The document outlines a schedule for construction activities including excavation works, foundation construction, column installation, waterproofing, slab installation, masonry works, plastering, flooring, wall tiling, and painting from January 2013 through July 2013. The schedule includes activity names, estimated durations in days, start and finish dates, and lags between activities.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
54 views
Lesson31 1
The document outlines a schedule for construction activities including excavation works, foundation construction, column installation, waterproofing, slab installation, masonry works, plastering, flooring, wall tiling, and painting from January 2013 through July 2013. The schedule includes activity names, estimated durations in days, start and finish dates, and lags between activities.