03-Overview of Steps in Execution of A Project
03-Overview of Steps in Execution of A Project
the evaluation can be based on only the cost for the technically qualified
bidders or ,
It could be based on a composite score based on evaluation of technical
and financial bits.
2016-2017 Engineering Faculty
NIT