Site Inspection and Test Record: 534/22/3 Alfanar Sec-Cta Of3 S/S 9015 S10348

1. A site inspection and test was conducted on a current transformer at substation 9015. 2. Testing included megger tests, polarity tests, winding resistance measurements, ratio tests, and magnetic curve analysis. 3. Test results were recorded for each core and phase of the current transformer. Oil level was also checked.

Uploaded by

essam khalil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views4 pages

Site Inspection and Test Record: 534/22/3 Alfanar Sec-Cta Of3 S/S 9015 S10348

1. A site inspection and test was conducted on a current transformer at substation 9015. 2. Testing included megger tests, polarity tests, winding resistance measurements, ratio tests, and magnetic curve analysis. 3. Test results were recorded for each core and phase of the current transformer. Oil level was also checked.

Uploaded by

essam khalil
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

SITE INSPECTION AND TEST RECORD

ATS
Description: Order no.: Record no. :
CURRENT TRANSFORMER 534/22/3
Customer: End Client: Sheet:
ALFANAR SEC-CTA of3
Site: Panel / Designation / Location no.: Project no.:
S/S 9015 S10348

A. GENERAL DATA AND INFORMATION:

BAY:___________________ SERIAL NO : R ---------------- Y --------------- B ----------------

CT TYPE:________________

MAKE:__________________

Core No. Ratio Class Rct Burden Vkp DUTY

Core 1 (1S1-1S3)

Core 1 (1S2-1S3)

Core 2 (2S1-2S3)

Core 2 (2S2-2S3)
1) Megger Test:
Phase R Y B
Terminals Pri- E Sec.- E Pri-Sec Pri- E Sec.- E Pri-Sec Pri- E Sec.- E Pri-Sec

Core 1(1S1-1S3)

core1(1S2-1S3)

Core 2(2S1-2S3)

Core2(2S2-2S3)

PRIMARY TEST 5000 V DC - 1.0 MIN.

Tested by Witnessed by:


Name : Name
Signature & Date: Signature & Date:
SITE INSPECTION AND TEST RECORD
ATS
Description: Order no.: Record no. :
CURRENT TRANSFORMER 534/22/3
Customer: End Client: Sheet:
ALFANAR SEC-CTA of3
Site: Panel / Designation / Location no.: Project no.:
S/S 9015 S10348

SECONDARY TEST 1000 V DC - 1.0 MIN.

2) Polarity Test:

P1 P2

S1 S2

CORE RATIO DETAILS PHASE-R PHASE-Y PHASE-B

TERMINAL
1S1-1S3
POLARITY
CORE 1
TERMINAL
1S2-1S3
POLARITY

TERMINAL
2S1-2S3
POLARITY
CORE 2
TERMINAL
2S2-2S3
POLARITY

Tested by Witnessed by:


Name : Name
Signature & Date: Signature & Date:
SITE INSPECTION AND TEST RECORD
ATS
Description: Order no.: Record no. :
CURRENT TRANSFORMER 534/22/3
Customer: End Client: Sheet:
ALFANAR SEC-CTA of3
Site: Panel / Designation / Location no.: Project no.:
S/S 9015 S10348

3) CT WINDING RESISTANCE:

CORE 1 CORE 2
PHASE
1S1-1S3 1S2-1S3 2S1-2S3 2S2-2S3

T= Degree.

4) CT RATIO TEST:

CT RATIO:

SECONDARY CURRENT MEASURED


INJECTED
PHASE PHASE R PHASE Y PHASEB RATIO
CURRENT
core1 core2 core1 core2 core1 core2 core1 core2

5) CT MAG. CURVE:

See the attached sheets

Tested by Witnessed by:


Name : Name
Signature & Date: Signature & Date:
SITE INSPECTION AND TEST RECORD
ATS
Description: Order no.: Record no. :
CURRENT TRANSFORMER 534/22/3
Customer: End Client: Sheet:
ALFANAR SEC-CTA of3
Site: Panel / Designation / Location no.: Project no.:
S/S 9015 S10348

- OIL LEVEL :

Tested by Witnessed by:


Name : Name
Signature & Date: Signature & Date: