This document provides the civil design calculations for the foundation of a 70 kiloliter underground storage tank that is 2.75 meters in diameter and 13 meters long at Gautam Budha International Airport in Bhairahawa, Nepal. Key details of the design include dimensions and loads of the tank and raft foundation, material properties, seismic design parameters, reinforcement requirements, and verification of shear capacity, moment capacity, and resistance to flotation. The calculations conclude that the reinforced concrete raft foundation design meets all code requirements.

Uploaded by

becpavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
251 views5 pages

Design - Underground Raft FDN - R0

This document provides the civil design calculations for the foundation of a 70 kiloliter underground storage tank that is 2.75 meters in diameter and 13 meters long at Gautam Budha International Airport in Bhairahawa, Nepal. Key details of the design include dimensions and loads of the tank and raft foundation, material properties, seismic design parameters, reinforcement requirements, and verification of shear capacity, moment capacity, and resistance to flotation. The calculations conclude that the reinforced concrete raft foundation design meets all code requirements.

Uploaded by

becpavan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

GAUTAM BUDHA INTERNATIONAL AIRPORT,

BHAIRAHAWA, NEPAL
DOCUMENT TITLE: CIVIL DESIGN CALCULATION FOR
70 KL UG TANK
(2.75 M I.D x 13.0 M LG) FOUNDATION
CONTRACTOR DOC. NO: NOC:/ATF/GEC/70KL/02

CIVIL DESIGN CALCULATION FOR 70 KL UG TANK FOUNDATION

(TANK SIZE : 2.75 M DIA X 13 M )

0 04.07.20 ISSUED FOR APPROVAL JAY SG NA


REV. DATE ISSUE PURPOSE PREP. CHECKED APPROVED
PAGE 1 OF 5
GAUTAM BUDHA INTERNATIONAL AIRPORT,
BHAIRAHAWA, NEPAL
DOCUMENT TITLE: CIVIL DESIGN CALCULATION FOR
70 KL UG TANK
(2.75 M I.D x 13.0 M LG) FOUNDATION
CONTRACTOR DOC. NO: NOC:/ATF/GEC/70KL/02

RAFT PLAN
0.75

X
3.75

14.5

RAFT ELEVATION

GL

3.662

0.3

Length of Raft = 14.5 m


Width of Raft = 3.75 m
Height of Raft = 0.3 m
Depth of underground tank = 3.662 m
Height of pedestal = 0 m
Width of pedestal = 0 m
Length of pedestal = 0 m
No. of tanks = 1
No. of Pedestal per tank = 0 m

Empty weight of tanks = 11000 kg


Capacity of tank = 70 KL
Operating weight of tanks = 67490 kg
Hydrotest weight of tanks = 87000 kg
PAGE 2 OF 5
GAUTAM BUDHA INTERNATIONAL AIRPORT,
BHAIRAHAWA, NEPAL
DOCUMENT TITLE: CIVIL DESIGN CALCULATION FOR
70 KL UG TANK
(2.75 M I.D x 13.0 M LG) FOUNDATION
CONTRACTOR DOC. NO: NOC:/ATF/GEC/70KL/02
3
Unit weight of concrete = 2500 kg/m
Dead load of foundation = 40781.3 kg
2
SBC of soil = 15 T/m
2
Base pressure = 2.4 T/m HENCE OK

Grade of concrete = M25


2
Max. shear strength (τc max) = 1.9 N/mm , Table 24 of IS:456
2
190 T/m
Grade of steel = Fe415

Zone factor value (Z) = 0.24 (Table 2 , IS:1893,2002 Pt. 1)


Importance factor (I) = 1.75 (Table 5 , IS:1893,2002 Pt. 4)
Response reduction factor (R ) = 3 (Table 7 , IS:1893,2002 Pt. 1)
Damping % = 5 (Table 7 , IS:1893,2002 Pt. 4)
Multiplying Factor = 1 (Table 3 , IS:1893,2002 Pt. 1)

Horizontal Seismic Coefficient Ah = (ZI/2R)X(Sa/g) = 0.070 Sa/g (Cl. 6.4.2 , IS:1893,2002 Pt. 1)
Sa/g = Average response acceleration Coefficient (Cl. 6.4.2 , IS:1893,2002 Pt. 1)
Seismic Weight of structure (W) = DL+0.5IL = 80.03 T Say 81 T
Where , DL = Dead Load & IL = Imposed Load i.e Live Load in this case
(Refer Cl. 7.3 of IS:1893,2002 Pt. 1)

Base shear calculation based on Fundamental Natural period(Ta) as per Cl. 7.6.1 of IS:1893,2002 Pt. 1
0.75
Ta = 0.075h = 0.20 ( h = height of structure)
So, Sa/g = = 2.50 …Cl. 6.4.5 of IS:1893, 2002 Pt. 1

Ah = 0.175
Hence Base Shear = 14.18 T 14175 KG
Moment created by Base shear (Base Shear X Height of Structure ) M = 51.91 T.m
3
Section Modulus along X axis Zx = 33.98 m

Soil Pressure σ = P/A ± M/Zx

2
σmax = P/A + M/Zx = 3.877 T/m HENCE OK
2
σmin = P/A - M/Zx = 1.933 T/m HENCE OK

Dia of reinforcement considered = 12 mm


2
Area of reinforcement = 113.1 mm
Clear cover to reinforcement = 50 mm
Effective depth of Raft (d) = 244 mm
PAGE 3 OF 5
GAUTAM BUDHA INTERNATIONAL AIRPORT,
BHAIRAHAWA, NEPAL
DOCUMENT TITLE: CIVIL DESIGN CALCULATION FOR
70 KL UG TANK
(2.75 M I.D x 13.0 M LG) FOUNDATION
CONTRACTOR DOC. NO: NOC:/ATF/GEC/70KL/02
2
Area resisting one way shear Av = 2.8 m
Max. Shear (σmax X Av) Vu = 10.9 T
Required effective depth of raft (Vu / τc max) = 0.057 m
= 57.4 mm HENCE OK

Ultimate moment Mu = wl/2 = 1.5 Tm


Mu/bd2 = 0.24 N/mm
2

Corresponding Ast From Table 3 of SP16 = 0.084


Ast required = 25.2 mm2 per meter length
Factor of Safety = 1.5
2
So, actual Ast required = 37.8 mm per meter length
Spacing of reinforcement provided = 250 mm
Ast provided = 452.39 mm2 HENCE OK

So, provide 12mm dia reinforcements at 250 mm spacing along Z axis


& Provide 8mm dia @ 175mm C/C reinforcement along X axis as transverse reinforcement

FLOTATION CHECK AGAINST BUOYANCY CALCULATION FOR SINGLE RAFT-

Volume of displaced fluid in case of flooding by raft (14.5 x = 199.121 m3


3.75 x 3.662 m 3 ) = 199121.3 liter
Weight of fluid = 199121.3 kg

Weight of 1no. empty tank = 11000 kg


Weight of foundation (14.5x3.75x0.3x2500 kg) = 40781.3 kg
3
Total approx. volume of Compacted soil fill on raft = 121.91 m
3
Unit wt of compacted soil = 1600 kg/m
Weight of compacted soil = 195050.9 kg

Total downward load = 246832.1 kg

Since 246832.1 > 199121 kg Hence OK

The tank is safe against flotation from 100% saturated soil buoyancy.

Volume of displaced fluid by Tank ( π2.75 2 /4 X 13) = 77.21 m


3

= 77214.46 liter
Weight of fluid = 77214.46 kg
Excluding selfweight of tank = 66214.46 kg
No. of Bolts holding Tank = 16
PAGE 4 OF 5
GAUTAM BUDHA INTERNATIONAL AIRPORT,
BHAIRAHAWA, NEPAL
DOCUMENT TITLE: CIVIL DESIGN CALCULATION FOR
70 KL UG TANK
(2.75 M I.D x 13.0 M LG) FOUNDATION
CONTRACTOR DOC. NO: NOC:/ATF/GEC/70KL/02

Dia of single Bolt = 28 mm


2
Area of Single bolt = 461.8 mm
Charecteristic Yield Stress of bolt (fy) = 240.0 N/mm2
Capacity of single bolt = 10271.1 KG
Total capacity = 164337.5 KG
Hence OK