Estimate Thesis
Estimate Thesis
I. GENERAL REQUIRMENTS
1.00 Permits 1.00 lot
II. OTHERS
2.01 Mobilization/Demobilization 1.00 lot
2.02 Equipment Charges & Temporary Facilities 1.00 lot
2.03 Electric Consumption 1.00 lot
2.04 Water Consumption 1.00 lot
2.05 Demolition works & Hauling and Disposal 1.00 lot
2.06 Consumables 1.00 lot
III. SITE WORKS
3.1 EARTH WORKS
3.1.1 Lay Out and Staking 1.00 lot
3.1.2 Site Clearing, Earth Works & Hauling 1.00 lot
3.1.3 Excavation Works
a. Footing Tie-Beam/Wall Footing 4.40 m³
b. Septic Tank m³
3.1.4 Gravel Bed and Compaction m³
3.1.5 Soil Poisoning/Termite Proofing m²
IV. STRUCTURAL WORKS
4.1 CONCRETING WORKS
4.1.1 Concrete C20 Ready Mix m³
a. Suspended Slab
1 Gravel 29.30 m³
2 Sand 14.65 m³
3 Cement 220.00 Bags
b. Wall Footing
1 Gravel
2 Sand
3 Cement
c. Concrete Stairs & Steps
1 Gravel m³
2 Sand m³
3 Cement Bags
d. Septic tank & Catch Basin
1 Gravel m³
2 Sand m³
3 Cement Bags
e. Slab on Grade
1 Gravel 29.91 m³
2 Sand 14.96 m³
3 Cement 224.00 Bags
f. RC Wall (Ground Floor)
1 Gravel 43.97 m³
2 Sand 221.60 m³
3 Cement 330.00 Bags
g. RC Wall (Second Floor)
1 Gravel 41.63 m³
2 Sand 209.79 m³
3 Cement 312.00 Bags
4.2 FORM WORKS
a. Suspended Slab
1 1/2 Ordinary plywood Pcs
2 2"x3"x12' coco lumber bf
b. Tie-Beam & Footing
1 1/2 Ordinary plywood Pcs
2 2"x3"x12' coco lumber bf
c. Concrete Stairs & Steps
1 1/2 Ordinary plywood Pcs
2 2"x3"x12' coco lumber bf
d. Septic tank & Catch Basin
1 1/2 Ordinary plywood Pcs
2 2"x3"x12' coco lumber bf
e. RC Wall (Ground Floor)
1 1/2 Ordinary plywood Pcs
2 2"x3"x12' coco lumber bf
f. RC Wall (Second Floor)
1 1/2 Ordinary plywood Pcs
2 2"x3"x12' coco lumber bf
g. Slab on Grade
1 1/2 Ordinary plywood Pcs
2 2"x3"x12' coco lumber bf
4.3 STEEL WORKS (Rebars)
4.3.1 Rebar#9.5 5,096.97 kgs
4.3.2 Rebar#10 7,534.00 kgs
4.3.3 Rebar#15.9 3,655.57 kgs
4.3.4 Rebar#16 10,385.39 kgs
4.3.5 Rebar#25 6,747.31 kgs
4.3.6 Rebar#25.4 2,207.36 kgs
4.3.7 Rebar#32 2,472.00 kgs
4.3.8 Rebar#32.3 745.64 kgs
4.3.9 Tie Wires kgs
V. CEILING WORKS (Cement board on metal frame)
5.1 Cement Board pcs
5.2 Metal Furring pcs
5.3 Carrying Channel pcs
5.4 Wall Angle pcs
5.5 Blind Rivet box
5.6 Black Screw pcs
VI. METAL FABRICATION
6.1 Roof Truss
1 LC 100x50x15x1.5mm x 6m pcs
2 50 x 50 x 3mm thk. Angular Cleat pcs
3 10mm Plain Bar Sagrod pcs
4 10mm Anchor Bolt pcs
6.2 Handrail
VII. PAINTING
7.1 Interior wall (Semigloss)
a. Smooth Face paint
a.b Boysen Semi Gloss Acrytex (2nd and 3rd coat) 36.00 Gal
a.b Boysen Semi Gloss latex (2nd and 3rd coat) 34.00 Gal
D-2 0.9m x 2.m 40mm thickness "Flush Door-with Louver" 27.00 set
D-3 2.1m x 2m 35mm thickness " Double Glazed Door" 2.00 set
D-1 4 pcs. 3-1/2" x 3-1/2" Ball bearing loose pin hinges 1.00 set
a. Cement Bags
XIV. ROOFING
2,019.00 pcs
14.1 Roof Tiles
pcs
14.2 Reflective Sheets
14.3 Gable End tile 2.00 pcs
- 0.00 0.00
0 0.00 0.00
- 0.00 0.00
- 0.00 0.00
4543.96
0.00
430.00 12,600.72 120.40 3,528.20 16,128.92
2,415.00 35,384.58 676.20 9,907.68 45,292.26
240.00 52,800.00 67.20 14,784.00 67,584.00
- - 0.00 0.00
- - 0.00 0.00
- - 0.00 0.00
- - 0.00 0.00
- - 0.00 0.00
- - 0.00 0.00
- - 0.00 0.00
0.00
0.00
0.00
0.00
0.00
-
60.00 540.00 16.80 151.20 691.20
66.00 66.00 18.48 18.48 84.48
275.00 2,750.00 77.00 770.00 3,520.00
65.00 390.00 18.20 109.20 499.20
122.00 244.00 34.16 68.32 312.32
4,450.00 4,450.00 1,246.00 1,246.00 5,696.00
365.00 2,190.00 102.20 613.20 2,803.20
55.00 55.00 15.40 15.40 70.40
76.00 76.00 21.28 21.28 97.28
0.00
0.00
- - 0.00 0.00