SOP02 - F26 - R00 Pipe Stringing Report 1

This pipe stringing report provides details of 27 pieces of 28-inch diameter pipe installed between KP 5+954.64 to KP 5+575.01 for the EPCC of Telok Gong Loop Pipeline Project in Melaka, Malaysia. The total length of pipe installed was 189.2 meters. The report lists the pipe identification number, length installed, location points, and bend details for each pipe section. No issues were noted with the installed pipe.

Uploaded by

Faiz Ishak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
503 views12 pages

SOP02 - F26 - R00 Pipe Stringing Report 1

This pipe stringing report provides details of 27 pieces of 28-inch diameter pipe installed between KP 5+954.64 to KP 5+575.01 for the EPCC of Telok Gong Loop Pipeline Project in Melaka, Malaysia. The total length of pipe installed was 189.2 meters. The report lists the pipe identification number, length installed, location points, and bend details for each pipe section. No issues were noted with the installed pipe.

Uploaded by

Faiz Ishak
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 12

REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

Start KP : KP 5+954.64 to KP 5+765.44

PIPE IDENTITY TOTAL LENGTH KP NO. BEND


REMARK
ITEM SIZE PIPE NO. ACTUAL LOC. VERT' HORIZ.
KP 5+954.64
21421
1 28'' 11.96 KP 5+564.74 SB 9.5° N/A
G04518
KP.05
20881
2 28'' 11.11 KP 5+588.66 OB 11° N/A
G04603
KP.05
21337
3 28'' 11.96 KP 5+552.78 OB 9.5° N/A
G04518
KP.05
21571
4 28'' 11.96 N/A N/A N/A
G04442
KP.05
20397
5 28'' 11.96 N/A N/A N/A
G04516
KP.05
20106
6 28'' 11.96 N/A N/A N/A
G04516
KP.05
21518
7 28'' 11.95 N/A N/A N/A
G04440
KP.05
21174
8 28'' 11.96 N/A N/A N/A
G04515
KP.05
21375
9 28'' 11.96 N/A N/A N/A
G04438
KP.05
20688
10 28'' 11.90 N/A N/A N/A
G04603
KP.05
21268
11 28'' 11.96 N/A N/A N/A
G04603
KP.05
20664
12 28'' 11.58 N/A N/A N/A
G04603
KP.05
20839
13 28'' 11.96 N/A N/A N/A
G04603
KP.05
20520
14 28'' G04515 11.96 N/A N/A N/A
KP.05
21638
15 28'' 11.10 N/A N/A N/A
G04442
KP.05
20039
16 28'' 11.96 N/A N/A N/A
G04441
KP.05
TOTAL 189.2 N/A N/A N/A

CONTRACTOR'S INSPECTOR CLIENT'S INSPECTOR

NAME : NAME :

DATE : DATE :

LEGEND : OB : Over Bend, SAG : Sag Bend, SBL : Side Bend, SBR : Side Right, C : Combination, Vert' : Vertical, Horiz : Horinzontal
Loc. : Location

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

Start KP : KP 5+765.44 to KP 5+575.01

PIPE IDENTITY TOTAL LENGTH KP NO. BEND


REMARK
ITEM SIZE PIPE NO. ACTUAL LOC. VERT' HORIZ.
KP.05
21715
17 28'' 11.58 N/A N/A N/A
G04439
KP.05
21480
18 28'' 11.96 N/A N/A N/A
G04440
KP.05
20538
19 28'' 11.46 N/A N/A N/A
G04516
KP.05
20674
20 28'' 11.96 N/A N/A N/A
G04441
KP.05
20452
21 28'' 11.96 N/A N/A N/A
G04442
KP.05
21070
22 28'' 11.96 N/A N/A N/A
G04440
KP.05
21366
23 28'' 11.95 N/A N/A N/A
G04608
KP.05
20668
24 28'' 11.96 N/A N/A N/A
G04603
KP.05
20646
25 28'' 11.96 N/A N/A N/A
G04608
KP.05
21202
26 28'' 11.96 N/A N/A N/A
G04441
KP.05
21120
27 28'' 11.96 N/A N/A N/A
G04518
KP.05
20896
28 28'' 11.96 N/A N/A N/A
G04439
KP.05
20898
29 28'' 11.96 N/A N/A N/A
G04605
KP.05
20915
30 28'' G04438 11.96 N/A N/A N/A
KP.05
21154
31 28'' 11.96 N/A N/A N/A
G04441
KP.05
21241
32 28'' 11.92 N/A N/A N/A
G04441
KP.05
TOTAL 190.43

CONTRACTOR'S INSPECTOR CLIENT'S INSPECTOR

NAME : NAME :

DATE : DATE :

LEGEND : OB : Over Bend, SAG : Sag Bend, SBL : Side Bend, SBR : Side Right, C : Combination, Vert' : Vertical, Horiz : Horinzontal
Loc. : Location

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

Start KP : KP 5+575.01 to KP 5+393.26

PIPE IDENTITY TOTAL LENGTH KP NO. BEND


REMARK
ITEM SIZE PIPE NO. ACTUAL LOC. VERT' HORIZ.
KP.05
21074
33 28'' 11.96 N/A N/A N/A
G04438
KP.05
21090
34 28'' 11.10 N/A N/A N/A
G04438
KP.05
21004
35 28'' 11.96 N/A N/A N/A
G04438
KP.05
21379
36 28'' 11.96 N/A N/A N/A
G04440
KP.05
20591
37 28'' 11.96 N/A N/A N/A
G04439
KP.05
20738
38 28'' 11.58 N/A N/A N/A
G04608
KP.05
20870
39 28'' 11.96 N/A N/A N/A
G04439
KP.05
20302
40 28'' 11.79 N/A N/A N/A
G04441
KP.05
21252
41 28'' 11.95 N/A N/A N/A
G04442
KP.05
20312
42 28'' 11.96 N/A N/A N/A
G04519
KP.05
20450
43 28'' 11.96 KP 5+018.56 N/A RB 16°
G04441
KP.05
21081
44 28'' 11.96 KP 5+054.43 CMB 16°
G04441
KP.05
21061
45 28'' 11.91 KP 5+030.51 OB 9° N/A
G04439
KP.05
21329
46 28'' G04605 11.96 N/A N/A N/A
KP.05
10028
47 28'' 3.82 N/A HOT BEND 30°
G04521
KP.05
20622
48 28'' 11.96 N/A N/A N/A
G04605
KP.05
TOTAL 181.75 N/A N/A N/A

CONTRACTOR'S INSPECTOR CLIENT'S INSPECTOR

NAME : NAME :

DATE : DATE :

LEGEND : OB : Over Bend, SAG : Sag Bend, SBL : Side Bend, SBR : Side Right, C : Combination, Vert' : Vertical, Horiz : Horinzontal
Loc. : Location

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

Start KP : KP 5+393.26 to KP 5+202.53

PIPE IDENTITY TOTAL LENGTH KP NO. BEND


REMARK
ITEM SIZE PIPE NO. ACTUAL LOC. VERT' HORIZ.
KP.05
21253
49 28'' 11.57 N/A N/A N/A
G04441
KP.05
20841
50 28'' 11.96 N/A N/A N/A
G04519
KP.05
20545
51 28'' 11.96 N/A N/A N/A
G04608
KP.05
20540
52 28'' 11.96 N/A N/A N/A
G04440
KP.05
20504
53 28'' 11.96 N/A N/A N/A
G04440
KP.05
20166
54 28'' 11.96 N/A N/A N/A
G04516
KP.05
20756
55 28'' 11.96 N/A N/A N/A
G04441
KP.05
20431
56 28'' 11.96 N/A N/A N/A
G04605
KP.05
21486
57 28'' 11.96 N/A N/A N/A
G04440
KP.05
20749
58 28'' 11.96 N/A N/A N/A
G04605
KP.05
21328
59 28'' 11.96 N/A N/A N/A
G04605
KP.05
21354
60 28'' 11.72 N/A N/A N/A
G04518
KP.05
20001
61 28'' 11.96 N/A N/A N/A
G04441
KP.05
21471
62 28'' G04518 11.96 N/A N/A N/A
KP.05
20350
63 28'' 11.96 N/A N/A N/A
G04605
KP.05
20624
64 28'' 11.96 N/A N/A N/A
G04605
KP.05
TOTAL 190.73

CONTRACTOR'S INSPECTOR CLIENT'S INSPECTOR

NAME : NAME :

DATE : DATE :

LEGEND : OB : Over Bend, SAG : Sag Bend, SBL : Side Bend, SBR : Side Right, C : Combination, Vert' : Vertical, Horiz : Horinzontal
Loc. : Location

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

Start KP : KP 5+202.53 to KP 5+012.04

PIPE IDENTITY TOTAL LENGTH KP NO. BEND


REMARK
ITEM SIZE PIPE NO. ACTUAL LOC. VERT' HORIZ.
KP.05
20903
65 28'' 11.96 N/A N/A N/A
G04603
KP.05
20460
66 28'' 11.96 N/A N/A N/A
G04442
KP.05
21070
67 28'' 11.96 N/A N/A N/A
G04438
KP.05
20943
686 28'' 11.95 N/A N/A N/A
G04438
KP.05
21006
69 28'' 11.10 N/A N/A N/A
G04519
KP.05
20784
70 28'' 11.96 N/A N/A N/A
G04605
KP.05
20144
71 28'' 11.96 N/A N/A N/A
G04516
KP.05
20629
72 28'' 11.96 N/A N/A N/A
G04438
KP.05
20783
73 28'' 11.96 N/A N/A N/A
G04608
KP.05
20713
74 28'' 11.96 N/A N/A N/A
G04519
KP.05
20842
75 28'' 11.96 KP 4+635.14 SB 16° N/A
G04516
KP.05
21242
76 28'' 11.96 KP 4+671.02 OB 12° N/A
G04516
KP.05
20831
77 28'' 11.96 KP 4+647.10 SB 16° N/A
G04608
KP.05
21116
78 28'' G04441 11.96 KP 4+623.18 SB 8.5° N/A
KP.05
20830
79 28'' 11.96 KP 4+360.43 SB 16° N/A
G04603
KP.05
21013
80 28'' 11.96 KP 4+250.55 OB 7° N/A
G04518
KP.05
TOTAL 190.49

CONTRACTOR'S INSPECTOR CLIENT'S INSPECTOR

NAME : NAME :

DATE : DATE :

LEGEND : OB : Over Bend, SAG : Sag Bend, SBL : Side Bend, SBR : Side Right, C : Combination, Vert' : Vertical, Horiz : Horinzontal
Loc. : Location

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

Start KP : KP 5+012.04 to KP 4+857.88

PIPE IDENTITY TOTAL LENGTH KP NO. BEND


REMARK
ITEM SIZE PIPE NO. ACTUAL LOC. VERT' HORIZ.
KP.05
20970
81 28'' 11.96 N/A N/A N/A
G04439
KP.05
21606
82 28'' 11.96 N/A N/A N/A
G04442
KP.05
20065
83 28'' 11.96 N/A N/A N/A
G04441
KP.05
20349
84 28'' 11.96 N/A N/A N/A
G04609
KP.05
20824
85 28'' 11.96 N/A N/A N/A
G04603
KP.05
20115
86 28'' 11.96 N/A N/A N/A
G04438
KP.05
21703
87 28'' 11.50 N/A N/A N/A
G04439
KP.05
21662
88 28'' 11.10 N/A N/A N/A
G04440
KP.04
21001
89 28'' 11.96 KP 4+475.80 OB 9° N/A
G04439
KP.04
21056
90 28'' 11.96 KP 4+451.96 OB 7.5° N/A
G04438
KP.04
21022
91 28'' 11.96 KP 4+348.47 SB 5° N/A
G04440
KP.04
20676
92 28'' 11.96 KP 4+428.12 OB 6° N/A
G04603
KP.04
21129
93 28'' 11.96 KP 4+300.49 OB 7.5° N/A
G04440

TOTAL 154.16

CONTRACTOR'S INSPECTOR CLIENT'S INSPECTOR

NAME : NAME :

DATE : DATE :

LEGEND : OB : Over Bend, SAG : Sag Bend, SBL : Side Bend, SBR : Side Right, C : Combination, Vert' : Vertical, Horiz : Horinzontal
Loc. : Location

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00
REPORT NO :

DATE : 5-Mar-18
PIPE STRINGING REPORT INSPECTION Gr :

WORK/JOB NO : 1710J-86
CLIENT : PETRONAS GAS BERHAD
PROJECT NAME : EPCC OF TELOK GONG LOOP PIPELINE PROJECT,
MELAKA (TUAH)

LEGEND: ACC : ACCEPT, REJ : REJECT, N.A : NOT APPLICABLE DOCUMENT NO.: SOP02_F26_R00