0% found this document useful (0 votes)
165 views

+MK2 - Existing Modification PDF

Uploaded by

LeTung95
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
165 views

+MK2 - Existing Modification PDF

Uploaded by

LeTung95
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 50

1 2 3 4 5 6 7 8

FINAL 17-07-2009 FINAL DRAWING

04 30-06-2009 For Approval

02 02-04-2009 For Approval

01 16-03-2009 For Approval

00 05-03-2009 For Approval

Rev. Date (dd/mm/yyyy) Revision Description Drawn Checked Approved

110KV vinh tuong substation


exTENsion (transformer No. 2)

Project No.
EDHP
P09-006
Material

Classification / symbol Mass ( Kg )

Title

modification & EXTENSION


EXISTING MARSHALLING KIOSK - MK2
Drw number Revision Nr. of sheets

50
000
0
1 2 3 4 5 6 7 8

REVISION REVISION
SHEET DESCRIPTION SHEET DESCRIPTION
00 01 02 03 04 05 00 01 02 03 04 05

00 Sheet index - -

A-01 Drawing's list - -

A-02 Primary equipment's list - -

B- Single line diagram - -

C-01 CB, DS heatings - -

C-02 CB, DS motor drivers - -

C-03 Power Supply for CB relays - -

C-04 CB tripping - -

C-05 CB closing - -

C-06 Control DS - -

C-07 Control ES - -

C-08 CB, DS, ES state for discrepancy indication - -

C-09 CB, DS, ES state for scada - -

C-10 Signalling for annuciator - -

C-11 Interlocking for CB, DS, ES operation - -

C-12 Interlocking for CB, DS, ES operation - -

C-13 Interlocking for CB, DS, ES operation - -

C-14 Interlocking for CB, DS, ES operation - -

C-15 Current circuit - -

C-16 Current circuit - -

- - -
-

- - -
-

- - -
-

- - -
-

- - -
-

- - -
-

- - -
-

- - -
-

- - -
-

- - -
-

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E03/E01

EDHp
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110kv vinh tuong substation modification & extension + S1

02 02-04-2009 CHECKER Do Minh Viet of EXISTING MARSHALLING KIOSK - MK2 Dwg number Page 1

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 drawing's List A-000-000-1 2 pages
1 2 3 4 5 6 7 8

BILL OF PRIMARY EQUIPMENT

EQUIPMENTS ID DESCRIPTION QUANTITY REFERENCE BRAND

T1 Existing power transformer No. 1 01 - -

QF60 Existing CB - E04 bay (110kV side of transformer T1) 01 - -

QL13, QL14 Existing DSs - E04 bay (110kV side of transformer T1) 02 - -

QE13-1, QE13-2, QE14-1 Existing ESs - E04 bay (110kV side of transformer T1) 03 - -

CT-E04 Existing CT - E04 bay (110kV side of transformer T1) 01 - -

VT3 Existing busbar VT - E04 bay (110kV side of transformer T1) 01 - -

QL11, QL31 Existing DSs - E01 & E03 bays (two 110kV line feeders) 02 - -

QE11-1,QE11-2,QE31-1,QE31-2 Existing ESs - E01 & E03 bays (two 110kV line feeders) 04 - -

VT1, VT2 Existing line VTs - E01 & E03 bays (two 110kV line feeders) 02 - -

QF20 Existing CB - E02 bay (110kV buscoupler) 01 - -

QL21, QL22 Existing DSs - E02 bay (110kV buscoupler) 02 - -

QE21-1, QE22-1 Existing ESs - E02 bay (110kV buscoupler) 02 - -

CT-E02 Existing CT - E02 bay (110kV buscoupler) 01 - -

T2 In this project - power transformer No. 2 01 - -

QF50 In this project - CB - E05 bay (110kV side of transformer T2) 01 - -

QL51, QL52 In this project - DSs - E05 bay (110kV side of transformer T2) 02 - -

QE51-1, QE51-2, QE52-1 In this project - ESs - E05 bay (110kV side of transformer T2) 03 - -

CT-E05 In this project - CT - E05 bay (110kV side of transformer T2) 01 - -

VT4 In this project - busbar VT - E05 bay (110kV side of transformer T2) 01 - -

QF10, QF30 In this project - CBs - E01 & E03 bays (two 110kV line feeders) 02 - -

QL12, QL32 In this project - DSs - E01 & E03 bays (two 110kV line feeders) 02 - -

QE12-1,QE12-1,QE32-1,QE32-2 In this project - ESs - E01 & E03 bays (two 110kV line feeders) 04 - -

CT-E01, E03 In this project - CTs - E01 & E03 bays (two 110kV line feeders) 02 - -

Nguyen Xuan Quynh Project


APPROVER Drawing name Date =

EDHp
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110kV vinh tuong substaion basic design
+ BASIC
Dwg number Page 2
02 02-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 PRIMARY EQUIPMENT's List A-000-000-2 2 pages
1 2 3 4 5 6 7 8

VIET TRI BUS COUPLER VINH YEN

=E03 =E02 =E01


cvt-123kv
110 0.11 VT2 VT1
0.11kv
3 3
QE32-2 QE12-2

QL32 QL12
m m
DS+2ES: 123KV-1250A-25KA/3S

DS+1ES: 123KV-1250A-25KA/3S

DS+1ES: 123KV-1250A-25KA/3S
QE32-1 QE12-1

CB: 123KV-1250A-25KA/3S
CT: 123KV

200-400-600-800/1-1-1-1A
200-400-600-800/1-1-1-1A

QF30 QF10
CB: 123KV-1250A-25KA/3S

CT: 123KV
QE31-1 QE11-1

DS+2ES: 123KV-1250A-25KA/3S QL31 QL11


m m

m m

QE31-2 QF20 QE11-2


BUSBAR 110KV QL22 QL21

DS+1ES: 123KV-1250A-25KA/3S
QL52
m =E05 QE22-1 QE21-1 =E04 QL14
m

VT4 VT3

QE52-1 QE14-1
cvt-123kv cvt-123kv
CT: 123KV 110 0.11 110 0.11
200-400-600-800/1-1-1-1A 0.11kv 0.11kv
3 3 3 3

QF50 QF60
CB: 123KV-1250A-25KA/3S
QE51-1 QE13-1

DS+2ES: 123KV-1250A-25KA/3S QL51 QL13


m m

QE51-2 QE13-2

t2 t1
H.BCT 200-400-600/1/1/1A

200-400/1A 200-400/1A
T2 -20/25MVA
115±9x1,78%/23/6.3kV 35kv
ONAN/ONAF 400/1A
YN/YN/(D)-0-11
200-400-600
/1/1A

L.BCT 600-800/1/1A
400-600-800/1/1A

22kv busbar 22kv busbar


600-800-1200/1-1-1A

400-600-800/1-1-1A
200-400-600/1-1-1A

QF 22KV 1600A-630A-16KA/1S Q0 Q0
200-400/1-1A

200-400/1-1A

200-400/1-1A

200-400/1-1A

200-400/1-1A

200-400/1-1A

200-400/1-1A

200-400/1-1A
CT 600-800-1200/1/1/1A vt-22kv vt-22kv
22 0.11kv 22 0.11kv
3 3 3 3
CT 200-400/1-1A Legend:
Q8

=j15 =J14 =J13 =J12 =J11 j10 =J09 =j08 =J07 j06 =J05 =J04 =J03 =J02 =J01 EXITING
This project

Nguyen Xuan Quynh Project


APPROVER Drawing name Date =

EDHp
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110kV vinh tuong substaion SINGLE LINE DIAGRAM
+ BASIC
Dwg number Page 1
02 02-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 drawing's List B-000-000-1 1 pages
1 2 3 4 5 6 7 8

=E01-QF10 HEATING & LIGHTING =E01-QL12 HEATING


B¶n vÏ: VT-MK2/L03-1 (VIET A)
E3-NT-MK2/L03-1 (ELECO)

XAC

XAC 1

11

X100 X100
4

5
1

=HV_STATION+E01
TB1:19

TB1:21

=E01-hv station
1

QF10 DS QL12

H
PE
2

IL

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 1

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB, DS heatings C-000-000- 1 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

AC DISTRIBUTION PANEL
=AC_EXISTING
+(EXISTING)
=E01-QF10 MOTOR DRIVE =E01-QL12 MOTOR DRIVE
B¶n vÏ sè: VT-ACDB/S05-2
L N
XA16
1 2

XDC

XDC 5

10

B¶n vÏ: VT-MK2/L03-2 (VIET A)


1 3

E3-NT-MK2/L03-2 (ELECO)
F..

2 4
26 25

X311

CONTROL PANEL
=CP2+E01

=E01+CP2 (EXISTING)
Note: X100 X01 X01

2
1
AC MCB & terminals for
Power supply of QF10 motor
at CP2 panel
must be newly added =HV_STATION+E01
TB1:17

TB1:18

=E01-hv station
MCB1

QF10 LS
QL12 M

6
PE

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 2

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB, DS motor drivers C-000-000- 2 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

=CP2+E01

CONTROL PANEL
=E01+CP2 (EXISTING) POWER SUPPLY POWER SUPPLY
AUTO CHANGE OVER FOR CB RELAYS

B¶n vÏ: VT-CP2/M01-1


X1 X311

1
1L1+/4.4
3

X1 X311

3
9

1
X300

TB1:7
=HV_STATION+E01

GL312F1P

=E01-hv station
5 1 3
QF10
P1 P2 P2
6 2 4

A2 A3 A4

TB1:8

4
2

3
X300 X300 X300

B¶n vÏ: VT-CP2/L01-1


B¶n vÏ: VT-CP2/M01-1
X1 X311
2

1L1-/4.1
24

X1 X311
4

1L2-/4.6
10

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 3

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Power Supply for CB relays C-000-000- 3 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

=PP2+E01 =CP2+E01 =PP2+E01

TRIP 1 TCS 1 REMOTE OPEN LOCAL OPEN TRIP 2 TCS 2

=E01+CP2 (EXISTING)
protection panel
=E01+PP2 (EXISTING)

protection panel
=E01+PP2 (EXISTING)
control panel
B¶n vÏ: VT-CP2/M02-1 (VIETA) B¶n vÏ: VT-CP2/M01-2 (VIET A) B¶n vÏ: VT-CP2/M02-1 (VIETA)
E3-NT-PP2/M02-1 (ELECO) E3-NT-PP2/M02-1 (ELECO)

X1 X1 X1 X1 X1
19 20 25 24 25

X321 X321 X311 X321 X321

4
2

3
1
1L1+/3.6 1Q0.INTL2+/11.6

12
11
5

8
X300 X300 X300 X300 X300 X300
TB1:30

TB1:34
TB1:29

TB1:27

TB1:33
TB1:3

=E01-hv station
PBS2

QF10

GL312F
S1 REM/LOC S1

=HV_STATION+E01
TC1 TC2
TB1:4

TB1:6

13
9

X300 X300

1L1-/3.6 1L1-/5.2 1L2-/3.6

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 4

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB tripping C-000-000- 4 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

=CP2+E01 =CP2+E01

REMOTE CLOSE LOCAL CLOSE CB CLOSING CIRCUIT

=E01+CP2 (EXISTING)

=E01+CP2 (EXISTING)
CONTROL panel

CONTROL panel
M¹ch ®ãng m¸y c¾t b»ng tay
B¶n vÏ: VT-CP2/M01-1 B¶n vÏ: VT-CP2/M01-1

1Q0.INTL2-/11.7
X1 X12 X12
19 2 12

X321 X311

7
1Q0.INTL1+/11.2

1Q0.INTL1-/11.3

14

15

16

17
X300
X300 X300
TB1:26

=HV_STATION+E01

TB1:1
PBS1

=E01-hv station
TB2:35

REM/LOC

GL312F
QF10 QF10
94

S1 S1 94

TB2:36

CC 94
TB1:2

10

X300

1L1-/4.3

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 5

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB closing C-000-000- 5 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

=CP2+E01

CONTROL FOR DS =E01-QL12

=E01+CP2 (EXISTING)
control PANEL
B¶n vÏ: VT-CP2/M01-3
X1
31 32 33

10
X311

9
8
=MK3+E03

MARSHALLING KIOSK
=E03+MK3
27
X311
L+/24.4

28
L-/24.4

X200
4
2

5
1

=HV_STATION+E01
4
9
3

L R

=E01-hv station
CSC CSO

OC-1 CC-1

QL12
CC OC
10

11

X200
6

1QL52.INTL+/12.1

1QL52.INTL-/12.3

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 6

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Control DS C-000-000- 6 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

QE32.1.INTL+/13.2 QE32.2.INTL+/13.7

X201 X201

3
1
=HV_STATION+E01

15

17

=E01-hv station
K1 K1

+VDC +VDC

QE12-1 QE12-2
EPB2

EPB

EBC2

2
EBC
K5
K2
18
-VDC
K2

-VDC

1
16

X201 X201

4
2

QE32.1.INTL-/13.3 QE32.2.INTL-/13.8

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 7

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Control ES C-000-000- 7 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

LOCAL CONTROL CB =E01-QF10 DS =E01-QL12 ES =E01-QE12-1 ES =E01-QE12-2

X400 X400 X400

4
2

3
1
X400

=HV_STATION+E01

TB2:25
TB1:47

=E01-hv station
TB2:1

143

103
141

101
10

10
QF10 QF10 QL12 QE12-1 QE12-2

LOCAL REMOTE
TB1:48

11

144

104
TB2:26
1B2:2

12

142

102
10

12

13
11
X400

9
5

20
14

19
12

13

15

16

17

18
11

X311

=CP2+E01

=E01+CP2 (EXISTING)
X6 X6 X6 X6 X6 X6 X6 X6 X6 X6

control PANEL
1 12 13 14 17 18 15 16 19 20

B¶n vÏ tham kh¶o: VT-CP2/T01-1 & T01-2

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 8

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB, DS, ES state for discrepancy indication C-000-000- 8 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

CB =E01-QF10 DS =E01-QL12 ES =E01-QE12-1 ES =E01-QE12-2

X910 X910

4
2

3
1

=HV_STATION+E01

TB2:27

=E01-hv station
TB2:3

145

147
103

105

107
101
QF10 QL12 QE12-1 QE12-2
TB2:4

TB2:28

104

148

108
146

106
102

10

12
11
X910

9
5

X911
4

9
2

8
1

=E01+CP2 (EXISTING)
=CP2+E01
CONTROL PANEL

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 9

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB, DS, ES state for scada C-000-000- 9 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

18
X300

=HV_STATION+E01

TB1:43

TB1:45
TB1:39
TB1:35

TB1:37

TB1:41
=HV_STATION+E01

=E01-hv station

TB2:29

=E03-hv station
TB2:5
23 23
QF10 13 13 13 3

GL312P
A2 A3 A4 TR MCB1 MCB2
24 24 QF10
14 14 14 4

TB2:30
TB2:6
TB1:40
TB1:38

TB1:44
TB1:36

TB1:46
TB1:42
20

24
22

23
19

21
X300 X300
CB-SPRING CHARGE FAILURE
CB-GENERAL LOCKOUT SF6
CB-LOW GAS SF6

24
22

23
21

X311 X321

8
=E01+CP2 (EXISTING)

PROTECTION PANEL
X7 X7 X7 X7

=E01+PP2(EXISTING)
=PP2+E01

X1 X1 X1

control PANEL
=CP2+E01

3 12 13 14
1 7 6

RELAY INPUT - F21

B¶n vÏ tham kh¶o: VT-CP2/V01-2 B¶n vÏ tham kh¶o: VT-PP2/N02-2

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 10

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Signalling for annuciator C-000-000- 10 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

RELEASE FOR RELEASE FOR

1Q0.INTL2-/5.4
1Q0.INTL1-/5.3

1Q0.INTL2+/4.5
=E01-QF10 =E01-QF10

1Q0.INTL1+/5.3
REMOTE OPERATION LOCAL OPERATION

X1 X1 X1

9
2
1
=HV_STATION+E01 =HV_STATION+E01

105

107

=E01-hv station

=E01-hv station
113

QL12 QL12

114

108
106

10
X1 X1 X1
3

11
X1 X1 X1
4

=HV_STATION+E01 =HV_STATION+E01
=E01-hv station

=E01-hv station
QL11 QL11

12
X1 X1 X1
7

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 11

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Interlocking for CB operation C-000-000- 11 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

RELEASE FOR DS
=E01-QL12

1QL52.INTL+/6.1

1QL52.INTL-/6.1
13
X1

=HV_STATION+E01

=E01-hv station
TB2:33

QF10

TB2:34
14

X1
15

18

X1 X1
=E01-hv station

=HV_STATION+E01

149 117

QE12-1 QE12-2

150 118
16

17

X1 X1

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 12

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Interlocking for DS-QL32 operation C-000-000- 12 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

RELEASE FOR ES RELEASE FOR ES

QE32.2.INTL-/7.5
QE32.1.INTL-/7.3

QE32.2.INTL+/7.5
QE32.1.INTL+/7.3
=E01-QE12-1 =E01-QE12-2

Ghi chó: HiÖn t¹i m¹ch (F27 nèi tiÕp víi KVT)
®ang ®−îc ®Êu nèi ®Ó liªn ®éng cho QE11-1,
yªu cÇu th¸o gì m¹ch hiÖn h÷u ®Ó liªn ®éng
B¶n vÏ: E3-NT-MK2/M03-6A (ELECO)
23
19
X1 X1

B¶n vÏ: VT-MK2/M03-6 (VIET A)

cho QE12-2 (tiÕp ®Þa ®−êng d©y)


=E01+MK2 (EXISTING)
MARSHALLING KIOSK
=E01-hv station
=HV_STATION+E01 =MK2+E01

15
117 F27

QL12 16

43

118 KVT

44
20

24
X1 X1

25
21

X1 X1
=E01-hv station

=E01-hv station
=HV_STATION+E01 =HV_STATION+E01

125

QL11 QL12

126
22

26
X1 X1

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 13

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Interlocking for ES operation C-000-000- 13 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

INTERLOCKING FOR EXISTING DS, ES

29
27
X1 X1

=HV_STATION+E01

=E01-hv station
TB2:31 121

QF10 QL12

TB2:32 122

30
28
X1 X1

INTERLOCK. E01-QE11-1
INTERLOCK. E01-QL11

QF20X QF20X QL11X XDC


34 33 11 10

Remove existing wire


Remove existing wire between QL11X:11 & KVT:44

B¶n vÏ: E3-NT-MK2/M03-4A B¶n vÏ: E3-NT-MK2/M03-6A


(ELECO) (ELECO)

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 14

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 INTERLOCKING FOR EXISTING DS, ES C-000-000- 14 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

=HV_STATION+E01

CURRENT TRANSFORMER CURRENT TRANSFORMER


CORE1 - 200/1A CORE2 - 200/1A

=E01-hv station
CL 0.5 CL 5P20

1S1 1S1 1S1 2S1 2S1 2S1

E01-CT E01-CT

A
B

B
C

C
1S2 1S2 1S2 2S2 2S2 2S2

PE PE
X601 X602
1 2 3 4 5 6 1 2 3 4 5 6

MARSHALLING KIOSK

=MK2+E02
=E02+MK2 (EXISTING) Ghi chó: ChuyÓn toµn bé m¹ch dßng
cho b¶o vÖ F21 t¹i tñ PP2 lÊy tõ ng¨n
B¶n vÏ tham kh¶o: VT-MK2/D03-1 E02 (hiÖn h÷u) sang lÊy tõ ng¨n E01

X4 X4 X4 X4
8 9 10 11

=PP2+E01

=CP2+E01

X4 X4 X4 X4 X4 B¶n vÏ: VT-PP2/D02-1 (VIET A)


1 2 3 4 1 2 3 4
=E01+CP2 (EXISTING)

=E01+PP2(EXISTING)
E3-NT-PP2/D02-1 (ELECO)

PROTECTION panel
CONTROL panel

§Õn m¹ch ®o l−êng dßng ®iÖn


(§ång hå A1)

Remove existing cable


between X4(8, 9, 10, 11) - MK2 (Existing)
B¶n vÏ tham kh¶o: VT-CP2/D01-1 & X4 (1, 2, 3, 4) - PP2 (Existing)

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 15

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Current circuit C-000-000- 15 16 pages
54
53
MK2
1 2 3 4 5 6 7 8

=HV_STATION+E01

CURRENT TRANSFORMER CURRENT TRANSFORMER


CORE3 - 200/1A CORE4 - 200/1A

=E01-hv station
CL 5P20 CL 5P20

3S1 3S1 3S1 4S1 4S1 4S1

E01-CT E01-CT

A
B

B
C

C
3S2 3S2 3S2 4S2 4S2 4S2

PE PE
X603 X604
1 2 3 4 5 6 1 2 3 4 5 6

MARSHALLING KIOSK
=MK2+E02

=E02+MK2 (EXISTING) Ghi chó: ChuyÓn toµn bé m¹ch dßng


cho b¶o vÖ F67 t¹i tñ PP2 lÊy tõ ng¨n
B¶n vÏ tham kh¶o: VT-MK2/D03-2 E02 (hiÖn h÷u) sang lÊy tõ ng¨n E01

X4 X4 X4 X4
15 16 17 18

=PP2+E01

X4 X4 X4 X4 B¶n vÏ: VT-PP2/D02-2 (VIET A)


9 10 11 12
=E01+PP2(EXISTING)

E3-NT-PP2/D02-2 (ELECO)
PROTECTION panel

Remove existing cable


between X4(15, 16, 17, 18) - MK2 (Existing)
& X4 (9, 10, 11, 12) - PP2 (Existing)

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 16

Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Current circuit C-000-000- 16 16 pages
54
53
MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : QF20X

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

-X1 27 14.4 33
-X1 28 14.3 34

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 1
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-QF20X 1 30 pages
=MK2+E01-QF20X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : QL11X

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

-X1 30 14.5 11

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 2
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-QL11X 2 30 pages
=MK2+E01-QL11X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X1

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=HV_STATION -QL12 105 11.2 1


=HV_STATION -QL12 107 11.2 2
=HV_STATION -QL12 106 11.2 3
11.2 4
=HV_STATION -QL12 108 11.2 5
11.2 6
11.2 7
11.2 8
-X300 8 11.6 9
=HV_STATION -QL12 113 11.6
=HV_STATION -QL12 114 11.6 10
11.6 11
11.6 12
-X200 6 12.1 13
=HV_STATION -QF10 TB2:33 12.1
=HV_STATION -QF10 TB2:34 12.1 14
=HV_STATION -QE12-1 149 12.1 15
=HV_STATION -QE12-1 150 12.1 16
=HV_STATION -QE12-2 118 12.3 17
=HV_STATION -QE12-2 117 12.3 18
QE32.1.INTL+ 13.2 19
=HV_STATION -QL12 117 13.2
=HV_STATION -QL12 118 13.2 20
13.2 21
13.2 22
QE32.2.INTL+ 13.7 23
-F27 15 13.7
-KVT 44 13.7 24
=HV_STATION -QL12 125 13.7 25
=HV_STATION -QL12 126 13.7 26
-QF20X 33 14.3 27
=HV_STATION -QF10 TB2:31 14.3
=HV_STATION -QF10 TB2:32 14.3 28
-QF20X 34 14.3
-XDC 10 14.5 29
=HV_STATION -QL12 121 14.5
=HV_STATION -QL12 122 14.5 30
-QL11X 11 14.5

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 3
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X1 3 30 pages
=MK2+E01-X1
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X100

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=HV_STATION -QF10 TB1:19 1.1 1


=HV_STATION -QL12 1 1.2 2
-X311 25 2.3 3
=HV_STATION -QF10 TB1:17 2.3
=HV_STATION -QF10 TB1:21 1.1 4
=HV_STATION -QL12 2 1.3 5
-X311 26 2.3 6
=HV_STATION -QF10 TB1:18 2.3

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 4
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X100 4 30 pages
=MK2+E01-X100
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X200

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

-X311 27 2412 6.1 1


=HV_STATION -QL12 3 2412 6.1
-X311 8 6.2 2
=HV_STATION -QL12 7 6.2
-X311 9 6.2 3
=HV_STATION -QL12 8 6.2
-X311 10 6.2 4
=HV_STATION -QL12 9 6.2
-X311 28 2423 6.2 5
=HV_STATION -QL12 4 2423 6.2
=HV_STATION -QL12 10 6.1 6
-X1 13 6.1
=HV_STATION -QL12 11 6.1 7

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 5
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X200 5 30 pages
=MK2+E01-X200
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X201

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

7.3 1 =HV_STATION -QE12-1 15


7.3 2 =HV_STATION -QE12-1 16
7.5 3 =HV_STATION -QE12-2 17
7.5 4 =HV_STATION -QE12-2 1

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 6
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X201 6 30 pages
=MK2+E01-X201
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X300

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

-X311 1 3.4 1 =HV_STATION -QF10 TB1:7


=HV_STATION -QF10 TB1:8 3.4 2 -X311 2

3.8 3
3.8 4
-X321 1 4.2 5 =HV_STATION -QF10 TB1:29
-X321 2 4.3 6 =HV_STATION -QF10 TB1:30
-X311 5 4.3 7 =HV_STATION -QF10 TB1:27
4.4 8 =HV_STATION -QF10 TB1:3
=HV_STATION -QF10 TB1:4 4.2 9
=HV_STATION -QF10 TB1:2 5.2 10
-X321 3 4.6 11 =HV_STATION -QF10 TB1:33
-X321 4 4.7 12 =HV_STATION -QF10 TB1:34
=HV_STATION -QF10 TB1:6 4.6 13 -X311 4

-X1 8 5.2 14 =HV_STATION -QF10 TB1:26


1Q0.INTL2- 5.4 15
=HV_STATION -QF10 TB1:1 5.4
-X311 6 5.6 16
=HV_STATION -QF10 TB2:35 5.6
-X311 7 5.7 17
=HV_STATION -QF10 TB2:36 5.7
-X311 21 10.2 18
=HV_STATION -QF10 TB1:35 10.2
=HV_STATION -QF10 TB1:36 10.2 19
-X311 22 10.2
=HV_STATION -QF10 TB1:38 10.2 20
-X311 23 10.2
-X311 24 10.3 21
=HV_STATION -QF10 TB2:5 10.6 22
-X321 6 10.6
=HV_STATION -QF10 TB2:6 10.7 23
-X321 7 10.7
=HV_STATION -QF10 TB2:30 10.7 24
-X321 8 10.7

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 7
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X300 7 30 pages
=MK2+E01-X300
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X311

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=CP2 -X1 3 3.2 1 -X300 1

=CP2 -X1 24 3.2 2 -X300 2

3.2 3
=CP2 -X1 10 3.2 4 -X300 13
=CP2 -X1 25 4.3 5
-X300 7 4.3
=CP2 -X12 2 5.6 6
-X300 16 5.6
=CP2 -X12 12 5.7 7
-X300 17 5.7
=CP2 -X1 31 6.2 8
-X200 2 6.2
=CP2 -X1 32 6.2 9
-X200 3 6.2
=CP2 -X1 33 6.2 10
-X200 4 6.2
-X400 1 8.1 11
=CP2 -X6 1 8.1
-X400 5 8.1 12
=CP2 -X6 12 8.1
-X400 6 8.2 13
=CP2 -X6 13 8.2
-X400 7 8.2 14
=CP2 -X6 14 8.2
-X400 8 8.3 15
=CP2 -X6 17 8.3
-X400 9 8.4 16
=CP2 -X6 18 8.4
-X400 10 8.4 17
=CP2 -X6 15 8.4
-X400 11 8.5 18
=CP2 -X6 16 8.5
-X400 12 8.6 19
=CP2 -X6 19 8.6
-X400 13 8.6 20
=CP2 -X6 20 8.6
-X300 18 10.1 21
=CP2 -X7 3 10.1
-X300 19 10.2 22
=CP2 -X7 12 10.2

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 8
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X311 8 30 pages
=MK2+E01-X311
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X311

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

-X300 20 10.2 23
=CP2 -X7 13 10.2
-X300 21 10.3 24
=CP2 -X7 14 10.3
=CP2 -F.. 2 2.2 25 -X100 3
=CP2 -F.. 4 2.2 26 -X100 6
-X200 1 2412 6.4 27 =MK3 +E03 -X312 26

-X200 5 2423 6.4 28 =MK3 +E03 -X312 28

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 8.1
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X311 8.1 30 pages
=MK2+E01-X311
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X321

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=PP2 -X1 19 4.2 1


-X300 5 4.2
=PP2 -X1 20 4.3 2
-X300 6 4.3
=PP2 -X1 24 4.6 3
-X300 11 4.6
=PP2 -X1 25 4.7 4
-X300 12 4.7
=CP2 -X1 19 5.2 5
-X1 1 5.2
-X300 22 10.6 6
=PP2 -X1 1 10.6
-X300 23 10.7 7
=PP2 -X1 7 10.7
-X300 24 10.7 8
=PP2 -X1 6 10.7

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 9
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X321 9 30 pages
=MK2+E01-X321
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X400

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

-X311 11 8.1 1
8.1 =HV_STATION -QF10 TB1:47
=HV_STATION -QL12 10 8.3 2
=HV_STATION -QE12-1 141 8.4 3
=HV_STATION -QE12-2 101 8.6 4
=HV_STATION -QF10 TB1:49 8.1 5
-X311 12 8.1
=HV_STATION -QF10 1B2:2 8.2 6
-X311 13 8.2
=HV_STATION -QF10 TB2:26 8.2 7
-X311 14 8.2
=HV_STATION -QL12 11 8.3 8
-X311 15 8.3
=HV_STATION -QL12 12 8.4 9
-X311 16 8.4
=HV_STATION -QE12-1 142 8.4 10
-X311 17 8.4
=HV_STATION -QE12-1 144 8.5 11
-X311 18 8.5
=HV_STATION -QE12-2 102 8.6 12
-X311 19 8.6
=HV_STATION -QE12-2 104 8.6 13
-X311 20 8.6

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 10
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X400 10 30 pages
=MK2+E01-X400
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X601

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=HV_STATION -E01-CT 1S2 15.2 1 =CP2 -X4 1

=HV_STATION -E01-CT 1S2 15.2 2 =CP2 -X4 2

=HV_STATION -E01-CT 1S2 15.2 3 =CP2 -X4 3

=HV_STATION -E01-CT 1S1 15.2 4


=CP2 -X4 4 15.2
=HV_STATION -E01-CT 1S1 15.2 5
=HV_STATION -E01-CT 1S1 15.3 6 -PE5 PE

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 11
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X601 11 30 pages
=MK2+E01-X601
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X602

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=HV_STATION -E01-CT 2S2 15.6 1 =PP2 -X4 1

=HV_STATION -E01-CT 2S2 15.6 2 =PP2 -X4 2

=HV_STATION -E01-CT 2S2 15.6 3 =PP2 -X4 3

=HV_STATION -E01-CT 2S1 15.6 4


=PP2 -X4 4 15.6
=HV_STATION -E01-CT 2S1 15.7 5
=HV_STATION -E01-CT 2S1 15.7 6 -PE4 PE

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 12
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X602 12 30 pages
=MK2+E01-X602
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X603

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=HV_STATION -E01-CT 3S2 16.2 1 =PP2 -X4 9

=HV_STATION -E01-CT 3S2 16.2 2 =PP2 -X4 10

=HV_STATION -E01-CT 3S2 16.2 3 =PP2 -X4 11

=HV_STATION -E01-CT 3S1 16.2 4


=PP2 -X4 12 16.2
=HV_STATION -E01-CT 3S1 16.3 5
=HV_STATION -E01-CT 3S1 16.3 6 -PE2 PE

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 13
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X603 13 30 pages
=MK2+E01-X603
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X604

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=HV_STATION -E01-CT 4S2 16.6 1


=HV_STATION -E01-CT 4S2 16.6 2
=HV_STATION -E01-CT 4S2 16.6 3
=HV_STATION -E01-CT 4S1 16.7 4
=HV_STATION -E01-CT 4S1 16.7 5
=HV_STATION -E01-CT 4S1 16.7 6 -PE7 PE

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 14
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X604 14 30 pages
=MK2+E01-X604
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X910

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

-X911 1 9.1 1
=HV_STATION -QF10 TB2:3 9.1
=HV_STATION -QL12 101 9.2 2
=HV_STATION -QE12-1 145 9.3 3
=HV_STATION -QE12-2 105 9.4 4
=HV_STATION -QF10 TB2:4 9.1 5
-X911 2 9.1
=HV_STATION -QF10 TB2:28 9.1 6
-X911 3 9.1
=HV_STATION -QL12 102 9.2 7
-X911 4 9.2
=HV_STATION -QL12 104 9.2 8
-X911 5 9.2
=HV_STATION -QE12-1 146 9.3 9
-X911 6 9.3
=HV_STATION -QE12-1 148 9.4 10
-X911 7 9.4
=HV_STATION -QE12-2 106 9.4 11
-X911 8 9.4
=HV_STATION -QE12-2 108 9.5 12
-X911 9 9.5

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 15
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X910 15 30 pages
=MK2+E01-X910
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : X911

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

-X910 1 9.0 1
-X910 5 9.1 2
-X910 6 9.1 3
-X910 7 9.2 4
-X910 8 9.2 5
-X910 9 9.3 6
-X910 10 9.4 7
-X910 11 9.4 8
-X910 12 9.5 9

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 16
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X911 16 30 pages
=MK2+E01-X911
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : XAC

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

1.1 1 -X100 1

1.1 11 -X100 4

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 17
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-XAC 17 30 pages
=MK2+E01-XAC
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01

STRIP : XDC

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

2.4 5 +E03 -X01 1

2.4 10 +E03 -X01 2


-X1 29 14.5 10

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E01

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 18
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-XDC 18 30 pages
=MK2+E01-XDC
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E02

STRIP : QF20X

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

26.7 11
24.6 17
25.3 19
25.6 20
20.3 28
20.3 29
20.2 30

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E02

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 19
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E02-QF20X 19 30 pages
=MK2+E02-QF20X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E02

STRIP : X4

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=PP2 +E01 -X4 1 15.5 8


=PP2 +E01 -X4 2 15.5 9
=PP2 +E01 -X4 3 15.5 10
=PP2 +E01 -X4 4 15.6 11
=PP2 +E01 -X4 9 16.0 15
=PP2 +E01 -X4 10 16.1 16
=PP2 +E01 -X4 11 16.1 17
=PP2 +E01 -X4 12 16.1 18

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E02

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 20
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E02-X4 20 30 pages
=MK2+E02-X4
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E02

STRIP : X9

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

26.5 12

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E02

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 21
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E02-X9 21 30 pages
=MK2+E02-X9
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E02

STRIP : X52

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

20.5 21
20.5 22

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E02

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 22
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E02-X52 22 30 pages
=MK2+E02-X52
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03

STRIP : QF20X

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

32.4 31
32.3 32

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E03

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 23
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-QF20X 23 30 pages
=MK2+E03-QF20X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03

STRIP : QL22X

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

15.6 13

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E03

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 24
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-QL22X 24 30 pages
=MK2+E03-QL22X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03

STRIP : QL31X

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

15.6 2
32.5 11

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E03

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 25
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-QL31X 25 30 pages
=MK2+E03-QL31X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03

STRIP : X01

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

+E01 -XDC 5 2.4 1


=HV_STATION +E01 -QL12 5 2.4
+E01 -XDC 10 2.5 2
=HV_STATION +E01 -QL12 6 2.5

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E03

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 26
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-X01 26 30 pages
=MK2+E03-X01
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03

STRIP : X5

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

=PP4 -X231 8 241 5.2 21 -KVT 13

-KVT 14 521 5.2 22 =PP4 -X231 10

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E03

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 27
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-X5 27 30 pages
=MK2+E03-X5
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03

STRIP : X52

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

15.6 5
15.5 9

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E03

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 28
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-X52 28 30 pages
=MK2+E03-X52
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03

STRIP : XDC

FROM TO

INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.

32.5 8

Nguyen Xuan Quynh Project


APPROVER Drawing name Date = E03

EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 29
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-XDC 29 30 pages
=MK2+E03-XDC
54
53
TERM.MK2

You might also like