Inprocess Inspection - Quantity Confirmation During Results Recording

This document describes the process for quantity confirmation during quality inspection results recording for 03 inspection types in SAP. [1] The key steps include assigning the 03 inspection type in the material master, assigning inspection characteristics in the routing, creating a production order, recording inspection results and confirming quantities in QE01, triggering defect notifications, reworking defects, and making the final usage decision. [2] The process ensures quality inspects and confirms quantities before production continues, and defects are communicated via a notification to production. [3] 03 inspection types enable quality to inspect and confirm work-in-progress quantities at specific production operations.

Uploaded by

PRATAP SAPMM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
83 views10 pages

Inprocess Inspection - Quantity Confirmation During Results Recording

This document describes the process for quantity confirmation during quality inspection results recording for 03 inspection types in SAP. [1] The key steps include assigning the 03 inspection type in the material master, assigning inspection characteristics in the routing, creating a production order, recording inspection results and confirming quantities in QE01, triggering defect notifications, reworking defects, and making the final usage decision. [2] The process ensures quality inspects and confirms quantities before production continues, and defects are communicated via a notification to production. [3] 03 inspection types enable quality to inspect and confirm work-in-progress quantities at specific production operations.

Uploaded by

PRATAP SAPMM
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 10

Former Member 

March 3, 2014 4 minute read

Inprocess Inspection – Quantity


Confirmation during Results Recording
0 Likes 2,328 Views  8 Comments 

Introduction:

This Blog gives an in sight on how quantity confirmation are carried out during results recording with 03
inspection type.

Requirement:

During manufacturing of product there are certain inprocess operations which will be cleared by production
department sequentially and some particular operation which needs to be inspected by quality department.
Based on the inspection results quantity needs to be confirmed and notification to be triggered for the defects
to production dept. During results recording quality department require to view the confirmation screen to
record the yield, scrap and rework quantity. Based on the confirmations entered by quality department further
activity will be carried out by the production department for the subsequent operations.

Configuration Used:

No specific configuration is required in Quality Management.

Confirmation Parameters: (OPK4)

Process Steps used:


1. Assigning 03 Inspection type in Material Master (MM02)
2. Assigning Master Inspection Characteristics in Routing (CA02)
3. Create Production order/Release (CO01)
4. Confirmation of operations (CO11N)
5. Results Recording (QE01) and Trigger Notification for defects
6. Final Confirmation and Auto GR
7. Usage Decision (QA11)

Process Steps with screen shots:

Step 1: Assigning 03 inspection type in Material Master (MM02)

03 Inspection Type is assigned in Material Master as displayed below

Step 2: Assigning MIC in Routing (CA02)

0010 and 0020 are Production Operations.

0030 is Quality operation where quality department will inspect and enter the results, yield, scrap and rework

0040 is final operation for production department.

In Routing for 0030 operation, MIC’s as displayed below are assigned.

Step 3: Create and release production order (CO01)


Production Order 60004172 created and released. System generated in process inspection lot 30000002532

Step 4: Confirmation of operations (CO11N)

System Check : If Quality team tries to confirm operation 0030 prior to confirmation of 0010 and 0020
production operations then system will not allow to confirm the quantity with message as “Preceding operation
is not yet confirmed” .This is because of the OPK4 confrimation config settings.

Operations 0010 and 0020 operations are confimed by production dept.

Step 5: Results Recording (From QA32 or QE01) and Trigger Notification for defects

Quality dept enters the results in QE01 against the lot and operation number. Results are entered as given
below. One characterisctic is rejected as results are not within the specification. Now this defect information
needs to be communicated to production dept through notification. As shown below click on create defect.

System will pop up the Defect overview sreen as shown below. Enter the code group and code, enter the
defect quantity. Then click on continue system will trigger notification in backend on save of the results. F3
notification type is used.
For confirming the quantity Go to Menu – Edit – Confirm Activities as displayed below.

System will pop up the confirmation screen as displayed below. Since there is defect all the 20 qty is send for
rework.
On SAVE of the results below notification 565 is created for defect quantity with reference to the inspection lot
number and order number. Further notification is processed by production dept and finally re-offered for quality
inspection.
Re-Inspection by Quality Dept: Quality dept does results recording and updates the new results as given below.

Since 20 qty is under rework now quality team needs to move the same from rework to yield. As results are
now as per specifications, quality team needs to cancel the rework in CO13 and again confirm the Yield in
QE01.

Cancel order confirmation (CO13): Enter the order number and operation number and click on SAVE as
displayed below. Rework qty will be reversed.
Go to QE11 – Enter the inspection lot. From Menu bar -Go to Edit – Confirm Activities. Below screen will be
displayed. Enter the yield quantity and  SAVE. Now rework qty of 20 is cleared as Yield 20 qty.
Step 6: Final confirmation and Auto GR (CO11N):

Production Confirms the final operation 0040 and Auto GR is completed. Stock updated in MMBE as displayed
below.
Step 7: Usage Decision ( QA32/QA11):

Usage decision completed for inspection lot as given below.


Conclusion: Above process is apt where production operations are to be certified by quality department.