0% found this document useful (0 votes)
27 views

East 1 3: Unit 1 Is D 4

The document summarizes the generation capacity and spinning reserve availability of multiple generation units across two regions, West and East. It lists the active power output and spinning reserve contribution of each unit. It then analyzes the impact of losing each individual unit and determines that the spinning reserves are sufficient to meet the power deficiency in each case. Finally, it provides a priority list of generation units and calculates the optimal dispatch using priority order versus generation load sharing to serve a total load of 400MW, determining that using priority order is cheaper.

Uploaded by

MahirChoudhury
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

East 1 3: Unit 1 Is D 4

The document summarizes the generation capacity and spinning reserve availability of multiple generation units across two regions, West and East. It lists the active power output and spinning reserve contribution of each unit. It then analyzes the impact of losing each individual unit and determines that the spinning reserves are sufficient to meet the power deficiency in each case. Finally, it provides a priority list of generation units and calculates the optimal dispatch using priority order versus generation load sharing to serve a total load of 400MW, determining that using priority order is cheaper.

Uploaded by

MahirChoudhury
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Question1 alcott

11173040

Spinning reserves MahirChoudhury

West Total West Load


Unit 1 10 9 1 Mw is 20MW
Unit 2 g 4 4MW
Unit 3 8 D 4MW

9 141 4 17220

East
Unit 1 12 10 2 Total east load is 1
Unit 2 G 3 3

10 3 13710

loss of unit condition

Unit 1 loss
Pout 8 18 16MW 574
Spinreserve
Pdeficiency 20 16 4MW
deficiency can be
met
Unit 2 loss same w Unit 3
Pout _10 8 18MW Spin Reserve 5 2
Pdeticiency 20 18 2 MW
deficiency can be
met

Unit 4 loss
Pout 8 18 6 MW Spin reserve 9 4
10 6 4 Mw
Pdeficiency deficiency can be
met
units loss
pout 12MW Pdemand

Units Region generation spin reserve


1 1 Deficit
4 9
2 West 17 required
fromEast
4
4 2 s
East 13 sforeffest
5 3
Totals 20
Generating Priority list
11.154 27 0 0.001312705 316635
Ffp 60
2144 32
FzCP2 52 11.336 180 10.0016118072
Fz Pz _52 114.541480 10,0016 18072 2721.22

27 0 11.856
26 0013
ftp 11.154

dFz 336 1210.0016


1801 11.912
Ip
210.0016 1801 15 117
dgpI 14.541

Priority

Gen ID Priority Inc Fuel Cost Min Max


1 I 11.856 90 270
2 2 11 912 SO 180

3 3 15 117 50 180
ll 154 26.0013 Pi X
ftp.I

11.336 1210.0016 P2 X
dd
z

P 1 Pz 400

Solve

P 252.07MW f 252.07 2954.18


Pz 147.93MW f 147.93 1798.97
400MW 4753.13

OR load 270MW on GL and 130 on GZ

P 270MW f 2707 3166 35


Pz 130 MW f 130 1552.72
400MW 4719.07
Priority method
is cheaper

You might also like