0% found this document useful (0 votes)
255 views6 pages

Conveyor Design Detail

Uploaded by

Azaharimahadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
255 views6 pages

Conveyor Design Detail

Uploaded by

Azaharimahadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

Sterillizer Design

Mill Throughput ( Mth) = 20 mt/hr

Sterilization Time (St) = No. of Steriliser x Cage average weight x no of cages x 60


Mill Throughput

No of Steriliser (Sn)= Mill Throughput x Sterilization Time


Cage weight x no of cages x 60

Sequencing Time (Ts) = Sterillizer Cooking Time


No of Stelillizer

Sterillizer Cooking Time (Sc) = Sterillization Time - Door Open Door Shut (DODS)

No of Lifting Cages per Hour ( Ch) = Mill Throughput


Cages Average Weight

Cages Lifting Time (Ct) = 60


No of Cages Lifting per Hour

Take; Take;
Mill Throughput ( Mth) = 20 mt/hr Sterillizer Cooking Time ( Sc) = 80 min
Cages Average Weight = 1.2 mt Cages Average Weight = 1.2 mt
DODS = 10 min DODS = 10 min
No of Cages per Sterillizer = 10 Cages No of Cages per Sterillizer = 10 Cages
No of Sterillizer = 3 Sterillizer or No of Sterillizer = 3 Sterillizer

Sterillization Time (St) = 108 min Sterillization Time (St) = 90 min

Sterillizer Cooking Time ( Sc) = 98 min Mill Throughput ( Mth) = 24 mt/hr

Sequencing Time (Ts) = 32.67 min Sequencing Time (Ts) = 30 min

No of Lifting Cages per Hour ( Cl) = 16.67 Cages No of Lifting Cages per Hour ( Cl) = 20 Cages
= 17 Cages = 20 Cages

Cages Lifting Time (Ct)= 3.529 min Cages Lifting Time (Ct)= 3 min
Oil Room Design

Mill Throughput ( Mth) = 20 mt/hr

1. Crude Oil Tank

Crude Oil Produce ( Cpr)

Cpr = Diluted Crude Oil x Mill Throughput

Take;
Diluted Crude Oil ( Dco) = 65%

Cpr = Mth (mt/hr) x Dco


= 13 mt/hr

Pumping rate must be 13 mt/hr

Crude Oil Tank Capasity ( Tco)

Tco = Crude Oil Produce x Retension Time

Take ;
Retension Time ( Rco) = 15 min
= 0.19 hr

Tco = Cpr (mt/hr) x Rco (hr)


= 2.44 mt
= 2.50 mt

2. Clarification Tank

Tank Capasity ( Tcf)

Tcf = Crude Oil Produce ( Cpr) x Retention Time ( Rcf) x Safety Factor ( Sf)

Take ;
Safety Factor ( Sf) = 1.3
Retention Time ( Rcf) = 4 hr

Tcf = Cpr (mt/hr) x Rcf (hr) x 1.3


= 67.6 mt
= 70 mt

Oil Room Design


Mill Throughput ( Mth) = 20 mt/hr

3. Pure Oil Tank

Tank Capasity ( Tpo)

Tpo = Crude Oil Produce ( Cpr) x Crude Oil Ex- Clarification Tank ( Cex)

Take ;
Crude Oil Ex- Clarification Tank ( Cex) = 40%

Tpo = Cpr (mt/hr) x 40%


= 5.20 mt
= 6.00 mt

4. Sludge Tank

Tank Capasity ( Tsg )

Tsg = Mill Throughput ( Mth ) x Sludge To FFB ( Sfb) x hour

Take ;
Sludge To FFB ( Sfb ) = 50%

Tsg = Mth (mt/hr) x Sfb x hr


= 10 mt

5. Purifier

Putifier Capasity ( Pc )

Pc = Mill Throughput ( Mth ) x Oil To FFB (OER)

Take ;
Oil To FFB (OER) = 20%

Pc = Mth (mt/hr) x OER


= 4 mt/hr

Oil Room Design


Mill Throughput ( Mth) = 20 mt/hr

6. Sludge Centrifuge

Sludge Centrifuge Capasity ( Sc )

Sc = Mill Throughput ( Mth ) x Sludge To FFB (Sfb)


= Mth (mt/hr) x Sfb
= 10 mt/hr

7. Vacuum Drier

Vacuum Drier Capasity ( Vc )

Vc = Purifier Capasity ( Pc )
= 4 mt/hr ( Minimum)
Screw Conveyor Design

Capacity ; T = Mill Capacity x Fruit into Digestor


or
T = abv mt/hrs
Ribbon
Diameter
(d)
Conveyor
where ; Main Shaft

Average
a = Average cross section area (m2) cross
a = k d2 m2 Section
(a)
4
k = Loading Factor
d = Ribbon Diameter (m)

b = Bulk Density for Fruit (kg/m3)


v = Average Speed of Travel of Material (m/hr)
v = np
Conveyor
Pitch
n = Conveyor Speed (RPM) (p)
p = Conveyor pitch ( m)

Power ; P= 3Tglu
kW
v x 0.75
where;

g = Gravitation acceleration,
g= 9.81 m/s2

l = Lengthe of conveyor (m)


u = Coeficient of friction ;
assume = 0.4

Drive efficiency = 0.75

Torque; Tt = 9550 x kW x K Nm
n

where ;

kW = Motor power
K = Service Factor = 1.5
n = Conveyor Speed (RPM)
Data Given ;

Mill Throughput ( Mth) = 20 mt/hr


Fruit to Digestor ( Fd) = 65 %

b= 0.64 mt/m3
l= 8.534 m
p= 0.381 m
n= 56 rpm
k= 30 %

T= 13 mt/hr

v= 1280 m/hr

a = 0.0159 m2

d = 0.0046 m2

P= 1.36 hp
= 1.8 kW

Motor Size = P x 1.25


= 2.25 kW

Tt = 575.56 Nm