0% found this document useful (0 votes)
84 views

Standards Alert: Stdsa555 Introduction of Noja 11 KV, 22Kv & 33Kv KV Rc20 Synchrophasor Controllers

Energy Queensland will be introducing the NOJA RC20 Synchrophasor recloser controller as part of a trial to collect time-synchronized phasor data from 50 recloser sites to study the impact of renewables; the RC20 requires some construction and commissioning changes compared to the RC10 including additional modems and a higher rating fuse; the document provides guidelines on planning, construction, replacement and updates to manuals for the RC20 trial.

Uploaded by

Nazmul Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views

Standards Alert: Stdsa555 Introduction of Noja 11 KV, 22Kv & 33Kv KV Rc20 Synchrophasor Controllers

Energy Queensland will be introducing the NOJA RC20 Synchrophasor recloser controller as part of a trial to collect time-synchronized phasor data from 50 recloser sites to study the impact of renewables; the RC20 requires some construction and commissioning changes compared to the RC10 including additional modems and a higher rating fuse; the document provides guidelines on planning, construction, replacement and updates to manuals for the RC20 trial.

Uploaded by

Nazmul Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 16

Uncontrolled Document When Printed

Standards Alert
Subject: Control Ref No: StdsA555
StdsA555 Introduction of NOJA 11 kV, Date Issued: 04/02/2020
22kV & 33kV kV RC20 Synchrophasor
Controllers Supersedes: N/A
Energex and Ergon Overhead
For Policy/Procedure/Manual: Expiry Date: 30/06/2021
Construction Manuals
Originating Dept: Asset Standards:- Line Standards
Target Audience: Energy Queensland

1. Amendment Record

Version Date Author Amendments


Initial 03/02/2020 Paul Relf Initial Issue

2. Objective

This standards alert covers the introduction of the NOJA 11kV, 22kV & 33kV RC20 Synchrophasor.

3. Introduction

Energy Queensland will be introducing the NOJA 11kV, 22kV & 33kV RC20 Synchrophasor as a part of
the ARENA/NOJA Power Synchrophasor Project. The recloser controllers will have time-synchronised
phasor (synchrophasor) measurement capability. This synchrophasor data will be used for further research
and development into the impact of renewables on the medium voltage distribution network. EQL has
committed to install 50 reclosers, to collect and store data generated by the synchrophasor units and to
provide input and assistance on a range of other project activities.

The NOJA RC20 Synchrophasor recloser is a part of the trial which will run for 18 months from the date of
installation of the reclosers. There will be no other RC20’s available to be ordered other than the 50 units.

The North South will be trialling 11kV, 22kV and 33kV RC20’s while the Southeast will only have the 11kV
option.

Page 1 of 5 This Standards Alert will remain in force until either the expiry date is exceeded, or update of Dept Head
the relevant sections of the specified manuals has occurred.
StdsA555 RC20 Synchrophasor Controllers for Energy Queensland
Uncontrolled Document When Printed

The NOJA RC20 Synchrophasor is virtually identical to the current NOJA RC10 Recloser unit, except for
an additional modem/antenna and some control box/software changes.

RC10 (Southeast) Internal RC20 (Southeast) Internal

Single Utilitinet Radio Used Two modems used, Cybertec and Utilitinet Radio

4. Supplier

The new RC20 Synchrophasor is supplied by NOJA. There has been an initial order of 50 units. These 50
units have all been allocated specific sites and will be rolled out accordingly.

5. Planning Guidelines

The pole construction includes manually operated isolation switches thereby allowing the site to be
considered as an approved isolation point.

The recloser is supplied with an external 11kV, 22kV or 33kV /220V voltage transformer to provide auxiliary
supply to the control box.

Page 2 of 5 This Standards Alert will remain in force until either the expiry date is exceeded, or update of Dept Head
the relevant sections of the specified manuals has occurred.
StdsA555 RC20 Synchrophasor Controllers for Energy Queensland
Uncontrolled Document When Printed

6. Construction/commissioning – what’s different

a) All Areas

• The RC20 controller requires a 6A LV fuse to be installed in the VT when


upgrading an existing NOJA RC10 site to RC20 or in the event of a blown fuse.
The standard 2A fuse used in the RC10 is not adequate for the RC20 controller
and additional modems.

b) Southeast

• Use of an additional Cybertec modem along with the traditional Utilitinet/Mesh


Radio. The Cybertec modem is used to receive the synchrophasor data.

• Hence there will be two antennas, one antenna mounted on the control box and
the traditional antenna mounted on the pole

• The commissioning instructions are provided to Pole Mounted Plant crews and
Work practise documents have been updated to reflect these changes.

c) North/South

• Use of an additional CISCO modem along with the traditional Cybertec modem.
The CISCO modem is used to receive the synchrophasor data.

i. NOTE: during the testing of the CISCO modem it has been noted that the
modem gets very hot. Caution must be taken when working with the
CISCO modem. Appropriate protective gear (gloves) to be used.
ii. A risk assessment has been completed by Comms Design team to identify
the risk of overheating of the Cisco modem. The outcome of the risk
assessment is that only risk is a burn risk while handling the Cisco modem,
gloves are to be used for operation of the modem.

• There will be an Input/ Output (I/O) module fitted inside the control box. This I/O
module is used to turn off the CISCO modem in case of mains power loss.

• There will be two antennas used, these will be available in the Overhead
Construction Manual for reference.

7. Stores Availability and Item Lead time

There are 37 RC20 units delivered to Eagle Farm Distribution Centre and 13 RC20 units delivered to
Banyo stores. These units are ready to be picked for projects.

The lead times for delivery of the units will be as per the standard delivery times of RC10.

8. Replacement / spares

The RC20 reclosers are covered under the standard NOJA warranty. It has a 24-month warranty, any
failure would need to be reported, effected component returned to NOJA for evaluation. If the fault is
covered under warranty, NOJA will repair or replace the controller.

Page 3 of 5 This Standards Alert will remain in force until either the expiry date is exceeded, or update of Dept Head
the relevant sections of the specified manuals has occurred.
StdsA555 RC20 Synchrophasor Controllers for Energy Queensland
Uncontrolled Document When Printed

In case of a failure of an RC20, the crew should install an RC10 controller and notify Deepthi Yogiswara
about the fault and location and proceed with the standard procedure.

The SCADA point mapping for the RC20 controller units is the same as the RC10 controller units to
simplify replacement.

9. Design Guidelines

The switch may only be mounted mid pole.

9.1 Ergon Compatible Units and Construction Codes

The Compatible Code for the RC20 Synchrophasor (which includes the recloser, VT, and sundry
materials) are S113ACR20SP3, S223ACR20SP3, S333ACR20SP3, S113RLB20SP3, and the
Construction Codes are SW11/3/ACR20S/PG3, SW22/3/ACR20S/PG3 AND
SW33/3/ACR20S/PG3.

9.2 Energex Compatible Units (CU’s)

The Compatible Unit (CU) for the RC20 Synchrophasor (which includes the recloser, VT, and
sundry materials) is 11SYN/NOJAFF.

10. Update to Manuals

10.1 Ergon Overhead Construction Manual Updates

Ergon OHCM “Assembly” Page 305 have been created for the RC20 Synchrophasor.

Ergon OHCM “Switches” Drawings 1175 Sh4, 1952 Sh1, 1952 Sh2,1952 Sh3 and 1952 Sh5 have
been updated to include the RC20 Synchrophasor.

10.2 Energex Overhead Construction Manual Updates

Energex OHCM Pages 7-205 and 7-206 have been updated to include the RC20 Synchrophasor.

The latest versions of Overhead Construction Manuals available via the Asset Standards intranet site or
via the RED/Process Zone document system for internal staff.

The current manuals are available to external service providers via the internet. The Manuals are
uncontrolled documents when printed.

Page 4 of 5 This Standards Alert will remain in force until either the expiry date is exceeded, or update of Dept Head
the relevant sections of the specified manuals has occurred.
StdsA555 RC20 Synchrophasor Controllers for Energy Queensland
Uncontrolled Document When Printed

11. Further Information


For further information, please contact-
Overhead Construction Manuals
• Paul Relf, 07 3664 4797, email: [email protected]
• Craig Avenell, 07 4931 2782, email: [email protected]
Communications Contact
Southeast –
• Scott Istria, 07 3664 8156, email: [email protected]
North/South –
• Luke Arnold, 07 4932 7137, email: [email protected]
SCADA Contact
• Peter Poulos, 07 3664 4426, email: [email protected]
Protection Contact
• Brenton O’Sullivan, 07 4789 5814, email: Brenton.O'[email protected]
All General Enquiries –
• Deepthi Yogiswara, 07 3664 5203, email: [email protected]

Page 5 of 5 This Standards Alert will remain in force until either the expiry date is exceeded, or update of Dept Head
the relevant sections of the specified manuals has occurred.
StdsA555 RC20 Synchrophasor Controllers for Energy Queensland
Uncontrolled Document When Printed
Uncontrolled Document When Printed
ABS / GAS / VACUUM SWITCHES - CONSTRUCTION CODE Uncontrolled Document When Printed

Code shown within dashed box


appears on relevant construction A SW 22/3/ABST/CL1
detail drawings in this manual.

SWITCH
VOLTAGE
SW No. OF PHASES MAINS CONNECTION
11 = 11kV
22 = 22kV 3 = Three phase PG3 = Connector, Al./Steel - Cu.
33 = 33kV 35-300mm† / 35-240mm†
PG4 = Connector, Cu.-Cu.
16-150mm† / 16-150mm†
CL1 = Lug Bi-metal 35mm†
CL2 = Lug Bi-metal 50mm†
CL3 = Lug Bi-metal 95mm†
SWITCH CODE CL4 = Lug Bi-metal 120mm†
CL5 = Lug Bi-metal 240mm†
ABST = Air break switch pole top mounted
ABSM = Air break switch mid pole mounted
ABSLBT = Air break switch with Load break pole top mounted
ABSLBM = Air break switch with Load break mid pole mounted
LBGT1 = Load break gas switch pole top mounted NGK-S NU series
LBGM1 = Load break gas switch mid pole mounted NGK-S NU series
RLBM = Remote Load break gas switch mid pole mounted Schneider RL series ADVC controller
LBGT2 = Load break gas switch pole top mounted ILJIN GA-Series
LBGM2 = Load break gas switch mid pole mounted ILJIN GA-Series
ILBGM2 = Load break gas switch mid pole mounted ILJIN GA-Series (Existing intermediate pole)
RLBM1S = Remote load break switch mid pole mounted Noja OSM series with RC10 controller, spur
RLBM1R = Remote load break switch mid pole mounted Noja OSM-Series with RC10 controller, ring fed
RLBM2S = Remote load break switch mid pole mounted Noja OSM series with RC10 controller, spur, under supply (NULEC REPLACEMENT)
RLB20S = Remote load break switch mid pole mounted Noja OSM series with RC20 controller, spur

EXAMPLES:- SW22/3/ABST/CL1 = Switch, 22kV, 3 phase, Air break switch top mounted, Lug Bi-metal 35mm†

A ORIGINAL ISSUE APPROVED C. Noel OVERHEAD DISTRIBUTION


C 24.3.14
HARD COPY DATE 17.2.09
SWITCHES
CONSTRUCTION CODE GUIDE
D 11.7.14
ABS / GAS / VACUUM
E 2.3.15 UNCONTROLLED Ergon Energy Corporation Ltd
PASSED C. Avenell

F 28.6.19 ABN 50 087 646 062


DRAWN L. Burton FILE: 5 07 1175 3
Dwg 1175 Sh 3 F
RECLOSER SWITCHES - CONSTRUCTION CODE Uncontrolled Document When Printed

Code shown within dashed box


appears on relevant construction A SW 22/3/ACR2/PG3
detail drawings in this manual.

SWITCH VOLTAGE No. OF PHASES SWITCH CODE MAINS CONNECTION

SW 11 = 11kV S = S.W.E.R. OCR1 = Oil circuit recloser 5A coil 2A2B sequence PG3 = Connector, Al/steel-Cu
12 = 12.7kV 1 = Single phase OCR2 = Oil circuit recloser 5A coil 1A3B sequence 35 - 300mm† / 35 - 240mm†
19 = 19.1kV 3 = Three phase OCR3 = Oil circuit recloser 10A coil 2A2B sequence PG4 = Connector, Cu.-Cu.
22 = 22kV OCR4 = Oil circuit recloser 10A coil 2A2C sequence
16 - 150mm† / 16 - 150mm†
33 = 33kV OCR5 = Oil circuit recloser 10A coil 1A3B sequence
LL1 = Live line clamp / Al. mains
OCR6 = Oil circuit recloser 10A coil 1A3C sequence
(5 - 19mm)
OCR7 = Oil circuit recloser 15A coil 2A2B sequence
OCR8 = Oil circuit recloser 15A coil 2A2C sequence
OCR9 = Oil circuit recloser 15A coil 1A3B sequence
OCR10 = Oil circuit recloser 15A coil 1A3C sequence
OCR11 = Oil circuit recloser 25A coil 1A3B sequence
OCR12 = Oil circuit recloser 25A coil 1A3C sequence
ACRTNE = Auto. circuit recloser with V.T. For Non-effectively earthed areas (Nulec N series 3 phase)
ACR2 = Auto. circuit recloser with VT (Schneider N series 3 Phase & W series SWER) with ADVC controller spur
ACR2NE = Auto. circuit recloser with VT For Non-effectively earthed areas (Schneider N series 3 phase) spur
ACRR = Auto circuit recloser with VT (Schneider N series 3 phase) with ADVC controller ring fed
ACRRNE = Auto circuit recloser with VT (Schneider N series 3 phase) for non-effectively earthed areas ring fed
ACR4S = Auto circuit recloser with VT (NOJA OSM-Series, 3 phase with RC10 controller) spur
ACR4R = Auto circuit recloser with VT (NOJA OSM-Series, 3 phase with RC10 controller) ring fed
ACR5S = Auto circuit recloser with VT (NOJA OSM-Series, 3 phase with RC10 controller) spur, under supply (NULEC REPLACEMENT)
NRLBS = NOJA OSM series recloser with RC10 controller set up as a remote LBS, spur
NRLBR = NOJA OSM series recloser with RC10 controller set up as a remote LBS, ring fed
ACR20S = Auto circuit recloser with VT (NOJA OSM-Series, 3 phase with RC20 controller) spur

EXAMPLES:- SW22/3/ACR2/PG3 = Switch, 22kV, 3 phase, Auto. Circuit recloser with VT (Schneider N series), P.G. connection, Al mains.

A ORIGINAL ISSUE APPROVED C. Noel OVERHEAD DISTRIBUTION


SWITCHES
D
E
22.5.12

5.2.13
HARD COPY DATE 17.2.09
CONSTRUCTION CODE GUIDE
PASSED RECLOSER
F 11.7.14 UNCONTROLLED Ergon Energy Corporation Ltd
C. Avenell

G
G 4.12.18 ABN 50 087 646 062
DRAWN L. Burton FILE: 5 07 1175 4
Dwg 1175 Sh 4
Uncontrolled Document When Printed
MATERIAL - BY-PASS CONSTRUCTION (SHEET 5) MATERIAL - ACR / SECT / LBS (Sheet 5.)

ASSY DESCRIPTION QTY ASSY DESCRIPTION QTY


142-1 EDO Fuse Switch (100A) 11/22kV to undrilled x-arm (100) 281-3 ACR / Sect / LBS 11kV 3 phase

142-2 EDO Fuse Switch (100A) 11/22kV to undrilled x-arm (125) 281-6 ACR / Sect / LBS 22kV 3 phase
3
142-3 EDO Fuse Switch (100A) SWER/33kV to undrilled x-arm (100) 281-9 ACR / Sect / LBS 33kV 3 phase
(including lead connection) 1
142-4 EDO Fuse Switch (100A) SWER/33kV to undrilled x-arm (125) 305-3 ACR 11kV 3 phase Synchrophasor

305-6 ACR 22kV 3 phase Synchrophasor

MATERIAL 305-9 ACR 33kV 3 phase Synchrophasor

ASSY DESCRIPTION QTY


25-26 Crossarm undrilled 3300x100x100 1 MATERIAL - VT EDO’S & LEADS

29-10 Crossarm undrilled single (100) 11/22/33kV to wood pole 1 ASSY DESCRIPTION QTY
54-10 Brace double 650T to undrilled x-arm (100) and wood pole 1 89-31 Fuse link 11/22/33kV 3/10A class K 2

140-18 Cable, insulated annealed Cu. 120mm† 10 140-6 Cable, insulated hard drawn Cu. 35mm† 3

87-5 Connector PG Al/steel-Cu. (PG3) 141-14 Lug Compression Cu. 35mm† M12 4
3
87-10 Connector PG Cu-Cu. (PG4) 142-1 EDO fuse switch (100A) 11/22kV to undrilled x-arm (100)
2
139-10 Switch solid link 11/22kV to undrilled x-arm (100) 142-3 EDO fuse switch (100A) 33kV to undrilled x-arm (100)
6
139-14 Switch solid link SWER/33kV to undrilled x-arm (100)
141-22 Lug, compression Cu. 120mm† M12 12

A ORIGINAL ISSUE APPROVED C. Noel OVERHEAD DISTRIBUTION


B SWITCHES
19.3.19
HARD COPY DATE 4/7/14
11/22/33kV 3 PHASE POLE MOUNTED SPUR ACR / SECT / LBS
PASSED C. Avenell WITH V.T. (NOJA OSM-SERIES) CONSTRUCTION - MATERIAL
UNCONTROLLED Ergon Energy Corporation Ltd
ABN 50 087 646 062
DRAWN L. Burton
FILE: 5 07 1952 1
Dwg 1952 Sh 1 B
Uncontrolled Document When Printed
MATERIAL - ACR / SECT / LBS CONSTRUCTION (SHEETS 5 & 6) NOTES:

ASSY DESCRIPTION QTY 1. All metalwork that passes through or into


wood shall be greased for the entire length
12-1 Cartridge Fuse Link 2A HRC (10G)
1 that may come into contact with the wood.
12-12 Cartridge Fuse Link 6A HRC (10G)
2. For wood pole attachments and foundations
25-12 Crossarm undrilled 2700 x 100 x 100 1 refer to Construction Practices.
27-13 Conduit PVC flexible 20mm 10m 3. VT used to supply switch only.
27-25 Terminator conduit PVC flexible 20mm 3 (Not for supplying consumers).

27-46 Saddle zinc plated 25mm 40 4. Designer to nominate bypass fuse element size
refer CONSTRUCTION PRACTICES dwg. 1695.
29-10 Crossarm undrilled single (100) 11/22/33kV to wood pole 1
5. 240V from pole mounted LV fuse must be
33-10 Brace single to undrilled x-arm (100) and wood pole 1
terminated into control cubical.
40-3 Pin insulator 22/33kV to 100 undrilled crossarm 6
6. Earthing bridge required between ACR / SECT / LBS
46-6 Insulator vice top 11/22/33kV (bridging) 6
tank and VT mounting plate.
64-1 Guard wildlife to wood pole 1
7. Designer to determine pole length by clearances
140-18 Cable, insulated annealed Cu. 120mm† (dropper leads) 18 required.
140-30 Cable, insulated 2 core & earth Cu 2.5mm† 10m 8. The following stock code numbers apply if the arrestors
141-1 Lug, compression Cu 2.5mm† M6 2 are to be replaced:
11kV - 0701082
141-22 Lug, compression Cu. 120mm† M12 12
22kV - 0701112
159-1 VT secondary fuse box to wood pole 1
33kV - 2403490

9. Mount control cubicle on footpath side in urban areas.

10.For RC20 controller drill the bracket to suit.


Cold galvanize all exposed metal on bracket.

11. 6A LV HRC fuse required for RC20 controller.

12. Fuse mounted in the VT requires upgrading to 6A when


upgrading RC10 to RC20 controller.

13. For antenna general arrangement refer


CONSTRUCTION PRACTICES folder dwg. 2000.

A ORIGINAL ISSUE APPROVED C. Noel OVERHEAD DISTRIBUTION


SWITCHES
B 1.12.14
HARD COPY DATE 7/7/14
11/22/33kV 3 PHASE POLE MOUNTED SPUR ACR / SECT / LBS
C 17.06.19
PASSED C. Avenell WITH V.T. (NOJA OSM-SERIES) CONSTRUCTION - MATERIAL
UNCONTROLLED Ergon Energy Corporation Ltd
ABN 50 087 646 062
DRAWN L. Burton
FILE: 5 07 1952 2
Dwg 1952 Sh 2 C
Load Supply
By-pass Uncontrolled Document When Printed
11/22/33kV CONSTRUCTION
Load N/O Supply
BYPASS SWITCH

Main structure/

y
y
y

Suppl
Suppl
Suppl
N/C N/C conductor

Load

Load
Load
minimum clearance:-
11kV - 160mm
F
F LINK X-ARM
22kV - 280mm
LBS F Wood Sheet 5 and 6
F
33kV - 380mm
SEC F Pole
F

ACR

BRIDGING X-ARM
H.V. Surge Construction Type
DRILLING DETAIL
Arresters Sheet 6 SW11/3/ACR4S
(11/22/33kV) V.T.
H.V BRIDGING SW22/3/ACR4S
H.V. WIRING DIAGRAM Sheet 5 SW33/3/ACR4S
Wood
ACR / SECT / LBS Pole SW11/3/ACR20S
Sheet 5 SW22/3/ACR20S
F

SW33/3/ACR20S
1200 min SW11/3/SECT8S
5.5m Min height 2000 preferred SW22/3/SECT8S
lowest HV point
F

to G.L.
SW33/3/SECT8S
LV CONSTRUCTION SW11/3/RLBM1S
Location Min height
to ground
SW22/3/RLBM1S
More than 500mm POLE DRILLING DETAIL SW33/3/RLBM1S
from the vertical
Sheet 4
projection of the 3.6m SW11/3/RLB20S
kerbline in the
EARTHING
direction away SW22/3/RLB20S
from the vehicular
Recloser earth Dwg.1433 or 1434
carriageway SW33/3/RLB20S
Elsewhere 4.6m
CONTROL CUBICLE SW11/3/NRLBS
Sheet 6 SW22/3/NRLBS
FF

FF

SW33/3/NRLBS

A ORIGINAL ISSUE APPROVED C. Noel OVERHEAD DISTRIBUTION


SWITCHES
B 27.11.14
HARD COPY DATE 4/7/14
11/22/33kV 3 PHASE POLE MOUNTED SPUR ACR / SECT /
C 29.4.15
PASSED C. Avenell LBS WITH V.T. (NOJA OSM SERIES) CONSTRUCTION
D 19.3.19 UNCONTROLLED Ergon Energy Corporation Ltd
ABN 50 087 646 062
DRAWN L. Burton
FILE: 5 07 1952 3
Dwg 1952 Sh 3 D
o

C
B
A
0

o o

29.4.15
27.11.14
ORI
ENTATI
ON 270 90

ORIGINAL ISSUE
o
180

ACR /SECT /LBS FI


TTI
NGS POLE STEPS

FI
TTI
NG I
TEM ORI
ENT. R.
L. HOLE DI
A. HOLE DI
A. R.
L.ORI
ENT.
00
00
o
Conduct
or Eyebol
t 0/
180 150 22
o
Conduct
or Eyebol
t 0/
180 225 22
o
HV X-
Arm Bol
t 0/
180 450 22

HARD COPY
By-
pass swi
tches

o
Li
nk X-
Arm Bol
t 0/
180 1700 22

UNCONTROLLED
o
Br
idgi
ng X-
Arm Bol
t 0/
180 3000 22

o
14 3300 270

ABN 50 087 646 062


14 3750 90

Ergon Energy Corporation Ltd


o

DATE
14 4200 270

DRAWN
PASSED
APPROVED o
o 14 4650 90
ACR /SECT /LBS Bol
t 0/
180 4700 22
W ood
7/7/14
o Pol
e
C. Noel

L. Burton
Bol
t 22
C. Avenell
ACR /SECT /LBS 0/
180 4980 o
14 270
5100 90/

o
LV ABC Hook Bol
t 90/
270 5900 22

o
LV X-
Arm Bol
t 0/
180 6200 22
SWITCHES

FILE: 5 07 1952 4

o
Cont
rolcubi
cle C’
scr
ew 0 XXXX 14
F

Dwg

Dr
illt
o sui
tcont
rolcubi
cle
1952
OVERHEAD DISTRIBUTION

Sh

o
F

Cont
rolcubi
cle C’
scr
ew 0 2900 14
4
F

Fr
om Gr
ound Level
F
Uncontrolled Document When Printed

LBS WITH V.T. (NOJA OSM-SERIES) DRILLING DETAIL

C
11/22/33kV 3 PHASE POLE MOUNTED SPUR ACR / SECT /
C
B
A
LOAD SUPPLY 00
150
I
nst
allHV St
rai
n
225

19.3.19
Cr
ossar
m on

27.11.14
Suppl
y Si
de 450

ORIGINAL ISSUE
Do noti
nst
allear
thi
ng Assy Sel
ect
ion
st
irr
up on bypass f
uses 142-
1t o4 Assy Select
ion
87-5 or10
Assy 54-10
Forbypass fuse Assy Sel
ect
ion
W ood
el
em entref
er Assy 25-26 140-
18 and
Pol
e
CONSTRUCTI ON 141-
22
Assy 29-10
PRACTI CES dwg.
1700
1695. Assy Selecti
on
139-10 or14
Not
e:
EDO’s and Links Assy 25-
12 Forl
ink and bri
dgi
ng

HARD COPY
Ref
erdr g 1585 cr
ossarm dril
li
ng
Assy 29-
10
CONSTRUCTI ON det
ail
s,r
efersheet6
Assy 40-
3
PRACTI CES
Assy Sel
ect
ion

UNCONTROLLED
Assy 46-
6 140-
6 and
141-
14
Assy 33-
10
3000
Assy 140-
18
141-22

Assy Selecti
on
SUPPLY
LOAD 142-1 or3 and

ABN 50 087 646 062


89-31

Ergon Energy Corporation Ltd


DATE

DRAWN
PASSED
ACR /Sect/LBS

APPROVED
Assy Sel
ection
4700
281-3,6 or9 or
280
305-3,6 or9
(ReferDetail’
A’) 4980

7/7/14
C. Noel

L. Burton
i
ncludes VT LV ABC

C. Avenell
5900

LV Open W i
re
Dr
opperl
ead 6200
700 m i
n.t
o bot
tom of
Shroud
HV ar
rest
er
SWITCHES

(
L/A connect
ion)
FILE: 5 07 1952 5

* *
Dwg

Ref
er
Det
ail’
A’

485
ACR /Sect/
1952

LBS l
ead
OVERHEAD DISTRIBUTION

Sh

*11kV -200
5

Ti
e,cable L/
Alead *22kV -350
Nylon Bl
ack *33kV -450
DETAI
L’A’ H.
V.SURGE ARRESTER BRI
DGI
NG
Uncontrolled Document When Printed

(
Incl
uded i
n Assem bl
y 281) *Denot
es m i
nim um cl
ear
ance Phase t
o Phase
LBS WITH V.T. (NOJA OSM-SERIES) HV BRIDGING

C
11/22/33kV 3 PHASE POLE MOUNTED SPUR ACR / SECT /
Uncontrolled Document When Printed
For RC20 controller
C use 6A LV fuses
26 26 26 L 26 26 26 Hole Dia. Wood
Assy 12-12 & 13
F F F F Pole
470 F
470 F
300 300 470 F
470 F

18 18 22 18 ACR / Sect / LBS


F F F 4700
450 F
550 F
660 F

280
4980

BRIDGING X-ARM DRILLING DETAIL Assy 27- 46 LV ABC


5900
(2700x100x100)
Assy Selection LV Open Wire
C 6200
18 18 18 L 18 18 18 Hole Dia. 159-1 and
F F F F 12-1 or 12 and 700 min. to bottom
350 650 F
550 F
550 F
650 F
350
27-25 and of HV arrester
18 22 18 140-30 and
F
375 F 375 141-1

Assy 64-1 From G.L.


3500 Min.
Assy 27-13
Assy 27-46
LINK X-ARM DRILLING DETAIL
(500 Intervals)
Refer note 10 Sh 2
(2700x100x100)

Locate control cubicle on


pole to suit safe access by
vehicle for maintenance

From G.L.
2900

Cables
2700 min.
From G.L.

A ORIGINAL ISSUE APPROVED C. Noel OVERHEAD DISTRIBUTION


B SWITCHES

C
1.12.14

29.4.15
HARD COPY DATE 7/7/14
11/22/33kV 3 PHASE POLE MOUNTED SPUR ACR / SECT / LBS
PASSED C. Avenell
WITH V.T. (NOJA) CONTROL CUBICLE & X-ARM DRILLING
D 4.12.18
UNCONTROLLED Ergon Energy Corporation Ltd
DRAWN Dwg 1952 Sh 6 D
L. Burton
ABN 50 087 646 062 FILE: 5 07 1952 6
MATERIAL Tie, cable
Setscrew & Nut S/S Uncontrolled Document When Printed
Nylon Black
QTY M12 x 40 F
Washer, Rd. M20 Shroud F 1001110
I.I. No. 1727678
305-3 305-6 305-9 1777577 (L/A connection)
Washer Rd. S/S M12 F

2469773 1 0120036
1779112 Washer, Volute 2 Holes

F
2470235 1 Washer Sp. S/S M12 M20/24 22 Dia.
2470243 1 1779139 1778107 F
F
0120036 6 6 6 Washer, Sq. M20 F

1001110 6 6 6 1780594
1703271 2 2 2
Washer, Coachscrew,
1703883 2 2 2 Bolt & Nut
Sq. M16 M16 x 130
1704642 2 2 2 M16 x 130
1780586 2400648
1749263 2 2 2 1703883

F
2400648 2 2 2
Washer, Rd. M16
1777569 4 4 4 F

4 4 4 1777569
1777577
1778107 2 2 2 Bolt & Nut S/S F
F
1779112 14 14 14 M12 x 65,
F
1779139 8 8 8 1703271 2 Holes
F
1780535 2 2 2 Washer, Sq. 14 Dia.
F
1780586 2 2 2 S/S M12
1780594 2 2 2 1780535

F
1727678 6 6 6 F
Washer, Sp. F
0105120 1 1 1 Bolt & nut
S/S M12 Remote ACR /
M20 x 400
1779139 Sectionaliser / LBS
1704642
F
Nut, M16 2469773(11kV)
1749263 2470235(22kV)
Locate control cubicle
2470243(33kV)
in highest mounting Hinged Bracket
(Surge arresters
bracket holes. 0105120
omitted for clarity)
Washer Rd. S/S M12
1779112 F

Drill a 14 hole in control


ASSEMBLY 305-3 11kV 3 PHASE ACR / SECTIONALISER / LBS (NOJA RC20 OSM-SERIES) box bracket to suit top hole
ASSEMBLY 305-6 22kV 3 PHASE ACR / SECTIONALISER / LBS (NOJA RC20 OSM-SERIES) of RC20 Controller

ASSEMBLY 305-9 33kV 3 PHASE ACR / SECTIONALISER / LBS (NOJA RC20 OSM-SERIES)

A ORIGINAL ISSUE APPROVED C. Noel OVERHEAD DISTRIBUTION


ASSEMBLIES
HARD COPY DATE 3/12/18
11/22/33kV 3 PHASE SYNCHROPHASOR RC20 POLE MTD
PASSED C. Avenell ACR / SECT / LBS (NOJA OSM-SERIES) WITH VT & WIRED
UNCONTROLLED Ergon Energy Corporation Ltd
DRAWN L. Burton Page 305
ABN 50 087 646 062 FILE: 5 01 2062 1

You might also like