV/0! #DIV/0!

13:40 5 5 3 2 #DIV/0! #DIV/0!

10:50 5 5 3 2 #DIV/0! #DIV/0!

9:10 5 5 3 2 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

22:19 40 35 24 14 #DIV/0! #DIV/0!


JJ EXTRUSION PVT. LTD.
Production Data Sheet
Dept: Re-melt Shop
Month : April'16

OK Log F.O.

End Time
Start Time
Pure Local Pure Mn Total Free Tundish Pit Total Input to
Prime Imported Si Master Dross in full Rejection Total Log Dross Melting F.O Consum
Date Cast No Alloy Wire Scrap Mg Discard Master RCM Input Iron Metal metal output output diff
Ingot (Kg) Scrap Alloy(LM-6) Ingot length (Kg) (Kg) (Kg) loss (kg). (Kg) ption
(Kg) (Kg) Ingot Alloy (Kg) (Kg) (Kg) (Kg) (kg) (kg)
(Kg) (Kg/MT)

- - - - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!

- - - - - #DIV/0!
- - - - - #DIV/0!

- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
- - - - - #DIV/0!
Total - - - - - - - - - - - - - - - - - - - - - - #DIV/0!

1 Prime Ingot - Kg
2 Pure Wire - Kg
3 Imported Scrap - Kg
4 Local Scrap - Kg
5 Pure Mg. Ingot - Kg
6 Silicon Master Alloy - Kg
7 Copper Master Alloy - Kg
8 Mn Master Alloy - Kg
9 Dross Ingot - Kg
10 RCM - Kg
11 OK Log in full length - Kg
12 Rejection - Kg
13 Dross - Kg
14 Free Iron - Kg
15 Tundish Metal - Kg
16 Pit Metal - Kg
17 Melting Loss - Kg
18 F.O. Used - Kg
19 F.O. Consumption #DIV/0! (Kg/MT)
20 Dross Qty (Kg) - Kg
21 Dross #DIV/0! %
Coveral -11

Recovery
Coveral-5
Dross

Tibal
Tibon
Total Break Remarks
(%)

0:00 0:00 #DIV/0! #DIV/0!

0:00 0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 #DIV/0! #DIV/0!

0:00 - - - - #DIV/0! #DIV/0!

You might also like