Method Statement For Pressure Switch 2019
Method Statement For Pressure Switch 2019
METHOD STATEMENT
FOR
PRESSURE SWITCH MAINTENANCE
AND CALIBRATION SERVICE
FOR PM3 BOT POWER COMPANY (2020)
TABLE OF CONTENTS
1 Purpose 3
3 Definition 3
4 Scope of Work 3
9 Sequence of Work 5
10 Documentation 6
METHOD OF STATEMENT Code: NSC-PM3-PS
1. Purpose
This document is the guidelines to perform the calibration work for the Plant Pressure
Switch Maintenance and Calibration Services during the estimate schedule is from Phu
My 3 BOT as bellow:
2. Safety
All tools used must be checked, tested, calibrated within valid date and secure to prevent
from dropping down;
Toolbox talk shall be carried out every morning before start working day by the PM3 staff
and NSC C&I supervisor.
All of instrument calibration shall be carry out by safety rules and Risk Assessment. (See
attached file)
3. DEFINITION
- SCE: Shift Charge Engineer
- UUT: Unit under test
- HSE: Health Safety environment
- C&I: Control and Instrument
- PS: Pressure Switch
4. SCOPE OF WORK
- The tool and calibrators for calibration should have appropriate in precision, measuring
range and validated certificate.
- The contractor has to do visual check, termination and cables check, clean terminal
connectors, change the damage parts or change a new one when has the requirement
from PM3 E-C&I staff.
- To do the loop check for all the plant switches.
- The contractor has to repair for all the damage found and do the recovery for all the parts
that the contractor carelessly makes damage.
- The contractor must not change or reset any preset values, pin connection terminations
nor position of the equipment. They shall be responsible to inform to the PM3 C&I
engineers and wait for the further instruction.
- The checking and calibration condition such as temperature and relative humidity during
the time of doing validation shall be provided with the test reports and the validation
certificates.
- The contractor has to do housekeeping after finish works everyday.
- The list of instrument is in attached.
All testing equipment and tools perform the work should be check, tested and approved by
Authorized personel from Phu My 3 BOT Power Company. Attached File – List of
equipment, tools and equipment certificates.
All of instruments shall be carry out calibration at site work facility. Site Work Facility used
container 20 feet to have air condition to be control temperature at 22±5 degree and
humidity is not more than 70%RH.
METHOD OF STATEMENT Code: NSC-PM3-PS
9. SEQUENCE OF WORK
General requirements:
1. Obtain the necessary safety document from the SCE and observe all comments and
restrictions and/or limitations. Observe whether the document states that self-isolation is to
be carried out or that isolations are already in place. DO NOT tamper with or adjust any of
these isolations. If the isolation is not correct or not mechanically/electrically safe, then
refer back to the SCE. Sign the document as acceptance of its conditions.
2. Inform the Control Room operatives before proceed any work. Always keep in radio contact
with the Control Room in case the piece of equipment needs to be returned to service for
any reason.
1. Preparation
Get “Permit to work” for the instruments shall be perform calibration services.
Step 1: Obtain “Permit to Work“ and check the list of instruments to be calibrated;
Step 2: Check correctly KKS to do, check the status of pressure switch (Cover check,
connector, cable…), record if the pressure switches have problem and inform to PM3
E-C&I supervisor.
Step 3: Check isolated device and make sure that have not pressure (0 bar) before check
pressure switch. If still having pressure, discharge pressure gradually through vent;
Step 4: Open cover of pressure switches to check power, check contact NO/NC and make
sure pressure switch activate direction rising or falling follow the specification sheet
before calibration, this mean Pressure switch low or Pressure Switch high. Record
report.
AS FOUND CALIBRATION:
Step 1: Check make sure setpoint correctly before calibration according to the specification
sheet approved by PM3’ supervisor.
Step 2: Make sure pressure switch activate direction rising or falling in datasheet, this mean
pressure switch low or pressure switch high.
METHOD OF STATEMENT Code: NSC-PM3-PS
Step 3: Check PS at the set point 5 times again, if high error inform to PM3.
AS LEFT CALIBRATION:
Pressure switch shall be carry out adjust until correctly set point value as per
specification sheet accepted by PM3. And check 5 times if OK, inform PM3, if not OK
inform to PM3 to replace new device.
10. DOCUMENTATION
All the documents shall be include:
- Document title
- Document number
- Revision number
- Issued date
All information related to the works shall be record to the following documents:
- Inspection record forms
- Data sheets
- Check forms
The reports shall be submit by hard copy. The hard copy (site reports, with the
CONTRACTOR’s and the COMPANY witness’ signature) shall be submit at the end of
everyday