+MK2 - Existing Modification PDF
+MK2 - Existing Modification PDF
Project No.
EDHP
P09-006
Material
Title
50
000
0
1 2 3 4 5 6 7 8
REVISION REVISION
SHEET DESCRIPTION SHEET DESCRIPTION
00 01 02 03 04 05 00 01 02 03 04 05
00 Sheet index - -
C-04 CB tripping - -
C-05 CB closing - -
C-06 Control DS - -
C-07 Control ES - -
- - -
-
- - -
-
- - -
-
- - -
-
- - -
-
- - -
-
- - -
-
- - -
-
- - -
-
- - -
-
EDHp
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110kv vinh tuong substation modification & extension + S1
02 02-04-2009 CHECKER Do Minh Viet of EXISTING MARSHALLING KIOSK - MK2 Dwg number Page 1
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 drawing's List A-000-000-1 2 pages
1 2 3 4 5 6 7 8
QL13, QL14 Existing DSs - E04 bay (110kV side of transformer T1) 02 - -
QE13-1, QE13-2, QE14-1 Existing ESs - E04 bay (110kV side of transformer T1) 03 - -
QL11, QL31 Existing DSs - E01 & E03 bays (two 110kV line feeders) 02 - -
QE11-1,QE11-2,QE31-1,QE31-2 Existing ESs - E01 & E03 bays (two 110kV line feeders) 04 - -
VT1, VT2 Existing line VTs - E01 & E03 bays (two 110kV line feeders) 02 - -
QL51, QL52 In this project - DSs - E05 bay (110kV side of transformer T2) 02 - -
QE51-1, QE51-2, QE52-1 In this project - ESs - E05 bay (110kV side of transformer T2) 03 - -
VT4 In this project - busbar VT - E05 bay (110kV side of transformer T2) 01 - -
QF10, QF30 In this project - CBs - E01 & E03 bays (two 110kV line feeders) 02 - -
QL12, QL32 In this project - DSs - E01 & E03 bays (two 110kV line feeders) 02 - -
QE12-1,QE12-1,QE32-1,QE32-2 In this project - ESs - E01 & E03 bays (two 110kV line feeders) 04 - -
CT-E01, E03 In this project - CTs - E01 & E03 bays (two 110kV line feeders) 02 - -
EDHp
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110kV vinh tuong substaion basic design
+ BASIC
Dwg number Page 2
02 02-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 PRIMARY EQUIPMENT's List A-000-000-2 2 pages
1 2 3 4 5 6 7 8
QL32 QL12
m m
DS+2ES: 123KV-1250A-25KA/3S
DS+1ES: 123KV-1250A-25KA/3S
DS+1ES: 123KV-1250A-25KA/3S
QE32-1 QE12-1
CB: 123KV-1250A-25KA/3S
CT: 123KV
200-400-600-800/1-1-1-1A
200-400-600-800/1-1-1-1A
QF30 QF10
CB: 123KV-1250A-25KA/3S
CT: 123KV
QE31-1 QE11-1
m m
DS+1ES: 123KV-1250A-25KA/3S
QL52
m =E05 QE22-1 QE21-1 =E04 QL14
m
VT4 VT3
QE52-1 QE14-1
cvt-123kv cvt-123kv
CT: 123KV 110 0.11 110 0.11
200-400-600-800/1-1-1-1A 0.11kv 0.11kv
3 3 3 3
QF50 QF60
CB: 123KV-1250A-25KA/3S
QE51-1 QE13-1
QE51-2 QE13-2
t2 t1
H.BCT 200-400-600/1/1/1A
200-400/1A 200-400/1A
T2 -20/25MVA
115±9x1,78%/23/6.3kV 35kv
ONAN/ONAF 400/1A
YN/YN/(D)-0-11
200-400-600
/1/1A
L.BCT 600-800/1/1A
400-600-800/1/1A
400-600-800/1-1-1A
200-400-600/1-1-1A
QF 22KV 1600A-630A-16KA/1S Q0 Q0
200-400/1-1A
200-400/1-1A
200-400/1-1A
200-400/1-1A
200-400/1-1A
200-400/1-1A
200-400/1-1A
200-400/1-1A
CT 600-800-1200/1/1/1A vt-22kv vt-22kv
22 0.11kv 22 0.11kv
3 3 3 3
CT 200-400/1-1A Legend:
Q8
=j15 =J14 =J13 =J12 =J11 j10 =J09 =j08 =J07 j06 =J05 =J04 =J03 =J02 =J01 EXITING
This project
EDHp
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110kV vinh tuong substaion SINGLE LINE DIAGRAM
+ BASIC
Dwg number Page 1
02 02-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 drawing's List B-000-000-1 1 pages
1 2 3 4 5 6 7 8
XAC
XAC 1
11
X100 X100
4
5
1
=HV_STATION+E01
TB1:19
TB1:21
=E01-hv station
1
QF10 DS QL12
H
PE
2
IL
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 1
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB, DS heatings C-000-000- 1 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
AC DISTRIBUTION PANEL
=AC_EXISTING
+(EXISTING)
=E01-QF10 MOTOR DRIVE =E01-QL12 MOTOR DRIVE
B¶n vÏ sè: VT-ACDB/S05-2
L N
XA16
1 2
XDC
XDC 5
10
E3-NT-MK2/L03-2 (ELECO)
F..
2 4
26 25
X311
CONTROL PANEL
=CP2+E01
=E01+CP2 (EXISTING)
Note: X100 X01 X01
2
1
AC MCB & terminals for
Power supply of QF10 motor
at CP2 panel
must be newly added =HV_STATION+E01
TB1:17
TB1:18
=E01-hv station
MCB1
QF10 LS
QL12 M
6
PE
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 2
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB, DS motor drivers C-000-000- 2 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
=CP2+E01
CONTROL PANEL
=E01+CP2 (EXISTING) POWER SUPPLY POWER SUPPLY
AUTO CHANGE OVER FOR CB RELAYS
1
1L1+/4.4
3
X1 X311
3
9
1
X300
TB1:7
=HV_STATION+E01
GL312F1P
=E01-hv station
5 1 3
QF10
P1 P2 P2
6 2 4
A2 A3 A4
TB1:8
4
2
3
X300 X300 X300
1L1-/4.1
24
X1 X311
4
1L2-/4.6
10
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 3
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Power Supply for CB relays C-000-000- 3 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
=E01+CP2 (EXISTING)
protection panel
=E01+PP2 (EXISTING)
protection panel
=E01+PP2 (EXISTING)
control panel
B¶n vÏ: VT-CP2/M02-1 (VIETA) B¶n vÏ: VT-CP2/M01-2 (VIET A) B¶n vÏ: VT-CP2/M02-1 (VIETA)
E3-NT-PP2/M02-1 (ELECO) E3-NT-PP2/M02-1 (ELECO)
X1 X1 X1 X1 X1
19 20 25 24 25
4
2
3
1
1L1+/3.6 1Q0.INTL2+/11.6
12
11
5
8
X300 X300 X300 X300 X300 X300
TB1:30
TB1:34
TB1:29
TB1:27
TB1:33
TB1:3
=E01-hv station
PBS2
QF10
GL312F
S1 REM/LOC S1
=HV_STATION+E01
TC1 TC2
TB1:4
TB1:6
13
9
X300 X300
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 4
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB tripping C-000-000- 4 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
=CP2+E01 =CP2+E01
=E01+CP2 (EXISTING)
=E01+CP2 (EXISTING)
CONTROL panel
CONTROL panel
M¹ch ®ãng m¸y c¾t b»ng tay
B¶n vÏ: VT-CP2/M01-1 B¶n vÏ: VT-CP2/M01-1
1Q0.INTL2-/11.7
X1 X12 X12
19 2 12
X321 X311
7
1Q0.INTL1+/11.2
1Q0.INTL1-/11.3
14
15
16
17
X300
X300 X300
TB1:26
=HV_STATION+E01
TB1:1
PBS1
=E01-hv station
TB2:35
REM/LOC
GL312F
QF10 QF10
94
S1 S1 94
TB2:36
CC 94
TB1:2
10
X300
1L1-/4.3
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 5
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB closing C-000-000- 5 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
=CP2+E01
=E01+CP2 (EXISTING)
control PANEL
B¶n vÏ: VT-CP2/M01-3
X1
31 32 33
10
X311
9
8
=MK3+E03
MARSHALLING KIOSK
=E03+MK3
27
X311
L+/24.4
28
L-/24.4
X200
4
2
5
1
=HV_STATION+E01
4
9
3
L R
=E01-hv station
CSC CSO
OC-1 CC-1
QL12
CC OC
10
11
X200
6
1QL52.INTL+/12.1
1QL52.INTL-/12.3
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 6
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Control DS C-000-000- 6 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
QE32.1.INTL+/13.2 QE32.2.INTL+/13.7
X201 X201
3
1
=HV_STATION+E01
15
17
=E01-hv station
K1 K1
+VDC +VDC
QE12-1 QE12-2
EPB2
EPB
EBC2
2
EBC
K5
K2
18
-VDC
K2
-VDC
1
16
X201 X201
4
2
QE32.1.INTL-/13.3 QE32.2.INTL-/13.8
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 7
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Control ES C-000-000- 7 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
4
2
3
1
X400
=HV_STATION+E01
TB2:25
TB1:47
=E01-hv station
TB2:1
143
103
141
101
10
10
QF10 QF10 QL12 QE12-1 QE12-2
LOCAL REMOTE
TB1:48
11
144
104
TB2:26
1B2:2
12
142
102
10
12
13
11
X400
9
5
20
14
19
12
13
15
16
17
18
11
X311
=CP2+E01
=E01+CP2 (EXISTING)
X6 X6 X6 X6 X6 X6 X6 X6 X6 X6
control PANEL
1 12 13 14 17 18 15 16 19 20
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 8
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB, DS, ES state for discrepancy indication C-000-000- 8 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
X910 X910
4
2
3
1
=HV_STATION+E01
TB2:27
=E01-hv station
TB2:3
145
147
103
105
107
101
QF10 QL12 QE12-1 QE12-2
TB2:4
TB2:28
104
148
108
146
106
102
10
12
11
X910
9
5
X911
4
9
2
8
1
=E01+CP2 (EXISTING)
=CP2+E01
CONTROL PANEL
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 9
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 CB, DS, ES state for scada C-000-000- 9 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
18
X300
=HV_STATION+E01
TB1:43
TB1:45
TB1:39
TB1:35
TB1:37
TB1:41
=HV_STATION+E01
=E01-hv station
TB2:29
=E03-hv station
TB2:5
23 23
QF10 13 13 13 3
GL312P
A2 A3 A4 TR MCB1 MCB2
24 24 QF10
14 14 14 4
TB2:30
TB2:6
TB1:40
TB1:38
TB1:44
TB1:36
TB1:46
TB1:42
20
24
22
23
19
21
X300 X300
CB-SPRING CHARGE FAILURE
CB-GENERAL LOCKOUT SF6
CB-LOW GAS SF6
24
22
23
21
X311 X321
8
=E01+CP2 (EXISTING)
PROTECTION PANEL
X7 X7 X7 X7
=E01+PP2(EXISTING)
=PP2+E01
X1 X1 X1
control PANEL
=CP2+E01
3 12 13 14
1 7 6
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 10
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Signalling for annuciator C-000-000- 10 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
1Q0.INTL2-/5.4
1Q0.INTL1-/5.3
1Q0.INTL2+/4.5
=E01-QF10 =E01-QF10
1Q0.INTL1+/5.3
REMOTE OPERATION LOCAL OPERATION
X1 X1 X1
9
2
1
=HV_STATION+E01 =HV_STATION+E01
105
107
=E01-hv station
=E01-hv station
113
QL12 QL12
114
108
106
10
X1 X1 X1
3
11
X1 X1 X1
4
=HV_STATION+E01 =HV_STATION+E01
=E01-hv station
=E01-hv station
QL11 QL11
12
X1 X1 X1
7
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 11
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Interlocking for CB operation C-000-000- 11 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
RELEASE FOR DS
=E01-QL12
1QL52.INTL+/6.1
1QL52.INTL-/6.1
13
X1
=HV_STATION+E01
=E01-hv station
TB2:33
QF10
TB2:34
14
X1
15
18
X1 X1
=E01-hv station
=HV_STATION+E01
149 117
QE12-1 QE12-2
150 118
16
17
X1 X1
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 12
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Interlocking for DS-QL32 operation C-000-000- 12 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
QE32.2.INTL-/7.5
QE32.1.INTL-/7.3
QE32.2.INTL+/7.5
QE32.1.INTL+/7.3
=E01-QE12-1 =E01-QE12-2
Ghi chó: HiÖn t¹i m¹ch (F27 nèi tiÕp víi KVT)
®ang ®−îc ®Êu nèi ®Ó liªn ®éng cho QE11-1,
yªu cÇu th¸o gì m¹ch hiÖn h÷u ®Ó liªn ®éng
B¶n vÏ: E3-NT-MK2/M03-6A (ELECO)
23
19
X1 X1
15
117 F27
QL12 16
43
118 KVT
44
20
24
X1 X1
25
21
X1 X1
=E01-hv station
=E01-hv station
=HV_STATION+E01 =HV_STATION+E01
125
QL11 QL12
126
22
26
X1 X1
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 13
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Interlocking for ES operation C-000-000- 13 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
29
27
X1 X1
=HV_STATION+E01
=E01-hv station
TB2:31 121
QF10 QL12
TB2:32 122
30
28
X1 X1
INTERLOCK. E01-QE11-1
INTERLOCK. E01-QL11
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 14
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 INTERLOCKING FOR EXISTING DS, ES C-000-000- 14 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
=HV_STATION+E01
=E01-hv station
CL 0.5 CL 5P20
E01-CT E01-CT
A
B
B
C
C
1S2 1S2 1S2 2S2 2S2 2S2
PE PE
X601 X602
1 2 3 4 5 6 1 2 3 4 5 6
MARSHALLING KIOSK
=MK2+E02
=E02+MK2 (EXISTING) Ghi chó: ChuyÓn toµn bé m¹ch dßng
cho b¶o vÖ F21 t¹i tñ PP2 lÊy tõ ng¨n
B¶n vÏ tham kh¶o: VT-MK2/D03-1 E02 (hiÖn h÷u) sang lÊy tõ ng¨n E01
X4 X4 X4 X4
8 9 10 11
=PP2+E01
=CP2+E01
=E01+PP2(EXISTING)
E3-NT-PP2/D02-1 (ELECO)
PROTECTION panel
CONTROL panel
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 15
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Current circuit C-000-000- 15 16 pages
54
53
MK2
1 2 3 4 5 6 7 8
=HV_STATION+E01
=E01-hv station
CL 5P20 CL 5P20
E01-CT E01-CT
A
B
B
C
C
3S2 3S2 3S2 4S2 4S2 4S2
PE PE
X603 X604
1 2 3 4 5 6 1 2 3 4 5 6
MARSHALLING KIOSK
=MK2+E02
X4 X4 X4 X4
15 16 17 18
=PP2+E01
E3-NT-PP2/D02-2 (ELECO)
PROTECTION panel
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung MODIFICATION & EXTENSION 06-02-2009
+ MK2
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION
03 17-04-2009 CHECKER Do Minh Viet
OF EXSITNG MARSHALLING KIOSK - MK2 Dwg number Page 16
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 Current circuit C-000-000- 16 16 pages
54
53
MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : QF20X
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
-X1 27 14.4 33
-X1 28 14.3 34
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 1
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-QF20X 1 30 pages
=MK2+E01-QF20X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : QL11X
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
-X1 30 14.5 11
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 2
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-QL11X 2 30 pages
=MK2+E01-QL11X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X1
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 3
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X1 3 30 pages
=MK2+E01-X1
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X100
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 4
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X100 4 30 pages
=MK2+E01-X100
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X200
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 5
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X200 5 30 pages
=MK2+E01-X200
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X201
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 6
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X201 6 30 pages
=MK2+E01-X201
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X300
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
3.8 3
3.8 4
-X321 1 4.2 5 =HV_STATION -QF10 TB1:29
-X321 2 4.3 6 =HV_STATION -QF10 TB1:30
-X311 5 4.3 7 =HV_STATION -QF10 TB1:27
4.4 8 =HV_STATION -QF10 TB1:3
=HV_STATION -QF10 TB1:4 4.2 9
=HV_STATION -QF10 TB1:2 5.2 10
-X321 3 4.6 11 =HV_STATION -QF10 TB1:33
-X321 4 4.7 12 =HV_STATION -QF10 TB1:34
=HV_STATION -QF10 TB1:6 4.6 13 -X311 4
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 7
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X300 7 30 pages
=MK2+E01-X300
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X311
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
3.2 3
=CP2 -X1 10 3.2 4 -X300 13
=CP2 -X1 25 4.3 5
-X300 7 4.3
=CP2 -X12 2 5.6 6
-X300 16 5.6
=CP2 -X12 12 5.7 7
-X300 17 5.7
=CP2 -X1 31 6.2 8
-X200 2 6.2
=CP2 -X1 32 6.2 9
-X200 3 6.2
=CP2 -X1 33 6.2 10
-X200 4 6.2
-X400 1 8.1 11
=CP2 -X6 1 8.1
-X400 5 8.1 12
=CP2 -X6 12 8.1
-X400 6 8.2 13
=CP2 -X6 13 8.2
-X400 7 8.2 14
=CP2 -X6 14 8.2
-X400 8 8.3 15
=CP2 -X6 17 8.3
-X400 9 8.4 16
=CP2 -X6 18 8.4
-X400 10 8.4 17
=CP2 -X6 15 8.4
-X400 11 8.5 18
=CP2 -X6 16 8.5
-X400 12 8.6 19
=CP2 -X6 19 8.6
-X400 13 8.6 20
=CP2 -X6 20 8.6
-X300 18 10.1 21
=CP2 -X7 3 10.1
-X300 19 10.2 22
=CP2 -X7 12 10.2
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 8
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X311 8 30 pages
=MK2+E01-X311
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X311
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
-X300 20 10.2 23
=CP2 -X7 13 10.2
-X300 21 10.3 24
=CP2 -X7 14 10.3
=CP2 -F.. 2 2.2 25 -X100 3
=CP2 -F.. 4 2.2 26 -X100 6
-X200 1 2412 6.4 27 =MK3 +E03 -X312 26
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 8.1
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X311 8.1 30 pages
=MK2+E01-X311
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X321
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 9
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X321 9 30 pages
=MK2+E01-X321
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X400
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
-X311 11 8.1 1
8.1 =HV_STATION -QF10 TB1:47
=HV_STATION -QL12 10 8.3 2
=HV_STATION -QE12-1 141 8.4 3
=HV_STATION -QE12-2 101 8.6 4
=HV_STATION -QF10 TB1:49 8.1 5
-X311 12 8.1
=HV_STATION -QF10 1B2:2 8.2 6
-X311 13 8.2
=HV_STATION -QF10 TB2:26 8.2 7
-X311 14 8.2
=HV_STATION -QL12 11 8.3 8
-X311 15 8.3
=HV_STATION -QL12 12 8.4 9
-X311 16 8.4
=HV_STATION -QE12-1 142 8.4 10
-X311 17 8.4
=HV_STATION -QE12-1 144 8.5 11
-X311 18 8.5
=HV_STATION -QE12-2 102 8.6 12
-X311 19 8.6
=HV_STATION -QE12-2 104 8.6 13
-X311 20 8.6
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 10
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X400 10 30 pages
=MK2+E01-X400
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X601
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 11
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X601 11 30 pages
=MK2+E01-X601
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X602
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 12
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X602 12 30 pages
=MK2+E01-X602
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X603
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 13
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X603 13 30 pages
=MK2+E01-X603
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X604
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 14
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X604 14 30 pages
=MK2+E01-X604
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X910
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
-X911 1 9.1 1
=HV_STATION -QF10 TB2:3 9.1
=HV_STATION -QL12 101 9.2 2
=HV_STATION -QE12-1 145 9.3 3
=HV_STATION -QE12-2 105 9.4 4
=HV_STATION -QF10 TB2:4 9.1 5
-X911 2 9.1
=HV_STATION -QF10 TB2:28 9.1 6
-X911 3 9.1
=HV_STATION -QL12 102 9.2 7
-X911 4 9.2
=HV_STATION -QL12 104 9.2 8
-X911 5 9.2
=HV_STATION -QE12-1 146 9.3 9
-X911 6 9.3
=HV_STATION -QE12-1 148 9.4 10
-X911 7 9.4
=HV_STATION -QE12-2 106 9.4 11
-X911 8 9.4
=HV_STATION -QE12-2 108 9.5 12
-X911 9 9.5
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 15
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X910 15 30 pages
=MK2+E01-X910
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : X911
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
-X910 1 9.0 1
-X910 5 9.1 2
-X910 6 9.1 3
-X910 7 9.2 4
-X910 8 9.2 5
-X910 9 9.3 6
-X910 10 9.4 7
-X910 11 9.4 8
-X910 12 9.5 9
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 16
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-X911 16 30 pages
=MK2+E01-X911
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : XAC
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
1.1 1 -X100 1
1.1 11 -X100 4
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 17
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-XAC 17 30 pages
=MK2+E01-XAC
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E01
STRIP : XDC
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 18
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E01-XDC 18 30 pages
=MK2+E01-XDC
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E02
STRIP : QF20X
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
26.7 11
24.6 17
25.3 19
25.6 20
20.3 28
20.3 29
20.2 30
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 19
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E02-QF20X 19 30 pages
=MK2+E02-QF20X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E02
STRIP : X4
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 20
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E02-X4 20 30 pages
=MK2+E02-X4
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E02
STRIP : X9
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
26.5 12
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 21
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E02-X9 21 30 pages
=MK2+E02-X9
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E02
STRIP : X52
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
20.5 21
20.5 22
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 22
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E02-X52 22 30 pages
=MK2+E02-X52
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03
STRIP : QF20X
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
32.4 31
32.3 32
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 23
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-QF20X 23 30 pages
=MK2+E03-QF20X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03
STRIP : QL22X
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
15.6 13
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 24
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-QL22X 24 30 pages
=MK2+E03-QL22X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03
STRIP : QL31X
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
15.6 2
32.5 11
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 25
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-QL31X 25 30 pages
=MK2+E03-QL31X
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03
STRIP : X01
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 26
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-X01 26 30 pages
=MK2+E03-X01
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03
STRIP : X5
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 27
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-X5 27 30 pages
=MK2+E03-X5
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03
STRIP : X52
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
15.6 5
15.5 9
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 28
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-X52 28 30 pages
=MK2+E03-X52
54
53
TERM.MK2
INSTALLATION : =MK2
TERMINAL STRIP LOCATION : +E03
STRIP : XDC
FROM TO
INSTALLATION LOCATION DEVICE ID CONNPOINT WIRE- CROSS- TERMINAL- INSTALLATION LOCATION DEVICE ID CONNPOINT
No. REFRENCE JUMPER No.
32.5 8
EDHP
Final 17-07-2009 PRO.MANAGER Ho Xuan Tung 06-02-2009
04 30-06-2009 DEP.MANAGER Nguyen Xuan Quynh 110KV VINH TUONG SUBSTATION TERMINAL STRIPS +MK2_MODIFICATION + TERM.MK2
Dwg number Page 29
03 17-04-2009 CHECKER Do Minh Viet
Rev Date DESIGNER Tran Quang Minh Project code : P09-006 =MK2+E03-XDC 29 30 pages
=MK2+E03-XDC
54
53
TERM.MK2