O/C E/F Relay Test Report

The document is a test report for overcurrent and earth fault protection relay for the 33kV grid incoming feeder at the Shibati 33/11kV substation in Bangladesh. The relay tested is a Siemens 7SJ80 model. Testing included metering checks, protection tests for IDMT and DMT characteristics, and functional checks. All tests including pickup values, time curves, output contacts and LED indicators passed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
336 views2 pages

O/C E/F Relay Test Report

The document is a test report for overcurrent and earth fault protection relay for the 33kV grid incoming feeder at the Shibati 33/11kV substation in Bangladesh. The relay tested is a Siemens 7SJ80 model. Testing included metering checks, protection tests for IDMT and DMT characteristics, and functional checks. All tests including pickup values, time curves, output contacts and LED indicators passed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

O/C E/F Relay Test Report Page 1 of 2

Customer Bangladesh Power Development Board (BPDB)


Project 33/11 Kv Upgradation & Renovation at Shibati Substation PKG-5
Contract Contract No-10350 PKG-5
Substation Shibbati 33/11kV Substation
Location/Feeder 33kV Grid Incoming Feeder (L1)

Equipment Data
Manufacturer Siemens, Germany
Type 7SJ80 Serial BF1903501294
Supply Voltage 60-250 Vdc/115-240 Vac Frequency 50/60 Hz
Rated Current, In 1/5 A
Rated Voltage, Un 100-125 Vac

Metering Check
CT Ratio: 500/1 A
Current Check
IA (A) IB (A) IC (A) IE (A)
Injected Secondary Current, A 1.00 1.00 1.00 1.00
Relay Metered Current, A 500.2 500.2 500.6 500.3

Protection Tests

Protection test - O/C & E/F (50/50N)


IDMT Test, IEC SI Phase A, I> Phase B, I> Phase C, I> Ie>
Current Setting, xIn 0.1 In 0.1 Ien
TMS 0.1 0.1
Pick Up Current, A 0.55 0.55 0.55 0.55
Drop Off Current, A 0.52 0.52 0.52 0.52
Tripping Time at 2X Current, ms 1026.0 1022.3 1027.0 1025.4
Tripping Time at 5X Current, ms 515.0 514.6 511.0 516.4
Tripping Time at 10X Current, ms 401.2 400.9 401.0 400.8

Protection test - O/C & E/F (51/51N)


DMT Test Phase A, I>>> Phase B, I>>> Phase C, I>>> Ie>>>
20 In Not
Current Setting, In assigned
Time 20 ms --
Pick Up Current, A 20.51 20.51 20.52 --
Drop Off Current, A 19.37 19.37 19.38 --
Tripping Time at 0.95X Current, ms 25.6 25.3 26.3 --
Tripping Time at 1.2X Current, ms 26.1 24.2 26.2 --

Functional & System Checks

For SEA/AKES For SWPL For BPDB/NESCO Date:


26/06/2020
O/C E/F Relay Test Report Page 2 of 2

Customer Bangladesh Power Development Board (BPDB)


Project 33/11 Kv Upgradation & Renovation at Shibati Substation PKG-5
Contract Contract No-10350 PKG-5
Substation Shibbati 33/11kV Substation
Location/Feeder 33kV Grid Incoming Feeder (L1)

Output contacts (Trip & Alarm) Passed


Date & Time Date/Time settings couldn’t be saved
LED (Trip & Alarm) Passed
Watchdog/IRF Relay IRF Alarm available for X100:SO Relays
Input Status Passed
CB Trip by relay Passed

For SEA/AKES For SWPL For BPDB/NESCO Date:


26/06/2020