0% found this document useful (0 votes)
199 views4 pages

3 RN Sop PDF

The document outlines standard operating procedures for barbed wire fencing work, including preparing the work area, making concrete pillars, and installing the pillars. It details the processes, associated hazards, required personal protective equipment, and controls that should be implemented for each task.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
199 views4 pages

3 RN Sop PDF

The document outlines standard operating procedures for barbed wire fencing work, including preparing the work area, making concrete pillars, and installing the pillars. It details the processes, associated hazards, required personal protective equipment, and controls that should be implemented for each task.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

M/S RINKU NAYAK

STANDARD OPERATING PROCEDURE


DOC. NO.-RN/SOP/03/01
REVISION NO-01

Dept./Section CIVIL & STRUCTURAL MAINTAINANCE SOP.NO.- 01

Location of Job Joda Date:-

Job Description Barbed Wire Fencing

Activity (What) Detail Process (How) Associated Controls to be put in


Hazards/Impacts place & responsibility

1.Before start of Safety :- Responsibility


work(preparing 1-Introduction of Work Hazard/Aspect: Supervisor
for the job) permit system. a. Fall of materials Safety supervisor
2-TBT before start of work. b. Fall of man Controls to be put in
3-Proper PPE to be worn c. Mishandling of place
by workers. tools 1.Proper checking &
4- Materials to be carried d. Bad housekeeping giving instruction to
with proper care to the e. Movement of other workers
work site. vehicles 2. Timely awareness
5- Tools checklist to be f. Sharp corners of provided to workers.
verified before work starts. material/tools 3.Weight chart if
6- Proper cleaning of area carried. available.(25 kg for men &
should be done before Impact: 16 kg for women)
work starts. • Body injury 4.Barricade if necessary.
• Material damage 5.Good housekeeping
Environment :- • Hit 6.Tools to be carried with
• Slip & trip tool kit.
Quality :- • Cut

Seasonal :-

Ergonomical:-

PPEs Safety shoe , safety helmet, nose mask, safety goggles, safety gloves, Fluorescent Jacket

Tools/ Masonry Trowels, Gamla, Float , Watering can

Equipments
M/S RINKU NAYAK
STANDARD OPERATING PROCEDURE
DOC. NO.-RN/SOP/03/01
REVISION NO-01

Dept./Section Civil Sop. No.-01

Location of Job Date :

Job Description Barbed Wire Fencing

Activity (What) Detail Process (How) Associated Requirements/ Controls to be put in


place & responsibility
Hazards/Impacts

1-Work permit system Hazards:- Responsibility


2.Concrete Pillar
Making 2- TBT before start of work. 1.Slippery Surface

3- Good housekeeping 2.Improper Work practice Worker


needed around work
Safety supervisor
area. 3.Bad housekeeping
4-Iron rods are cut Site supervisor
with the help of cutter 4.Frayed wire
machine . Controls to be put in
5-Iron rods assembled 5.Cutting machine place
in proper size(4inch×
4inch,length- 2m) with 6.Dust 1. TBT should be provided
the help of wire for before work.
concreting. 7.Splinters
6-Cement, sand & 2. Proper PPE should be
chips mixture are provided.
mixed with
Impact:- 3. Proper supervision
water(manually) and
required.
poured in the steel
1.Slip & Fall
casing with iron rods 4. Barricade
inside.
3.Electric Shock
7-Then the casing is 5. Good housekeeping.
left for some time to
4.Body injury 6. Tools/equipment
bind & dry up concrete
mixture. checklist.
5.Property Damage
8-When mixture dries
up the casing is 7.First- aid box
6.Cut
removed & left pillar
8.Unauthorised access
made in the open 7.Eye Injury prohibited
space for drying up for
some time.

PPEs Safety shoe , safety helmet, nose mask, safety goggles, safety gloves, safety jacket

Tool/ Cutting Machine, Shovel, Masonry Trowel, Watering Can, Steel Case
Equipments
M/S RINKU NAYAK
STANDARD OPERATING PROCEDURE
DOC. NO.-RN/SOP/03/01
REVISION NO-01

Dept./Section Civil Sop. No.-01

Location of Job Date :

Job Description Barbed wire Fencing

Activity (What) Detail Process (How) Associated Requirements/ Controls to be put in


place & responsibility
Hazards/Impacts

1.Work permit system Hazards:- Responsibility


3.Installation Of
Concrete Pillar 2.TBT before start of work. 1.Uneven Surface Worker/Driver

3.Concrete pillar(4inch×4 2.Improper Work practice Safety supervisor


inch) made is transported
to the work site with the 3.Bad housekeeping Site supervisor
help of pick-up van.
4.It is unloaded manually 4.Biological Hazard Controls to be put in
from pick-up van ,with place
proper PPE and 5.Dust
following Material 1. TBT should be provided
Handling guidelines. 6.Splinters before work.
5.If any bush is found on
the area, the area is 7.Roll down of vehicle. 2. Proper PPE should be
properly set in order by provided.
cutting bush.
6.One foot hole is made 3. Proper supervision
with Crowbar on the Impact:-
required.
designated spot(gap of
1.Slip & Fall
4m between pillars) on 4. Barricade
the ground & grouted the
3.Unconciousness
concrete pillar with 5. Good housekeeping.
cement mixture.
4.Body injury
7.Then enamel paint is 6. Tools checklist.
painted on the pillar for
5.Property Damage
marketion . 7.First- aid box
6.Cut
8.Unauthorised access
7.Dash prohibited.

9. Caution Board/ Signage

PPEs Safety shoe , safety helmet, nose mask, safety goggles, safety gloves, safety jacket

Tools/ Pick-up Van, Digging bar, Sickle, Masonry Trowel, Gamla, Paint brush
Equipments
M/S RINKU NAYAK
STANDARD OPERATING PROCEDURE
DOC. NO.-RN/SOP/03/01
REVISION NO-01

Dept./Section Civil Sop. No.-01

Location of Job Date :

Job Description Barbed wire Fencing

Activity (What) Detail Process (How) Associated Requirements/ Controls to be put in


place & responsibility
Hazards/Impacts

1.Work permit system Hazards:- Responsibility


4.Fencing of
Barbed Wire. 2.TBT before start of work. 1.Uneven Surface Worker/Driver

3. Barbed wire is 2.Improper Work practice Safety supervisor


transported to the work
site with the help of Pick- 3.Bad housekeeping Site supervisor
up Van.
4. It is unloaded with 4.Biological Hazard Controls to be put in
Leather hand gloves on place
& following material 5.Spike on Barbed Wire
handling guidelines. 1. TBT should be provided
5.Barbed wires(12mm 6.Roll down of vehicle. before work.
gauge) are stretched and
tied to the concrete 2. Proper PPE should be
pillars carefully. provided.
6.Barbed wires are cut Impact:-
wherever necessary with 3. Proper supervision
pliers/wire cutters. 1.Slip & Fall
required.
2.Body injury
4. Barricade
3.Unconciousness
5. Good housekeeping.
4. Cut
6. Tools checklist.
5.Property Damage
7.First- aid box
6. Dash
8.Unauthorised access
prohibited.

9. Caution Board/ Signage

10.Leather Gloves

PPEs Safety shoe , safety helmet, nose mask, safety goggles, leather gloves, safety jacket

Tools/ Pick-up Van, Pliers/ Wire Cutter