09-Jan-18
Remarks:
* Plant Status
> Plant Load 23.5 MT/hr, Grade:B5004
> RR-201/RR-221 Catalyst feeding done at 11hrs/14hrs respectively, RR-201/RR-221 Ethylene feeding done at 12hrs/15hrs respectively
> EE-224B Circuit boxed up done, leak test also done. N2 PDP is u/p.
> Extruder Started at 17:30hr, Load: 24.5 MT/hr.
Concern
*
Concern Action Plan* Action By Target Date
Dryer chest pressure High on higher load. EE-301cleaned but no improvement found.
MM not
Additive stock critically low. Technical Evaluation Completed. Materials
confirmed
1) Expedite Approval and PO.
RR-201 & RR-221 Teal flow meter not working Instrumentation
2) To install flowmeter after receipt.
Steam leakages arrested in Shutdown. New Instrumentation/M
B/L HP Steam Flowmeter showing higher value
leakage developed. DP increased due to ech
Elutriator system not working properly SECL to consult with Vendor for modification SECL
NA** : Totalizer not working properly( HP steam B/L flowmeter showing high value due to high pressure drop)
** Detail action plan submitted by Maintenance seperately.