Performance Based Single Cycle Plan
Performance Based Single Cycle Plan
com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
Former Member
Overview:
Time based Maintenance will work based on Normal Daily Calendar or Plant Factory Calendar or Maintenance
Department Factory Calendar. Whatever the technique, system will calculate exact no. of days mentioned in Cycle
Frequency of Maintenance Plan. Here, scheduling will schedule & plan the call objects for the whole Scheduling
period mentioned in Maintenance plan.
But Performance based plan works in other way. Performance based plan works based on the Running Hours. KM,
etc., as Measuring points for measuring the Performance of the equipment. In this case, system plan date will keep on
gets changed based on daily usage of Equipment. It counts only Performance of the equipment, so plan date can’t be
static.
Recently, there is a thread which talks about different scenario & different queries by the Author.
To answer his questions as well as to make this process understandable for everyone, this document has been created.
Master Data:
All Master Data (viz., Equipment, Measuring Point, Task List, Maintenance Plan) have been created.
As Measuring Point & Maintenance Plan have more importance in scheduling, those screen shots have been posted
1 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
below.
Measuring Point:
Measuring Point has been created for KM with Annual Estimate as 300. Here, Annual Estimate has been taken as half
of the Cycle Frequency for which Maintenance Order should be created. In this example, Maintenance plan call
frequency is 564 KM. (All data have been copied from that reference thread).
Maintenance Plan:
Maintenance Plan has been created with Cycle Frequency as 564 KM, Call Horizon as 100 %, Scheduling Period as 2
2 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
years, Shift Factor for Late Completion & Early Completion as 100 % and Start of Cycle reading as Zero (0).
3 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
Process Flow:
Before updating the Measurement document for KM Measuring point, it’s not possible to schedule the orders in IP10.
It will provide the Information message as “No Counter Reading found ……” & there won’t be any planned calls
generated.
So, just create the variant in IP30 (Deadline Monitoring) program with that Maintenance plan & schedule
background job for that variant in SM36.
4 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
1st Scheduling: through IP10 / IP30 (In IP30, mention the Interval for Call Objects as 7 days)
Both calls are in “ON HOLD” status as Measurement reading doesn’t match the Cycle frequency value of Maintenance
plan.
5 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
6 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
2nd Scheduling: through IP10 / IP30 (In IP30, mention the Interval for Call Objects as 7 days)
Both calls are in “ON HOLD” status as Measurement reading doesn’t match the Cycle frequency value of Maintenance
plan. But Call dates are different when compared to 1st Scheduling.
7 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
Now 1st call object has been called as Current KM Counter reading (580) crosses Maintenance plan cycle frequency
(564).
8 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
3rd Scheduling:
Scheduling has been done which has generated the Order for 564 KM. As KM reading crosses the Cycle frequency,
Call status will be as “NEW START SAVE TO CALL”.
9 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
Order generated on 564 KM reading has been executed & after finishing all the operations, PM Order TECO should be
done. While doing PM Order TECO, there is an option to create Measurement Documents. This will get updated in
IP10 scheduling against corresponding call object.
Here, Measurement document has been created say, for KM reading as 640. Here, Scenario is that Preventive
Maintenance has been done during the run of the equipment. Because of Preventive Maintenance, there is no
stoppage in usage of that Equipment. So, Initial reading (580) & Completion reading (640) are different.
10 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
11 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
4th Scheduling:
This is after creating the Measurement document while doing PM Order TECO. In below screen shot, Completion
Counter Reading for 1st Call object has been updated.
12 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
Based on Completion Reading at Previous Call Object (1st Call Object), next call object (2nd Call object) Planned
counter reading has been changed.
As per the Master data, Cycle Frequency is 564. So, 2nd Call object should have been generated as 1128. But in below
screen shot, Next planned Counter reading is showing as 1204 (640 + 564).
To make system behave this lies with Shift factor mentioned in Maintenance Plan. In Maintenance plan, it has been
mentioned as Shift factor for late completion as well as for early completion as 100 %. So, Next call object Planned
reading is getting shifted 100 %.
13 of 14 19-11-2020, 20:08
Behavior of Performance Based Plan in SAP Plant Maintenance | SAP Blogs https://blogs.sap.com/2014/06/17/behavior-of-performance-based-plan-in-sap-plant-maintenance/
If there should not be any shift in this Planned Counter Reading for Subsequent call objects, then Shift Factor for
Early or Late completion % should not be maintained.
Here Annual Estimate has been Maintained with some unrealistic value as 300 KM. So by maintaining some small
value in Annual Estimate (approx half of the Cycle frequency), system will only consider the Measurement document
reading i.e., Maintenance will be purely on Performance based.
14 of 14 19-11-2020, 20:08