1. The document presents calculations to optimize generation dispatch across multiple power plants (P1, P2, P3) given demand and transmission constraints. It iteratively solves for optimal values of P1, P2 and P3 that minimize total cost while meeting demand. 2. The second problem optimizes generation dispatch between two power plants (P1 and P2) to meet a total demand of 900MW. It iteratively solves for optimal values of P1, P2 and Pz that minimize total cost. 3. The third problem considers transmission losses between two areas (P1 and P2) connected by a transmission line. It solves for optimal dispatch across P1 and P2 to minimize

Uploaded by

MahirChoudhury
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views

Alc071 - 11173040 - Assignment 2

1. The document presents calculations to optimize generation dispatch across multiple power plants (P1, P2, P3) given demand and transmission constraints. It iteratively solves for optimal values of P1, P2 and P3 that minimize total cost while meeting demand. 2. The second problem optimizes generation dispatch between two power plants (P1 and P2) to meet a total demand of 900MW. It iteratively solves for optimal values of P1, P2 and Pz that minimize total cost. 3. The third problem considers transmission losses between two areas (P1 and P2) connected by a transmission line. It solves for optimal dispatch across P1 and P2 to minimize

Uploaded by

MahirChoudhury
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Question 1

Incremental cost
FC 8a 0.005 0.8 6 72 t 0.004A X G
ftp.T nddttpf

6.42610.0165Pz 12 G
1 FC 6.3 0.0162Pa 1.02
gdpF
z 2

gdpI3 dip3 FC 7.5 0.005B 0.9 675 0.0045Ps 73 G


z

Error PD P Pz Pz 90 P Pz Pz 4

X X 72 73 sub X 7.0 1MW hr


P 70MW
Pz 34.74MW
Pz 55.56MW
Error 739.7MW

increased by 10 and recalculate outputs 7 7.7

P 245MW
Pz 77.1MW

P 211.1MW
Error 366.79MW
increased by 10 and recalculate outputs 7 8 47
P _437.5MW biggerthan Pmax use Rs350MW
P2 123.7mW

P 382.22MW
Error 43 4MW

Set P _350MW andrecalculate Pr Pz error


Pz 1237MW
Pz 38222MW
Error 94.079MW
So X is between 8.12 and 8.97 Mwh
Since error 0 increase A by 2 1 8 639 MWhr
new values
P 350MW
Pz 133.95MW
Pz 419.867MW
Error 3.817MW

so use linear interpolation


0
Error 13.817 44.079 3.817
X 8 6394 8.47 8.6394
1 8.6259 81MW hr
with 1 8625911MWhr
Pi 350MW
Pz 133.134MW
Pz 416.867MW
Error O 00029MW close to 0

so H t Hz H3 2777 t 1745 54 3564.85


Totalcost 8087 39 MWhr

Question 2

Total demand 900MW


Fi 180 t 6.72P t 0.002P2 Dddp 0.004R t 6 72
DdI2 0.0165Pz t 6.42
Z
Fz 743.58 t G426Pa 10.008262Pz
dB
Fz 360 t 6.75B t O00225BZ dis 0.0045Pz t 6.75
dB

Let Pz bedependant
Pp PitPz1Pz
Pz Pp Pi Pz 900 Pi P2 MW
Totalcost Fi R 1Fz Pz Fz B
n
n ni
p
t.tt
p

h
at
P 900 P Pz

n iteration
Iteration 1 guesses

P 300MW Pz 150MW Pg 450MW 4 10

iiiHis 3 it i.is sHi


Totalcost_8115.3
dnuPj
900 308.55 148.704 442.746MW
hr

Iterations Pl Pz B Total
I 308.55 148.70 44275 8115.3
2 316.43 147.30 436.27 8109.13
3 323 71 195.83 430.96 8103.82
4 330.43 144.34 425.22 8099.25
5 336.65 142.87 420 48 8095.308
6 342 40 141.42 416.17 8091.91
7 347.74 140.02 412.24 8088 98
8 352.68 138 67 408.64 8086.45
q 350 138.67 411 33 8087.71
to 350 137.51 412.49 8087.59
11 350 136,59 413.41 8087.51
12 350 135.86 414.14 8087.46
13 350 135.29 414.71 8087.43
14 350 134.84 415.16 8087.42

X is quicker than gradient


Question3
I
1.0526
Penalty factor L PE I 2Rosse
JR
Pi Load Xmission Losses

P 1P2 1000MW l

dfidp O.IR IS

dFz
O 08Pa 120
DPT

A Pfi ftp.I D PF PE

O lP t 15 0.0842Pz 121 OS 2

Solve I 2

P 490MW Pz 510MW 4 64 MWhr

F CP 0.0514905 151490 1600


F Pi 19955 Hhr Sum for total cost 41259 hr
Fz Pz 21304 hr