Pyramids higher institute
P.H.I For Engineering And Technology
Highways and Airports
B.Sc Graduation Project 201
NOTES:
1-All drawings should be checked
according to the consultant and
construction limits.
2-The Designed speed is 40 km/h
3-All Horizontal curves are 8m
radius unless otherwise noted.
4-All Curbs are Standard
Station Barrier Curbs 12.5*30*15 cm
5-All Cross slopes are 2% for
Existing LVL. the Carriage way, Median and Sid
walks. KEY WORDS
Finished LVL.
Symbol Name
RD ROAD
M Main
S Secondary
LP Loop
CR Curve
P Point
R Ring
F.L Finished Level
STN Station
SUPERVISORS:
DR/MOHAMMED IBRAHEM
ENG/MAHMOUD EL-HAWARY
Station Station Name: Date 9/7/2016
Station Existing LVL. ESLAM MOHAMED BELAL
Existing LVL.
20110116
Existing LVL.
Finished LVL. Finished LVL. DRAWING TITLE:
Finished LVL. Profile View
Drawing No.
Scale 1:2000
07